What is the residential fire acceptance standard?

Before buying a house, besides the price, everyone must consider safety. Safety is the most important issue now, because many times, accidents happen very inadvertently. Therefore, if we can do a good job of prevention before the disaster occurs, we can certainly ensure our own safety. So, what is the residential fire acceptance standard? What is the residential acceptance process?

Code for fire protection acceptance of residential buildings?

Residential fire protection requirements: fire separation and evacuation stairs for apartment houses and apartment offices with commercial business rooms on the ground floor. Width and number of evacuation exits of each unit; Unit interior decoration and mezzanine; Setting of fire control facilities in each unit of high-rise building.

1. Before the completion of the project, the fire pipeline must be flushed, and the turbidity of the flushing water can also be observed during the acceptance of water supply.

2. The position signs of fire pump adapter and fire hydrant should be obvious and easy to see, and the position of bolt mouth should be more convenient to operate. The fire pump adapter and outdoor fire hydrant shall be installed on the wall. For convenience, if there is no special design requirement, the center installation height of water inlet and outlet plugs shall be 1. 1m above the ground. Moreover, in order to prevent accidental injuries such as falling objects from high altitude, corresponding protective measures should be set above the fire fighting equipment.

3. The installation dimensions of the fire pump adapter and outdoor fire hydrant should meet the design requirements, and the allowable deviation of the installation height of the bolt mouth is 20mm, which can be checked by ruler when acceptance.

4. If it is an underground fire pump adapter, the distance between the top water inlet or top water outlet of the underground fire hydrant and the bottom surface of the fire manhole cover should not be greater than 400mm, and there should be enough space in the well and a ladder should be set. In cold areas, extra anti-freezing protection should be done in the well.

What is the residential acceptance process?

1, agreed house acceptance

Receiving the notice of occupancy from the developer (also called the notice of occupancy) marks the beginning of the owner's repossession. If you are out of town and don't have enough time to check in in person, then you must appoint a trusted client to sign all kinds of check-in documents for you. Usually, the developer will send the notice of payment together with the notice of occupancy to the owner, and all the fees payable for occupancy are explained in detail. For example, you must take the rest of your house payment with you at this time, otherwise the developer will calculate your liquidated damages according to the contract (generally two ten thousandths of the total house payment per day).

2. Pay public maintenance funds and property management fees in advance.

The public maintenance fund of the house is the fee you should pay. Even if you don't trust developers, you should realize that the public maintenance fund, which accounts for 2% of the total house price, is only remitted by developers to the government, and they can't take advantage of it. This fee was given to our owners after the establishment of the owners' Committee, and the developers have no right to use it at all.

Step 3 check the quality of the house

When you pay the final payment of the house, public maintenance fund and early property management fee, you should ask to see the existing house. What you should pay most attention to is the quality and area. If it is found that the house is leaking and the floor is obviously cracked, which belongs to the problem that the developer can avoid in the construction process, but there are still mistakes, and you can completely refuse to sign the acceptance certificate.

What the above contents mainly describe is the code for acceptance of residential fire protection in Bian Xiao? What is the specific introduction of the residential acceptance process? The fire protection code for residential buildings is very strict, and everyone should handle it well and abide by it. Once there is a non-compliance, it will not only lead to violations, but also pose a very direct threat to your own safety, so no matter what the situation is, everyone should make this clear.