Job Recruitment Website - Property management company - Regulations on the management of residential decoration in residential quarters?
Regulations on the management of residential decoration in residential quarters?
First, the decoration approval
* * * A * * Decoration Permit System
It is strictly forbidden to decorate or construct without permission. Residents who want to decorate their houses must apply to the Housing Management Department of the Logistics Management Office three days in advance, fill in the decoration items and contents truthfully, and issue a decoration permit after the approval of the Housing Management Department. Residents and construction teams shall go to the comprehensive management office of the hospital to affix their seals and go through relevant formalities with the decoration permit.
* * * II * * * Related expenses
1, and the tenant pays the renovation deposit 1000 yuan. After the decoration is completed, it will be accepted by the Housing Management Department of the Logistics Management Office and returned without violation. The deposit is interest-free.
2. The construction team shall pay the fees. Decoration management fee: one bedroom in 50 yuan, two bedrooms in 80 yuan, three bedrooms 100 yuan.
* * * The Housing Management Department of the Logistics Management Office is responsible for the renovation of the turnover rooms in San * * * schools, and the renovation is carried out according to unified standards. The swing space for the second stay is only repaired and not renovated. If it is really necessary to redecorate, the occupant shall apply, and the Housing Management Department of the Logistics Management Office shall entrust the Repair Department to be responsible for the implementation. Residents who are allocated revolving houses are not allowed to decorate their houses by themselves, and they are not allowed to dismantle and change the original housing structure and facilities.
Second, the provisions of the decoration engineering and parts
* * * A * * Decoration Engineering Clause
1, the building decoration should ensure that the building functions such as fire fighting, heating, water supply, power supply and waterproof are not damaged.
2, can't change or damage the building structure, public facilities, also can't change the use function of buildings and supporting facilities.
3. It is forbidden to dismantle or change the load-bearing structure and envelope structure of the house, and to dismantle and change the pipeline devices, facilities and structures such as water, electricity, natural gas, heaters, telephones and cable TV. Originally assembled in the house. Without approval, no underground pipeline shall be excavated on the load-bearing wall. ?
4. The decoration materials shall not be flammable or volatile toxic substances, and comply with the Code for Fire Protection Design of Interior Decoration of Buildings. ?
5. Surface decoration is allowed for floors, interior walls and ceilings. The ground shall not chisel away the original cement mortar layer; It is forbidden to chisel away the plastering layer of external walls, stairwell walls and household walls; The installation of wooden floor keel shall not be drilled in the ground.
6. The stress point of the ceiling should be set on the surrounding load-bearing wall as far as possible. When drilling holes, hanging objects or fixing objects on the wall, avoid buried pipelines. The ceiling shall be made of light materials, and large lamps and ceiling fans shall not be installed. ?
7. The horizontal clear distance between electrical pipelines and devices and natural gas pipelines shall not be less than 10cm, and the minimum distance between electric wires and natural gas pipelines shall be 3cm. ?
8, are not allowed to arbitrarily increase the ground static load. Don't divide the room with brick walls indoors; Stone with a thickness of more than 1.2cm shall not be used to decorate the ground. ?
9. When packing and decorating water, heating pipes and equipment, we should ensure the normal maintenance in the future. In order to ensure the normal replacement and transformation of the heating pipeline, it is strictly forbidden to wrap the heating pipeline. If it is to be packaged, it must be made into a package.
After dismantling, it is forbidden to package natural gas pipelines and devices. If residents want to build natural gas pipelines, they need to report to the natural gas company for approval, and the natural gas company is responsible for the implementation.
* * * Two * * It is strictly forbidden to dismantle and change the project.
1, load-bearing wall, seismic wall, sill wall, retaining wall.
2, water supply and drainage, heating, natural gas pipelines and devices and facilities.
* * * Three * * Items that are allowed to be modified.
1, partition wall not built to the roof * * * non-brick-concrete structure * * *, such as the partition wall between the north room and the aisle of Buildings 4, 5 and 6, and the partition wall of the kitchen hall.
