Job Recruitment Website - Property management company - What's the procedure for redecorating the office building?
What's the procedure for redecorating the office building?
A, office building decoration fire approval procedures
1. Fill in the Declaration Form for Fire Prevention Audit of Building Interior Decoration Design and the Declaration Form for Fire Prevention Audit of Construction Site. Remember that the applicant should be the construction unit, not the construction unit. The construction unit needs to affix its official seal and present the rental agreement or purchase agreement. If it is handled by the construction unit, it can only be said that it is an agent.
2. It is necessary to prepare a copy of the drawings for the overall fire control acceptance (generally available in the property management office).
3. Two weeks before the renovation, you can submit a declaration form for fire control acceptance of construction projects, and the contents of the declaration form are basically the same as those of the declaration form. Generally, the fire brigade will randomly check 2~3 kinds of building materials for testing, and the cost of each test is about 1 1,000 yuan (PVC pipes, blockboards, curtains, etc. Most likely to be drawn).
4. It is necessary to prepare the plan, electrical diagram and fire-fighting reconstruction diagram of the specific construction site (the fire-fighting facilities can be explained in the remarks). The above drawings need to be blueprinted and stamped by units with design qualification (such as architectural design institute).
5. The contents filled in the declaration form are basically the main building materials, such as partition materials/floor materials/top materials.
6. The local fire brigade will inspect the site within 10 working days and put forward written opinions. If it agrees, it can start working; If it doesn't agree, it may need to modify the decoration plan.
7. If the inspection is qualified, at least 2 people from the construction unit will participate in the fire protection training (compulsory), and the training fee will be around/person in 800 yuan (the cost calculation varies slightly from place to place).
8. After the project is completed, the fire brigade will go to the site for inspection, and some rectification opinions will be listed. Just do it. Then, send the fire acceptance audit consent to the construction unit.
Second, the office building decoration fire data approval requirements
1, review opinions on fire protection design of building engineering;
2, the construction project construction site fire audit declaration form;
3. Fire safety agreement signed by Party A and Party B;
4, fire safety measures and fire power system;
5, construction organization design scheme (in the form of construction site plan and text, indicate the fire lane and fire equipment).
Third, the office building must go through the property formalities with the property department before renovation. Customers and decoration companies should go through the formalities in the property management company, and prepare the following materials before filing:
1, property ownership certificate, and the non-owner shall issue the owner's power of attorney;
2, hired decoration construction team qualification certificate, project leader's ID card, business license and other copies; Simple decoration, the owner must issue a decoration guarantee, do not need qualification certificates and other materials;
3, building plan, construction plan, elevation, water and electricity construction drawings and other information.
4. After the information provided is submitted to the management office for review, the owner or the owner's authorized person shall fill in the decoration project declaration form.
5. The decoration engineering application form and building materials shall be submitted to the engineering and technical personnel of the management office for examination and approval, and then the decoration shall be approved by the director of the management office.
6, after approval, decoration construction director and management office signed a decoration responsibility.
7. Decoration management service fee and deposit: the management service fee shall be paid by the construction unit to the management office according to the 2 yuan per square meter; The deposit shall be paid by the construction unit to the management office according to the standard of per square meter 10 yuan (the deposit can be refunded in full after three months of decoration acceptance, and there are no problems left over from the project);
8. The management office shall issue a decoration start-up sheet and a decoration responsibility card, and the construction unit shall handle the temporary pass for the construction personnel before carrying out the construction.
- Related articles
- Why are the lights in Andong Taicheng expensive?
- Is it the responsibility of the property service personnel to inspect the new house?
- Who will manage the construction of color steel houses in residential areas?
- How much is the house price in the capital of Zhongshan Fahua?
- Where is Zibo Chun Shenjun in the world?
- Luo Zhaohui dongguan property