Five Articles on Librarian's Personal Work Evaluation

Self-confidence, pragmatism, diligence and optimism are my consistent attitude towards life and my persistent attitude towards life. I firmly believe that through my unremitting efforts, there will be a bright future and I will find my own sunshine. The following are my five comments on the work of librarians. I hope you like it!

Document work evaluation 1

Time flies. It's my second year as a documenter in the project department.

On the project, my main job is to collect, sort out and manage the project data and communicate with the company, the supervision unit, the old city reconstruction office and the subcontractors in time, seriously deal with the change negotiation in the construction process, the supervision notice reply and other related information inspection, send and receive the contact list of the supervision and its subcontractors, and manage the project atlas and standard issuance. Cooperate with project department, supervisor and subcontractor as much as possible to provide them with the information they need to do a good job. Now I will make the following report on the personal year-end evaluation, and look forward to your valuable opinions and suggestions.

1, work

(1) Organize the complete on-site information in time, collect and save the documents and meeting documents issued by the company and relevant departments, and put the documents that have not been specifically organized into folders according to the categories, so as to facilitate everyone to consult the documents; Do a good job in the distribution, circulation and transmission of all kinds of documents and drawings, do a good job in filing original documents, and do a good job in reviewing and filing data in time; Documents are distributed, circulated and transmitted by relevant departments, and the receiving department signs the original documents for confirmation, files the original documents, and makes a registration form for borrowing materials to urge borrowers to return the materials.

(2) Under the guidance of _ manager, verify the complete site of the engineering data, supplement, cut and fold the files with folds, damages and unevenness, so as to make them adhere to the unity of appearance as much as possible, classify the files according to the characteristics of the data, bind the data belonging to the same volume in a file box and put them in the cabinet for safekeeping, and regularly check the files, trace the missing files and find out the reasons.

(3) Responsible for timely handling the relationship and coordination between the project department and the old city reconstruction office, and submitting materials for approval.

(4) Responsible for meeting minutes of the project department, writing meeting minutes, inputting documents, filing drawings and contracts, and answering the phone in the office.

2. Ideological aspect

Because the work of the librarian itself is more complicated, I have been dealing with things encountered in my work with an enterprising attitude since I joined the company. Although I occasionally have emotional problems, I can quickly handle my own problems, devote myself to my work and treat every job correctly and seriously. Seriously study the company's rules and regulations, seriously abide by labor discipline, ensure attendance on time, and ensure that the work can be completed on time.

3. Existing shortcomings and future work direction.

Although I used to work as an information officer in a real estate company, I didn't know everything systematically because I didn't graduate from civil engineering. Some things are still being explored step by step, so there are some detailed problems, such as writing meeting minutes and filing documents, which need further study and improvement. What is abnormal is the recognition of drawings, so we should continue to learn.

In the future, I will make up for the shortcomings in my work, improve my working methods, improve my work efficiency, learn more and ask more questions, and really improve my work skills. And in the process of work, strengthen theoretical study, strive to make ideological awareness and work efficiency enter a new level in an all-round way, and contribute to the future of _ _.

Librarian's job evaluation II

Time flies, and it's the end of the year. Since I joined the project department as a documenter in June, 20, I have been trying my best to do my job well. My main work and evaluation this year are as follows:

I. Main tasks completed this year

1, responsible for collecting the original data of pile foundation, tie beam, pile cap and column.

Documentary materials received every day will be handed over to various departments on the same day, and other materials will be processed within one or two days without special scenes, and there is no backlog or unknown scenes. Both the internal departments of the commons and the information exchanged with the supervision units have established detailed registration accounts.

2. After the supervision and repeated inspection by the resident office, the director office and the head office, the information is basically complete and there are no major defects.

Second, the work experience and shortcomings

As a librarian, there are a lot of materials in each part, which requires a meticulous and patient working attitude. In this more than half a year, after repeated inspection and acceptance by departments at all levels, although there are not many defects in the data, it also exposes some areas that need to be improved, points out the direction of improvement for me, and correspondingly urges and improves my overall level. At the same time, it is necessary to study rules and regulations and related documents, master professional knowledge, improve work ability and do personal work in time.

Three. Work objectives and plans of 20__

It is necessary to further understand the complexity of the work, which requires high data and is difficult. In the future work, we should further strengthen the spirit of struggle, give full play to our own specialties, minimize the lack of data, and lay the foundation for the successful completion of Chutian Cup data evaluation.

1, foundation and foundation division acceptance.

2, the main structure acceptance.

3, civil air defense project completion acceptance.