2. The partition wall of the kitchen hall can be removed, but it cannot be removed. The kitchen foyer should be separated and disconnected.
3. Residents are allowed to replace their own windows * * * including the balcony steel windows of Building 6 * * *.
Three, the management of housing decoration construction units and construction personnel
* * * A * * * All units undertaking housing renovation projects in residential areas shall hold the qualification certificate of the construction enterprise, a copy of the business license of the enterprise and a copy of the legal person ID card issued by the competent department of industry and stamped with the official seal of the Industrial and Commercial Bureau; Individual decoration employees should hold the "four certificates" * * * work permit, ID card, temporary residence permit and post certificate of individual decoration employees * * *, and put them on record in the residential management department.
* * * 2 * * * Construction units and construction personnel should consciously abide by the management regulations of the family area, obey the management of management personnel, and shall not engage in other activities that may cause property losses unrelated to the decoration project.
Compensation according to the price.
Four, decoration construction site management
* * * A * * decoration construction time should strictly abide by the provisions of the hospital comprehensive management office.
* * * II * * * The construction party shall take necessary safety protection and fire control measures to ensure the personal and property safety of residents. It is stipulated that any construction noise other than construction should be regarded as a nuisance. After the warning is invalid, it shall be ordered to stop work and temporarily detain the construction tools until the construction party takes necessary protective measures.
* * * Three * * Garbage and muck generated from house decoration should be bagged and placed at the designated place. It is forbidden to throw it from upstairs to downstairs, and it is forbidden to throw it into garbage passages and sewers. Construction personnel should clean the corridor and the environment outside the building every day, keep it clean, and clean it immediately if building materials and garbage are spilled.
* * * four * * decoration construction shall not be connected to electricity or stay outside; Don't store materials, grandpa's * * * parts and ash * * * mud in the building.
* * * 5 * * Neighborhood conflicts caused by construction shall be solved by decoration households, construction units and relevant personnel, and decoration management personnel may come forward to help solve them when necessary.
* * * Six * * Decoration management personnel conduct daily inspections on the construction site. According to the Measures for Handling Illegal Decoration, illegal builders can be ordered to stop work, be ordered to restore to the original state, detain or confiscate tools, stop water supply and power supply, compensate economic losses, and collect liquidated damages.
Five, housing renovation project dispute handling
* * * A * * If adjoining houses of different nature are damaged or suffer other losses due to decoration construction, the responsible person shall bear all the responsibilities. * * * Adjoining houses with different properties refer to houses connected by different owners' structures or devices.
* * * II * * House decoration is a construction activity in which the owner or user of the house entrusts the construction unit or individual decoration practitioners to carry out construction in accordance with the contract. In case of quality and price disputes, the owner or user of the house may complain to the local building authority or its designated institution, or bring a lawsuit to the local people's court.
Six, decoration acceptance
The owner or user of the house shall apply to the residential management department for acceptance after the house decoration is completed, and the management personnel shall conduct overall acceptance of the renovated house in combination with the daily inspection records. If it passes the acceptance, the construction deposit and decoration deposit will be refunded. Violators will be refunded after being dealt with.
Seven, illegal decoration treatment measures
In order to ensure the structural safety of residential buildings and the normal use of housing equipment, and safeguard the overall interests of the majority of households from being infringed, violations of discipline will be dealt with according to the contents and requirements of the above provisions.
* * * * found for the first time in the decoration inspection * * violates the rules and regulations, which has not caused substantial damage, shall be stopped by the management personnel, and the responsible person shall correct it in time, and shall not be held accountable.
* * * II * * * Decoration without formalities or illegal decoration without correction after being stopped, which has caused damage to housing facilities, shall be ordered to stop work for treatment, and construction can be resumed only after treatment. For those who refuse to stop work, measures such as power failure and detention of construction tools can be taken.
* * * Three * * Handling of offenders
1. If it is renovated without authorization, it shall go through the renovation formalities and pay a penalty of 50- 100 yuan for renovation; The owner of the house shall be responsible for all the consequences caused by the unauthorized increase of renovation projects and renovation beyond the approved scope.
