Reply on the Project Cost of Power Supply Facilities in Newly-built Residential Quarters in Yangquan City (for Trial Implementation) No.40 1 [201].

According to the provisions of the "Regulations on Property Management in Shandong Province" and the cost budget, combined with the actual situation in our city, the supply fee standard of new residential facilities in our city is formulated. The relevant matters are hereby approved as follows:

New residential area? The project scope of new residential power supply facilities includes the supporting project scope of power supply facilities, which are supplied by all user meter boxes, supporting facilities and installation projects of public power supply facilities (such as substations and switch station cable joints), including high-voltage boundary switches or high-voltage cable branch box, high-voltage incoming lines, transformers and distribution stations (excluding land acquisition, demolition and housing costs), low-voltage lines, low-voltage branch boxes, household meter boxes and meters. Technical support of household metering device terminal in residential quarters.

On the basis of unified design, unified construction and unified maintenance and management, the planning of power supply supporting projects in the power sector should cooperate with enterprises to develop and build power supply, and undertake civil works such as ditches, equipment and buildings related to supporting construction.

The cost of new residential power supply facilities includes the design, equipment procurement, installation, commissioning and maintenance of power supply and distribution facilities (including meter boxes and metering equipment) within the scope of supporting power supply projects in residential areas, excluding supporting residential areas, and the development and construction units undertake civil works such as ditches, equipment and buildings.

Power supply capacity configuration standard

Basic configuration. The building area of each household is less than 100 square meter and not less than 6kW 100- 150 square meter, and the 8kW configuration is not less than 10kW configuration. The power supply capacity of other facilities is 1.5 million square meters.

2. The construction area of residential buildings, office buildings and public buildings is 50 watts per square meter.

3. According to the design requirements.

Charge standard of water supply facilities

Unified construction, unified charging and unified management of new residential power supply facilities. The maintenance cost and reasonable profit of water supply facilities should be considered after the deadline. Power supply facilities are charged according to the square meters of construction area, ordinary commercial housing, business premises and office premises. Standard for public buildings: Multi-storey buildings are high-rise buildings, 90 per square meter, 1 10 yuan. "

Affordable housing, low-rent housing, public rental housing and government-approved shantytown renovation, urban village demolition and resettlement housing and other affordable housing, under the same configuration conditions, more than 20% discount.

4, the implementation of water supply facilities fee payment

The cost of water supply facilities shall be paid in installments, and the electricity consumption for the temporary construction of the development and construction transmission unit shall be 65,438+00% of the power supply facilities, and 60% of the total remaining funds shall be paid in one lump sum within 5 days after the formal commencement notice is issued by the enterprise.

Management and use of power supply facilities.

The fees for power supply facilities of newly-built houses include the fees charged by people who go out to buy houses according to the construction cost, which shall be earmarked for project investment and construction, power supply facilities, centralized management and special funds, and should be further developed and constructed for the unit power supply and distribution cost projects, and regularly report the use of funds to the municipal finance, auditing, price and other departments, and accept supervision and inspection.

Scope and time of intransitive verbs

The new residential area is located in Kuiwen District, Weicheng District, Fangzi District, Hanting District, High-tech Zone, Binhai District and xiashan district. Implementation scope at county level.

According to this standard, I will further follow up the cost supervision and examination during the two-year probation period from 201June 12. Re-submit for approval three months before expiration.