What are the precautions for home decoration and hydropower transformation?

In home decoration, hydropower transformation is a big project, and it is also an error-prone project. If you don't pay attention when decorating, it will easily bring you a lot of trouble in your later life. The following small series will introduce you to the precautions of hydropower transformation and provide you with a decoration assistant. Let's have a look.

Matters needing attention in hydropower transformation I. Waterway part

(1) Waterway design should first consider all water-related equipment, such as water purifier, water heater, kitchen treasure, toilet, wash basin, etc., their positions, installation methods and whether hot water is needed;

(two) use gas or electric water heaters in advance to avoid temporary replacement of water heaters, resulting in repeated transformation of waterways;

(3) It is best to have the owner present for the inhibition test, which can play a supervisory role; Because some decoration teams will cheat the owners in this link. The method is: when pressing, open the "return valve" of the pressing pump to form a loop. Although the press pump seems to be working, the pressure in the pipeline is not great, especially the electric press pump, which students should pay more attention to. If you don't understand, ask a professional to take a look at it for you.

(4) If the redundant floor drain is to be closed, the gap between the drain pipe and the floor drain must be blocked to prevent water from overflowing;

(5) In addition to the washbasin, toilet, washing machine and other outlets, it is best to take one out of the bathroom to facilitate mopping the floor after receiving water; It depends on the owner's preference.

(6) There should be a suppression test after the waterway renovation, but now many decoration teams have not suppressed the test. They will lie to you in many ways, saying that there is no need to suppress, saying that the water pipe is under pressure and so on.

(7) After the location of the washing machine is determined, the drainage pipe of the washing machine can be considered in the wall, which is beautiful and convenient;

(8) After the kitchen and bathroom floor tiles are laid, check whether the floor drain is unobstructed (the drainage speed after removing the floor drain cover shall prevail, because most deep-water sealed floor drains have the problem of slow drainage);

(9) Another point is particularly important. It is best not to use deep water to seal the floor drain of washing machine. The washing machine drains water quickly and has a large displacement. The launching speed of deep-water sealed floor drain can not be reached at all, which will directly lead to water overflow.

(10) When sealing the floor drain in deep water, it should be cleaned frequently according to the use situation, otherwise the rubber pad under the floor drain will not be sealed after hanging dirty things;

(eleven) when closing the house, we should pay attention to check whether the drains in the kitchen and bathroom are unobstructed. If the drainage is slow, we should promptly clear the property; Protect the drain when decorating, especially when laying kitchen and bathroom tiles, which is most likely to cause cement to fall into the drain and cause blockage;

(12) In the process of waterway reconstruction, four points should be paid attention to in the cold and hot water supply pipes reserved for later installation of electric water heaters and faucets:

1, and the heights of hot and cold water nozzles are consistent;

2, cold and hot water nozzle should be two centimeters higher than the wall, in the wall brick, also should ask bricklayer to ensure that the wall brick and water pipe nozzle are in the same level. If the size is not suitable, install electric water heaters, faucets, etc. Additional couplings, internal wires and other connectors may need to be purchased in the future to complete the installation;

3. The cold and hot water nozzles are vertical to the wall surface, and care should be taken not to let the bricklayer get crooked when sticking the wall tiles in the future (if they are not vertical, it will be difficult to install them in the future);

4. Ensure the spacing of 15cm (at present, the spacing between hot and cold water of most electric water heaters and faucets is 15cm, and some are10cm);

(13) Don't forget to waterproof the bathroom floor, especially where there are grooves. If the shower area is not a closed shower room, the wall waterproof should be 180 cm high to prevent "wall sweating" in the future. Be sure to do a 24-hour closed water test before plastering cement, and bricklaying can only be done if there is no problem;

Matters needing attention in hydropower transformation II. Circuit part

The design of (14) circuit must be determined after considering the possibility, feasibility and availability in detail. No one wants to pull wires everywhere on the walls and floors of their new home. Circuit design should also pay attention to its flexibility, and sometimes it cannot be too "comprehensive". Summed up a simple principle: in the future, when the electrical plugs are concentrated, it is often better to connect a patch panel, and the effect is often better than setting a full wall socket;

(15) The location of the socket is very important. It often happens that the socket is just behind the bedside table, which makes the cabinet unable to lean against the wall. It is generally not wrong to make the socket as well as possible, but if the socket is left in an inappropriate position, it may conflict with the furniture placement or electrical installation in the later period. Students should remember;

(16) Double control (bedside and porch) can be considered for the bedroom ceiling lamp;

(17) Some kitchen sockets are convenient with switches, thus avoiding the inconvenience of unplugging the rice cooker from time to time in the future.

(eighteen) according to the needs of life, the ceiling lamp in the living room can be equipped with a separate control switch (in the lobby and at the door facing away from the master bedroom);

(nineteen) how to charge the cassette must be agreed in advance, which is the most hidden and dark profit point of water circuit transformation. A cassette needs only one or two dollars in the market, while the decoration team often needs more than ten dollars. Generally, fifty or sixty cassettes are needed for home decoration. Therefore, it is normal for students to throw hundreds of dollars for nothing. Strive to pull it into today's world for only one purpose. Remember five words: chop hard! ;

(20) Observe whether there are modules in the telephone socket and network cable socket;

(twenty-one) there is a mirror and coat hook space, to consider the lighting near the mirror;

(twenty-two) when the circuit is reformed, the surrounding audio lines should be buried.

(twenty-three) telephone lines should be preset in the living room, master bedroom and bathroom according to personal habits and convenience;

(twenty-four) pay attention to the strong and weak wires can not be in the same pipe, there will be interference;

(twenty-five) if the living room, kitchen and bathroom are tiled, some positions can be properly considered without slotting wiring;

(26) There is no need to set too many sockets behind the TV. In the future, it is best to connect a patch panel on the side of the TV.

(twenty-seven) the socket is generally 30CM from the ground and should not be less than 20CM. Turnouts are generally off the ground140 cm;

(28) There shall be no more than eight wires in a tube, and remember that the gap between each tube shall not be less than 40%.

(twenty-nine) exhaust fan switch, telephone socket should be installed near the bathroom, rather than into the bathroom door wall;

(30) Yuba should be installed near the shower room or bathtub, not in the center of the bathroom;

(thirty-one) according to the use of household appliances to consider the line capacity;

(thirty-two) balcony, corridor, cloakroom can consider the reserved socket;

(thirty-three) should be clear about the communication intention and design ideas with workers. And draw the actual circuit transformation route on the wall;

(34) The electrical specification requires that PVC pipes and variable heads must be used for buried pipelines.

Matters needing attention in hydropower transformation 3. Waterway synthesis part

(35) Hydropower transformation is the biggest concealed project, and it is also the most expensive project in addition. It depends on whether the workers follow the conventional way.

The above is the relevant content of matters needing attention in hydropower transformation, hoping to help everyone! Tubatu decorative net, the leader of the whole industry. Click on the following links on this page, and you can get the major brands' supply, free quality design and free house inspection provided by the professional design team, saving 40% of the decoration cost!

& lt& lt& lt click here to apply for free decoration warranty and free professional supervision service >>& gt& lt& lt& lt click here to get free room measurement and decoration quotation from professional designers. & gt& lt& lt& lt click here for 0 yuan to grab free design places, professional designers and whole house design >>& gt.