2, one of the following circumstances, must be ordered to restore the original state, and pay a penalty of 200-5000 yuan for renovation, as a fund to restore the original state of the housing structure.
*** 1*** Demolition and transformation of load-bearing parts such as load-bearing walls, sill walls, seismic walls and retaining walls * * *;
***2*** illegally picking slots and making holes;
***3*** The thickness of the floor paving material is greater than1.2cm;
* * * 4 * * Dismantle and change pipelines and terminal equipment without authorization;
***5*** seriously violated the relevant provisions of the Decoration Management Regulations to carry out decoration construction, causing damage to the house.
3. For the parts that cannot be restored to the original state and have an impact on the structural safety of the house, the degree of damage shall be determined by the house safety appraisal department. The residential management department is responsible for applying for appraisal, and the appraisal fee and compensation fee shall be borne by the responsible person.
4. Damaged public parts and facilities used by * * *, the responsible person shall pay compensation according to the price. Anyone who connects the electricity outdoors without permission shall be compensated for the electricity fee 100 yuan.
5, for the destruction of environmental sanitation and public order, depending on the seriousness of the case, shall be ordered to pay 50-200 yuan restoration fee.
6. The residents and the construction party shall bear the repair costs for the self-use parts such as sewer plugs and devices damaged due to decoration.
7. If the adjacent houses are damaged due to decoration, the responsible person shall bear the repair cost of the damaged parts of the adjacent houses.
8. For the construction workers who seriously violate the regulations on the management of residential areas, affect the normal management order, and are criticized and educated by the management personnel as invalid or refuse to accept the treatment, the residential area management department in conjunction with the security department will force them to stop working, detain the construction tools, and expel the construction workers from the residential area.
9. The above compensation fees and liquidated damages are included in the public * * * maintenance fees to supplement the lack of public * * * maintenance funds.
Eight, since the date of promulgation of these regulations, the original documentNo. [200 1]23 "China Youth Political College Residential Housing Decoration Management Regulations" shall be abolished at the same time.
Attachment: Record Approval Form for Residential Decoration Construction * * * Agency Decoration Permit * * *
442
Registration and Approval Form for Residential Decoration Construction * * * Generation Decoration Permit * * *
Decoration householder * * * room number * * * telephone number of the person in charge of the construction team.
Construction method of decoration engineering
I. Demolition and modification of the project
1, partition wall * * * *
2, doors and windows
3. Others
Second, the decoration engineering
1, grounded
Step 2: walls
Step 3: ceiling
4, doors and windows
Chita
Compliance matters
1. Abide by the regulations of college residential decoration and carry out construction in strict accordance with the approved decoration project. It is strictly prohibited to change the decoration project without authorization or to decorate beyond the approved scope.
2. Pay the expenses related to house decoration * * * decoration, construction deposit, decoration management fee, etc.
3. Failure to obtain this form or to carry out the construction according to the regulations is an illegal decoration, and will be investigated and dealt with according to the regulations.
4. This form is valid after being signed by the Housing Management Department and the Hospital General Management Office.
Owner's opinion; Opinions of the construction team;
Opinions of residential management department:
date month year
Opinions of the General Management Office:
date month year
- Previous article:How about Nanning Muning Property Service Co., Ltd. in Guangxi?
- Next article:Midland realty Jiang
- Related articles
- How to apply for 380v charging pile in Ningbo
- Do owners who buy parking spaces still need to pay property management fees?
- What kind of house is Fuzhou Yinjiang?
- Is Huishan Garden in Jiangnan Youth City suitable for living? What is the building quality?
- How about Diqi Primary School in Xianyang?
- When will Building 5 of Huainan Tuoji Plaza be delivered?
- How about Jingda Garden? OK or not? Is it worth buying?
- Why is there a lot of footsteps upstairs? What does the noise level of the house have to do with it?
- How about Nantong Jia Lian Property Management Company?
- When will Yichang Tianchuang Wangjiang Month deliver the house?