4, fire engineering acceptance.

5. Handover of completion data.

Job evaluation of librarians

With the passage of time, I have been in _ _ _ _ _ _ _ _ _ for more than _ months.

During my tenure in the company, I worked as an information officer in the contract department. My main work is roughly divided into document arrangement, document examination and approval procedures, cooperation with various departments of the company and settlement of some materials. The specific scenario is as follows:

I. Documentation arrangements

1. Contract: This is one of the most important tasks of the Contract Department. When I first arrived at the company, I had relevant contract ledgers and contract files, but they were not systematic and clear enough to be clear at a glance. So, with the help and guidance of the department manager and colleagues, I numbered all the contracts in the contract department systematically and comprehensively, and filed them by year.

Electronic account books have also increased accordingly. In addition to all the basic information of the contract itself, a part of ledger is added to describe the whole contract and project in more detail. The contract answering questions filed by the Contract Department are divided into _ _ _ _ _ _ _ _ _ _. Party _ _ _ has _ _ contracts from _ _ to the end of _ _ _; _ _ _ There are _ _ contracts for this project; _ _ _ existing _ _ contracts; The contract part of the general contracting department * * * files _ _ copies of the contract. Although the whole Chinese material is not very heavy, it takes a lot of time. Because of this, I have a preliminary understanding and understanding of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. On-site visa form: On-site visa is a process that is approved by the person in charge of the construction site on the spot when problems are encountered in the construction process, because it takes time for approval. Refers to the certificate signed by the contractor's on-site representative (or his client) and the contractor on the duty events involved in the construction process. It belongs to sporadic labor consumption, sporadic mechanical consumption, rework caused by design change or engineering negotiation, and the confirmation of sporadic new quantities outside the contract proposed by the contractor according to the contract.

Party B shall report it to Party A's project department, and the documenter of the project department shall give it to the documenter of the contract department. After receiving the on-site visa form, it must be reported to the contract manager, who will uniformly assign it to the corresponding pre-settlement personnel for corresponding audit, and then feed it back to the contract department librarians, and then the contract department librarians will feed it back to the project department and supervision, and the contract department will keep a copy. At first, the on-site visa did not have a complete ledger and a clear classification of documents. In order to facilitate the smooth progress of future work, with the help of managers and colleagues, on-site visas are classified into documents and entered into electronic account books. At first, for the convenience of engineering statistics, on-site visas were classified according to construction sites. Later, because most construction units have to settle accounts, the original documents and ledgers classified by construction sites were changed to construction units, and the amount reported by construction units was preliminarily counted. Up to now, the contract department has _ _ _ units and individuals with on-site visas for _ _ _ projects; _ _ _ Project site visa _ _, * * * _.

3. Final settlement data: Generally speaking, settlement data can be divided into two categories. First, the construction settlement data-made by the construction unit according to the prescribed format and data and submitted to the engineering department, which handed it over to the contract department; II. Material supply settlement data-The supplier of Party B shall directly make it according to the specified format and data and submit it to the Contract Department. Finally, the Contract Department shall arrange and bind it, and the department manager shall issue it to the corresponding presetting staff. After the audit is completed, the final settlement form will be distributed to relevant departments and entered into the electronic ledger.

Settlement data I * * * is divided into three parts: general contractor, sporadic project and material supplier, in which the list of settlement completion data of general contractor and subcontractor includes: power of attorney of budget and final account personnel; Summary of project settlement; Settlement book reported by the construction unit; Draft calculation of engineering quantity; On-site visa form (original); Design change order (original); Meeting memorandum (interview record); Price confirmation sheet; A material clearing data; Project completion acceptance form; Time limit for a project confirmation sheet; Formal completion drawing; Contract text; Other settlement related materials; Deduction slip and other information. The list of completion data of sporadic project settlement includes: settlement book; Orders for sporadic projects; List of completion and acceptance of sporadic projects; Summary of sporadic project settlement; Performance evaluation form after sporadic procurement; Other settlement related information.

The data list of material supplier settlement completion includes: settlement book; Settlement application; Contract text; Receipt summary table; Four-way acceptance sheet; Meeting memorandum (interview record); Price confirmation sheet; Post-performance evaluation form, with performance improvement feedback and other related information if there are performance improvement requirements. The main work of the contractor in the final settlement is to review the completeness of the settlement data reported by Party B's engineering department according to the above corresponding list data, and check whether there is the signature or official seal of the relevant person in charge. After the information is complete, the pre-liquidator completes the examination and approval, and enters the examination and approval process.

