Main contents of maintenance
1 video monitoring system
1, monitoring system host
1) Clear the monitoring host filter.
2) Add CPU cooling ointment.
3) Detecting the operating system
4) Check the withstand voltage of the power supply.
2. Camera and circuit:
1) power supply and line detection
2) Camera lens detection
3) video definition adjustment
3. Display and system operation.
1) Monitor dust cleaning
2) Dust removal of hard disk video recorder
3) Dust removal of video matrix system
4) UPS detection in computer room
5) Line identification and layout in the machine room
2 electronic patrol system
1, patrol system host
1) Clean the filter screen of the patrol host.
2) Add CPU cooling ointment.
3) Detecting the operating system
4) Check the withstand voltage of the power supply.
2. Patrol equipment
1) Is the patrol button working properly?
2) Is the patrol system working normally?
3) Is the data reader working properly?
3 burglar alarm system
1, alarm system host
1) Clear the alarm host filter.
2) Add CPU cooling ointment.
3) Detecting the graphic display function of the operating system and software.
4) Check the withstand voltage of the power supply.
2. Alarm point
1) Is the alarm point working normally?
2) Whether the alarm line is short-circuited.
4 broadcast system
1, broadcast system host
1) Is the broadcast power sequencer working properly?
2) Whether there is a short circuit between the fire power amplifier and the broadcast power amplifier.
3) Detection of each channel of broadcast preamplifier
4) Detection of broadcast programs and CD players
5) Does the broadcast monitor work normally?
6) Fire alarm signal generator detection
7) detect the strong cutting power supply.
8) Whether the intelligent interface of fire signal works normally, and whether it is linked to broadcast after there is a fire evacuation signal.
2. Broadcast speakers
1) Whether the broadcast speakers on each floor are working normally.
2) Whether each sector works normally.
3) Detection of volume controller of electric well
5 building automatic control system
1, building control host
1) Clear the filter of the building control host.
2) Add CPU cooling ointment.
3) Detecting the operating system
4) Check the withstand voltage of the power supply.
5) Check all points of the building control software.
6) detect the line transmission between the host and the extension.
2. Field equipment
1) Detection module status
2) detect that state of the relay
3) Check the wiring status of each point.
4) Check whether the strong current is isolated from the weak current.
5) Check the power supply voltage of terminal 1 2.
6) There is no short circuit or open circuit in the wiring of the control terminal at the DO point of the detection module.
7) Detect the voltage of DO output control lighting power supply, and the line is not short-circuited.
8) Check that there is no short circuit or virtual connection in the terminal board.
9) Detect the supply voltage of DDC DC power supply and LON module transformer.
10) Detection in DDC: B34 is jumper access.
1 1) Detect DDC AI as DI connection: B3 1 power supply voltage.
12) detects the access of the DI point.
13) Check whether the connection of AO point is correct.
14) Check whether the external power supply voltage wiring is short-circuited.
15) Clean the dust on the box and wiring board.
6 visual intercom system
1) Clean the host filter.
2) Add CPU cooling ointment.
3) Detecting the operating system
4) Check the withstand voltage of the power supply.
5) Test the system software function.
6) detect the line transmission between the host and the extension.
7) Check the appearance and function of the host at the door of the unit.
A) Panel function: Check whether the keys on the panel are sensitive, keystroke sound and lighting.
B) unlock function
A. Unlock the lock with a password, and check whether the unlocking mechanism is normal and flexible.
B. whether the door closer is closed normally.
8) Clean and dust the main engine at the door of the unit, and fasten the loose lines.
9) Test whether the working voltage of the control part of the building intercom system is normal.
10) Test the main engine at the door of the unit, and check whether the buttons on the panel are sensitive and the lighting is normal.
1 1) Check the motherboard at the door of the unit to see if the external wiring is fixed correctly.
12) Check the closing of the door closer, check whether its transmission mechanism is normal, and adjust the closing speed and intensity.
13) to form relevant documents and records.
7 family security system
1) Clean the host filter.
2) Add CPU cooling ointment.
3) Detecting the operating system
4) Check the withstand voltage of the power supply.
5) Test the system software function.
6) detect the line transmission between the host and the extension.
7) Check the wiring and communication of system modules in the electric well.
8) Check the working state of the power supply of the electric well system.
8 wireless intercom
1) system power detection and maintenance
2) Dust removal, function inspection and maintenance of the turntable.
3) interphone voltage detection, function detection and maintenance.
4) Routine inspection of system connecting wires
5) Dust removal, equipment connection inspection and maintenance of front-end equipment such as power amplifier, power divider and antenna.
9 electronic announcement system
1) Clean the host filter.
2) Add CPU cooling ointment.
3) Detecting the operating system
4) Check the withstand voltage of the power supply.
