What materials need to be prepared for decoration filing?

1. Decoration application form, real estate license, certificate of owner's consent to decoration and copies of applicant and property owner.

2. If you rent a house, you need to submit a lease contract.

3, involving structural transformation and major changes in the housing structure, it is necessary to submit the housing design drawings or the conclusions of the professional department on the safety demonstration of the housing structure.

What should I report for the decoration?

If it's just ordinary decoration, there is no need to apply for repair. When the house decoration involves the demolition and transformation of the main body or obviously needs to increase the load, this situation must be reported to the house property right unit or the relevant property right unit, and the construction permit formalities can be handled only after the approval of the relevant departments, and the decoration work can be started only under the supervision of the examination and approval department.

If you don't go through the formalities, you will start construction without authorization. In case the main structure is demolished or the load of the house is increased during decoration, the owner himself will be responsible for the consequences.

If the decoration does not need to change the main body or increase the load, it can be registered directly with the property right unit or the property management department, and the formalities should be completed. Normal pipeline facilities such as gas, gas and flue shall not be changed at will during decoration. If changes are needed, they should be reported to the property management department or relevant management departments in advance, and construction can only be started after approval. If they fail to pass the declaration, the owner himself will be responsible for any consequences caused by unauthorized handling.

Decorative process sequence

1. Confirm the scheme

Everyone can confirm the decoration style and home improvement design scheme from the perspectives of demand, apartment type and preference, and make overall planning to avoid affecting the home improvement style and feeling due to unexpected situations or improvisation in the actual decoration process.

2. Construction planning

After determining the decoration style scheme, it is necessary to clarify the details such as doors and windows, walls, water and electricity, decoration materials to be purchased, and acceptance standards.

3. Wall reconstruction

According to the home improvement plan, the irregular and dissatisfied walls that affect the overall style are transformed, including tearing down walls, building walls, shoveling wall skins, and tearing down doors and windows. , to create a construction framework.

4. Hydropower construction

Including waterway installation and circuit transformation, but it should be noted that although hydropower transformation is a concealed project, it directly affects the subsequent installation and use, so we must make good plans and meet the acceptance standards.

5. Mud stage

Including carpentry, bricklayer and oiler, from the ceiling and keel construction of the house to the plastering line treatment, from the floor tile entry to the wall base treatment, putty scraping and painting. , lay a solid foundation one by one and do a good job of follow-up connection.

6. Installation of facilities

Water heater, kitchen and bathroom ceiling, range hood, ground cabinet, switch socket, lamps, sanitary ware, etc. Installation began one after another, and then furniture, household appliances and decorations came into play, gradually enriching the furniture space and finally completing the overall home improvement design.

7. Whole house acceptance.

After completion, you can conduct a comprehensive acceptance with designers and supervision units.