4. Documents issued by the General Engineer's Office: The documents issued by the General Engineer's Office mainly include the technical verification sheet and the design change sheet. The technical verification sheet is one of the documents to complete the construction contract obligations and take reasonable construction measures, put forward specific plans, methods, technologies and measures, and be recognized by the employer and relevant units. Design change means that the design unit adjusts according to the requirements of the construction unit, or modifies, perfects and optimizes the original design data. Design changes shall be issued in the form of drawings or design change notices. The above two documents shall be sorted and distributed by the Chief Engineer's Office, and shall be summarized, numbered and filed after being signed by the Contract Department. Both the technical verification sheet and the technical change sheet will be attached with drawings, and this attachment will also be attached to the corresponding contract.

5. Other documents: Other documents mainly include the quotation submitted by Party B, project contact list, application form for purchasing materials and equipment provided by Party A, receiving and dispatching list and deduction list. The above documents are all received documents. After signing, they are filed by classification number and entered into the corresponding electronic ledger.

Second, the document approval procedures

The process approval of a document mainly means that the establishment or approval of this document needs the knowledge and approval of relevant leaders. At present, the documents I handle that need the approval of leaders mainly include: tender evaluation and contract approval form, payment approval form and project settlement form. The process of finding leaders to sign is also gradually familiar to all departments. This part of the work made me understand the company's management system and the specific division of labor among various departments more quickly, and also provided conditions for my smooth work in the future.

Third, cooperate with the work of various departments of the company.

Cooperate with all departments of the company. This is a large part of my work data. Because the company is a whole, not a single department or leader, it needs the cooperation and cooperation of all departments of the company. This is also where I need to strengthen my study. In the course of my work, I must always cooperate and communicate with the general office, engineering department, finance department and property department. The General Engineer's Office and the Engineering Department communicate and cooperate with each other in terms of data handover, general situation of the project and progress of the project mainly by issuing documents and work contact sheets.

The cooperation with finance is mainly to confirm and unify the contract payment, because the subcontracting department and the finance department will have reconciliation work three or four times a month, mainly to ensure the accuracy of the project payment. The main purpose of financial reconciliation is to receive the copy of the payment slip fed back to me by the cashier first. I will enter the electronic bill according to the actual financial payment scenario below the copy of the payment slip, and then reconcile the electronic bill with the accountant after confirmation, mainly focusing on the final single payment and the corresponding total contract payment and unpaid scenario. The cooperation with the property is mainly in borrowing, searching and sorting out the corresponding contracts, and the general information is about the project quality and warranty responsibility.

Fourth, partial supply settlement

I am mainly responsible for the supply and settlement of exterior wall tiles, kitchen supplies, hotel supplies and exterior wall insulation supplies and the settlement of fixed lump sum contract. I learned a lot of practical methods and skills in the settlement process, which will be of great help to my future work. At first, I didn't know where to start. Later, with the help of everyone, I gradually understood the general process. First of all, I must check the integrity of the information, mainly the confirmation of the receipt and acceptance certificate. I must have the signatures of relevant departments and personnel, I must confirm and check each document and signature, and then I make statistics on the supply list and reach an agreement with suppliers.

The audited results and data are submitted to the department manager together, and then the department manager sends cross-auditors for cross-auditing to ensure the accuracy of the audit results. After the cross-examination, the contract department will issue a confirmation form for project settlement, mainly to confirm the contract price and the amount of examination, and both parties will sign and seal it after confirmation. However, in these months of work, I also found many shortcomings and problems:

1, sometimes I can't remember the archived documents and distributed documents, and I can't give feedback to leaders and colleagues in time.

2. The dynamic data numbers reported by the construction unit and supervision unit are messy, and there will be duplication and vacancy, which will bring some inconvenience to the collation of verification data.

3. The settlement work is not very skilled. Although there are no big mistakes in quantity and payment, the process is not clear enough. In view of the above problems, we will take the following measures to overcome them in the future work:

First, do a good job of circulating and transmitting all kinds of documents and archive the original documents. According to the regulations of the project department, the documents are circulated, transmitted and distributed by relevant departments, signed and confirmed by the receiving department, and the original documents are sorted, classified and filed.

Second, verify the complete site of the engineering data, and make up, cut and fold the wrinkled, damaged and uneven documents to make them as neat as possible. According to the data regulations, the documents are classified according to the data characteristics, and the data belonging to the same volume are bound in a file box and stored in a cabinet. And regularly check the documents, trace the lost documents and find out the reasons. Engineering data should be carefully filled in, neatly written, neatly bound and clear at a glance for future inspection and filing.