5) Test the system software function.
6) Check the line transmission between the host and the extension, and check the connection of lines and equipment.
7) Dust removal of front-end equipment
10 parking lot management system
1) Clean the host filter.
2) Add CPU cooling ointment.
3) Detecting the operating system
4) Check the withstand voltage of the power supply.
5) Inspection of hardware facilities, such as lead fastening and voltage test for connecting sockets.
6) Check the automatic and manual functions of each entrance and exit railing machine;
7) Mechanical lubrication of the transmission part, screw fastening, network and circuit connection test between the hurdle and other systems;
8) When entering the machine, clean the car rental print head or the time-sharing card issuing device and ticket collection sensor;
9) Check the communication between the output and input networks and correct the clock;
10) sensor safety and sensitivity inspection.
1 1) Back up the data of the host and manage the data backup of the software; Database arrangement and system maintenance.
12) detection of system lines and network connections; Test data transmission function and linkage function.
1 1 network system
1) Maintain the normal operation of property office equipment, regularly remove viruses, back up important files, and burn CDs (including printer ink head cleaning, copier maintenance, computer system optimization, network optimization, etc. ).
2) Installation, purchase and debugging of complete computer, assembly and debugging of spare parts, upgrading, installation and debugging, installation and maintenance of operating system, installation and maintenance of office software, maintenance of other application software, optimization of online installation, installation of printers, scanners, CD-ROMs and CD-ROMs, which are suitable for providing and installing enterprise application software, data backup and computer spare parts procurement services.
3) Maintenance, maintenance, update, upgrade, fault detection and elimination of computer hardware equipment.
Submit the problems of customer's computer equipment and peripheral equipment to customers in writing, and put forward reasonable solutions in the form of written suggestions.
4) Track and record the use, maintenance and repair of hardware equipment and peripheral equipment of each computer, and report to customers in writing.
5) Check the customer's computer hardware and peripheral equipment regularly every day. The enterprise will designate a special person to be responsible for the use of enterprise equipment, and give us feedback in time when problems are found.
6) If there are problems with computer hardware and peripheral equipment that cannot be repaired in a short time, an emergency solution should be found as soon as possible.
7) Printer maintenance, including printer debugging, printer consumables procurement and installation.
8) When customers purchase and upgrade hardware, they should make a comprehensive plan according to the actual situation of the enterprise for customers' reference.
9) Plan the layout of computers and related equipment in the enterprise to prevent signal interference between equipment and invisible loss of components caused by some rays.
10) Check the power supply and wiring used by the computer to prevent the overload of the equipment from affecting the use of the equipment.
1 1) Test the network connection to ensure the normal network access of workstations on the network.
12) is responsible for the maintenance and adjustment of all computer and telephone lines in the customer building, and the corresponding wiring information and drawings are revised. All line adjustments are recorded in writing, and system maintenance and work logs are checked at any time. Do a good job of daily cleaning in the wiring room to make the wiring clear and clearly marked. In order to have a good response when the line is adjusted or troubleshooting.
Arrange and standardize the wiring in the distribution frame and cabinet, and provide reasonable solutions to the existing defects and problems.
13) provides suggestions on debugging, fault diagnosis, routine maintenance, replacement and upgrading of network switches or hubs.
14) Lock the IP address of each computer in the network to prevent computers from being used normally due to IP conflicts.
12 conference system
1) Daily dust removal, power-on test and maintenance of equipment.
2) System wiring layout
knot
The core value of weak current system maintenance is not to replace faulty equipment, but to plan the whole system operation, analyze the causes of problems, foresee problems in advance, eliminate hidden dangers and ensure the stable work of the system. This not only requires the maintenance unit to have the manufacturer's equipment supply resources and the manufacturer's core technical support, but also requires the field personnel resident in the maintenance unit to have rich on-site technical experience and experience in system management and planning, as well as good professionalism and professionalism.
- Related articles
- What is the plot ratio of Emerald Garden in Zaozhuang Greentown?
- There is an electric car charging near Changxindian.
- How about Zhaoqing Zhao Hua Property Service Co., Ltd.?
- Do you want to go to Zhongshan Dayang Electric? Okay£¿ Campus recruitment, internship for 6 months, salary 3 180, transfer to a regular position of 3600, R&D post, urgent, thank you.
- Why are many houses in Tokyo that have been built for more than ten years still empty?
- Which is better, Datong Jasmine Mansion or Xinggang Yulan Pavilion?
- 12358 Acceptance of property scope
- What is the address of Gemini in Chengyang Tianan Digital City?
- The house at home needs to be decorated, and a wall has to be torn down to open the kitchen. I don't know where to report it, whether to register property rights or to find the Housing Authority.
- Why should mortgage be lent to a third-party account?