Third, seriously learn from colleagues in the project department with an open mind, ask for advice in time if you don't understand, learn from old employees, and constantly improve your industry level. For the task of receiving cloth, we must complete it to the letter and not slack off at all.

In this reconciliation, many problems and low-level errors that need to be rectified are exposed in the data. This shows me the direction of improvement. At the same time, it is necessary to study rules and regulations and related documents more seriously, master professional knowledge, improve work ability, strengthen work responsibility, and do personal work in time. Find out the shortcomings in the work so as to overcome them in the future work.

Evaluation of this year's work, although I have mistakes, but really let me grow a lot. At first, I was at a loss when I changed from a fresh graduate to a company employee, but the help and encouragement of my colleagues and leaders in my work project really played a great role in me, and I also learned a lot of practical knowledge that I couldn't learn in school. In my future work, I need to study rules and regulations and related documents more seriously, master professional knowledge, improve my working ability, strengthen my sense of responsibility, do a good job evaluation and reflection in time, constantly motivate myself, enrich my energy, and improve my quality and professional level to adapt to the development of the times and enterprises.

Job evaluation of librarians

Time flies, it has reached the end of 20__ _, and it is also my second year as a documenter in the project department.

On the project, my main job is to collect and manage the project data, communicate with the company, supervision unit, urban renewal office and subcontractors in time, carefully handle the change negotiation and supervision notice reply during construction, check the relevant information, send and receive the contact list of supervision and its subcontractors, and manage the atlas and standard distribution of the project. Cooperate with project department, supervisor and subcontractor as much as possible to provide them with the information they need to do a good job. Now I will make the following report on the personal year-end evaluation, and look forward to your valuable opinions and suggestions.

I. Work aspects

(1) Organize the complete on-site information in time, collect and save the documents and meeting documents issued by the company and relevant departments, and put the documents that have not been specifically organized into folders according to the categories, so as to facilitate everyone to consult the documents; Do a good job in the distribution, circulation and transmission of all kinds of documents and drawings, do a good job in filing original documents, and do a good job in reviewing and filing data in time; Documents are distributed, circulated and transmitted by relevant departments, and the receiving department signs the original documents for confirmation, files the original documents, and makes a registration form for borrowing materials to urge borrowers to return the materials.

(2) Under the guidance of management personnel, verify the complete site of engineering data, supplement, cut and fold the files with folds, damages and irregularities, so as to make them adhere to the unity of appearance as much as possible, classify the files according to the characteristics of the data, bind the data belonging to the same volume in a file box and put them in a cabinet for safekeeping, and regularly check the files, trace the missing files and find out the reasons. Engineering data should be filled in carefully and neatly.

(3) Responsible for timely handling the relationship and coordination between the project department and the old city reconstruction office, and submitting materials for approval.

(4) Responsible for meeting minutes of the project department, writing meeting minutes, inputting documents, filing drawings and contracts, and answering the phone in the office.

Second, the ideological aspect.

Because the work of the librarian itself is more complicated, I have been dealing with things encountered in my work with an enterprising attitude since I joined the company. Although I occasionally have emotional problems, I can quickly handle my own problems, devote myself to my work and treat every job correctly and seriously. Seriously study the company's rules and regulations, seriously abide by labor discipline, ensure attendance on time, and ensure that the work can be completed on time.

Third, the existing shortcomings and future work direction

Although I used to work as an information officer in a real estate company, I didn't know everything systematically because I didn't graduate from civil engineering. Some things are still being groped step by step, so there are some detailed problems, such as the writing of meeting minutes and the filing of documents, which need further study and improvement. What is abnormal is the recognition of drawings, so we should continue to learn.

In the future, I will make up for the shortcomings in my work, improve my working methods, improve my work efficiency, learn more and ask more questions, and really improve my work skills. And in the process of work, strengthen theoretical study, strive to make ideological awareness and work efficiency to a new level in an all-round way, and contribute to the company's tomorrow.

Job evaluation of librarians

First, the poor implementation of individual links in the process leads to the disconnection between the upper and lower links.

For example, the concrete form removal report can not be retrieved from the laboratory in time, which affects the application for form removal, and then delays the acceptance of the inspection lot for the appearance size of cast-in-place structure.

Second, the compilation and filling of engineering data is not rigorous enough.

If the number of individual representatives in the test report is missing; The data of individual inspection items in the inspection lot is too hypocritical, which is false at first glance; The drawings of individual data are not detailed and clear enough.

In view of the above problems, this project adopts the following four measures:

1. Define the division of responsibilities and supervise the implementation of the process.

2, timely collection, timely feedback.

3, regular data rectification, data verification again.

4. Follow up the catalogue in time and file perfect data.

After taking the above measures, problems were found in time, and the rectification was carried out at the first time. It was bumpy all the way and the inspection was successful again and again.

The data specification and the Great Wall Cup guide all have detailed requirements for the filling requirements of various materials, which are not repeated here. Now only through the exploration and induction of this project; Several aspects that should be paid attention to in all kinds of data are summarized as follows:

First, strictly control the construction technical data.

The construction technical data is a document to guide the correct, standardized and scientific construction, and it is also the official document of the engineering change scheme. The change, negotiation and the blue prints.the design should be signed by the design and construction unit, the construction team and scheme should be approved by the company level, and the disclosure should be signed by the construction team. In the event of engineering disputes or other special circumstances, these circumstances are the most basic and important materials to solve disputes. Therefore, this kind of information should be strictly managed, and generally it should not be borrowed to avoid loss. If it is necessary to borrow, a strict borrowing registration system should be implemented.

In addition, this project is designed and constructed at the same time, with frequent project changes and many design changes and project negotiations. Design change and project negotiation directly affect the construction progress and project settlement. If the change and negotiation are delayed, resulting in economic losses, then the efforts of the whole project department will be meaningless. Therefore, it is necessary to distribute the changes and negotiations to the relevant personnel of the project department in time, and the technicians will convey them to the construction team at the forefront of construction in the form of disclosure at the first time.

Second, the construction survey records should be detailed.

Construction survey records are the data to ensure the positioning, size, elevation and position of the project. "One short step makes a lasting regret", and it is not uncommon for the negligence of setting out to bring trouble to the subsequent construction. Therefore, the survey data must have detailed charts to ensure the accuracy of survey construction. If there is a floor plane setting-out record, the hole setting-out should draw a profile sketch, indicating the elevation dimension of setting-out, and there should be a plane sketch. If it is required to indicate the axis dimension in plane setting-out, the section dimension of the wall column, the position dimension of doors and windows, the axis control line and the edge dimension of the wall column shall be explained. If the external walls, doors, humanly scaled openings are set out, a section sketch shall be drawn, indicating the elevation dimensions of the setting out.

Three, the construction data should be complete and effective, with traceability.

There are many kinds of materials in the project, from different manufacturers. Ensuring the quality of materials will lay a solid foundation for the quality of the whole project. All kinds of materials should provide quality certificates such as product certificate and inspection report when they enter the site. Because these materials are from other units, the traceability of such materials is particularly important. In view of this, the original documents of data quality certification should be used as much as possible. If a copy must be used, it should be clear, complete and effective, and stamped with the official seal of the original storage unit, indicating the storage place of the original, the signature and time of the agent, and indicating the time of entry and the place of use.

Fourth, the construction records should be detailed and specific.

Construction records are all kinds of inspections and records to ensure the quality and safety of the project. The information in the record should be detailed, not general, and consistent with the technical disclosure. Such as variety, specification, quantity, location, anchorage and joint location, lap length, protective layer thickness, steel bar and pad binding, steel bar rust removal, etc. should be clearly written. When data appears, it is necessary to calculate specific values and avoid using standard languages. When there is any change or negotiation, the change information should also be written clearly and marked with its number.

Five, the construction test records should be timely and complete.

Qualified construction inspection is a prerequisite for the acceptance of the inspection lot (division) project. For example, the steel bar connection test report is the premise of acceptance of the steel bar installation inspection lot, and the concrete test report is the premise of acceptance of the concrete construction inspection lot. Therefore, the construction test records should be carried out step by step, so as to avoid omission and affect the subsequent construction.

Six, the inspection batch acceptance record inspection items to fill in complete.

Inspection lot is the smallest unit of project acceptance, and it is the basis of quality acceptance of sub-projects and even the whole construction project. Therefore, whether each evaluation in the inspection lot is qualified or not directly affects the quality acceptance of sub-projects and even the whole construction project. All items to be inspected in the inspection lot should not be omitted. If the rebar installation inspection lot with embedded parts has embedded parts, the concrete construction inspection lot with construction joints has construction joints.

Five articles about librarian's personal job evaluation;

★ Model essay on librarian's work self-evaluation

★ Librarian's Work Summary and Self-evaluation

★ Work summary and self-evaluation of civil engineering documents

★ Documentary self-assessment 5 articles 1000 words or so.

★ Summary and self-evaluation of folk documentary work (2)

★ Summary report of civil engineering practice work