On the Contract of Fixture Renovation in 2020

The first model contract for fixture renovation in 2020

Employer (Party A): Contractor (Party B):

In order to standardize the interior decoration construction of the office building and protect the legitimate rights and interests of both parties, according to the principles stipulated in the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, combined with the specific conditions of this project, the two parties reached the following agreement, which shall be abided by by * * *.

I. Overview

1, decoration site.

2. Housing structure: framework

3. Decoration construction content: indoor strong and weak electricity installation.

4. Contracting method: single package

6. Total price:

7. Duration: from month to day.

Two. Material supply agreement

1. Party A provides decoration materials.

2. The materials used in this project, which Party A is responsible for purchasing and supplying, shall be qualified products that meet the design requirements, and shall be supplied to the site on time. If there is any quality problem or specification difference in the materials supplied by Party A, Party B shall promptly raise it with Party A; if Party A still says that it will use them, Party A shall bear the responsibility for the engineering losses caused thereby. After the materials supplied by Party A arrive at the site, Party B shall accept and keep them. Party B shall be responsible for compensation for the losses caused by improper storage. ..

Three. Project quality and acceptance agreement

1, this project takes the construction drawings, practices, design changes, construction and acceptance specifications of architectural decoration projects, unified standards for quality inspection and evaluation of construction and installation projects and construction and acceptance specifications formulated by provincial authorities as quality evaluation and acceptance standards.

2, the project quality should meet the national quality evaluation standards.

3. In case of quality accident due to Party B, the cost of rework shall be borne by Party B, and the construction period shall remain unchanged.

4. After the completion of the project, Party B shall notify Party A for acceptance, and Party A shall organize acceptance within days after receiving the acceptance notice and handle the acceptance handover procedures. If Party A fails to organize the acceptance within the specified time, it shall notify Party B in time and set another acceptance date. However, Party A shall acknowledge the completion date and bear the storage expenses and related expenses of Party B..

Four. Safety production and fire prevention agreement

During the construction period, Party B shall take necessary safety protection and fire-fighting measures to ensure the safe use of electricity, fire prevention, theft prevention and accident prevention, and shall not carry out construction after drinking, so as to ensure that fire exits, electrical lines, gas pipelines, tap water and other pipelines are unblocked and qualified. Party B shall ensure the safety of operators and nearby residents, and prevent accidents such as pipeline blockage, water leakage, power failure and destruction of articles in the homes of nearby residents. In case of the above situation, Party B shall bear the expenses of maintenance, compensation and other related legal responsibilities, which has nothing to do with Party A.. ..

Verb (abbreviation of verb) agreement on project price and settlement

The project payment shall be paid in three installments, with the first installment paid half a month after Party B starts construction.

Intransitive verb others

(I) Work of Party A

1. Party A shall provide Party B with construction drawings or work instructions and make on-site disclosure to Party B before commencement. Provide Party B with necessary equipment such as water and electricity. Construction needs, and explain the matters needing attention in use.

2, do a good job in the construction of temporary use of public parts and affect the neighborhood relations and other coordination work.

3. If it is really necessary to dismantle or change the original building structure or equipment pipeline, it shall go through the corresponding examination and approval procedures at the local housing management department or property management department, and bear the relevant expenses.

(II) Work of Party B

1. Participate in the on-site disclosure of construction drawings or instructions organized by Party A, draw up construction plans and progress plans, and submit them to Party A for approval.

2. Appoint (name) as the representative of Party B at the construction site, and be responsible for the performance of the contract. Organize the construction according to the requirements, ensure the quality and quantity, complete the construction tasks on schedule, and solve all matters that Party B is responsible for.

3. Without the consent of Party A and the approval of the local housing management or property management department, the original building structure and various equipment and pipelines shall not be dismantled at will.

4. Party B shall undertake the warranty responsibility within the scope of its decoration construction, and the warranty period shall be _ _ _ _ _ _ years from the date when the project is completed and accepted by Party A. ..

Seven. responsibility for breach of contract

1. Default caused by force majeure.

2. Both parties shall abide by this contract. If one party breaches the contract, the breaching party shall pay liquidated damages to the observant party.

3. Party B shall properly protect the materials and articles provided by Party A, and compensate for any damage.

4. Without going through any formalities, Party A requires Party B to dismantle and change the original building structure and equipment pipelines, and Party A shall be responsible for the losses or accidents (including fines) caused thereby.

5. Without the consent of Party A, Party B dismantles or alters the original building structure or equipment pipeline without authorization, and Party B shall be responsible for the losses or accidents (including fines) caused thereby.

Eight, dispute handling methods

1. In case of any dispute during the performance of this contract, both parties shall settle it through negotiation without affecting the project progress.

2. If both parties are unwilling to settle the dispute through negotiation or mediation, or negotiation or mediation fails, both parties agree to bring a lawsuit to the local people's court for any dispute arising during the execution of this contract.

Nine. Other agreements

X this agreement is made in duplicate, one for each party, with the same legal effect.

Party A (signature): Party B (seal)

Tel: Tel:

Date of signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

The second model contract for fixture renovation in 2020

Owner (hereinafter referred to as Party A): Construction Team (hereinafter referred to as Party B) In accordance with the Contract Law and other relevant laws, on the basis of equality and fairness, and in line with the principle of friendly cooperation, Party A and Party B signed the following contract:

I. Overview of the Project

Project address:

Use area:

Second, the price

Settlement labor cost: ¥ in words:

These expenses include plumbers, masons, garbage cleaning fees and material handling fees.

Three. terms of payment

1, RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. After completion of bricklayer's work, pay RMB _ _ _ _ _ _ _ _ _ _;

3, after the completion of the project, pay _ _ _ _ _ _ _ yuan;

4. Receipts shall be issued for the capital transactions between the two parties.

Fourth, the construction period

The construction period is days, from month to month.

If the construction period is delayed due to Party A's reasons, the construction period will be postponed; If the construction period is delayed due to Party B's reasons, Party A may deduct Party B's labor cost by ¥ days.

Verb (abbreviation for verb) architecture

1. Party A shall provide Party B with a full set of drawings, * * * _ _ _;

2. Where there is no indication in the drawings, Party B shall draw a sketch or discuss with Party A for approval before construction;

3. Each major working procedure (concealed work, structural work and bricklayer) of the construction project content must be approved by Party A before the next working procedure can be started;

4. The construction quality shall be checked and accepted according to the Acceptance Standard for Residential Decoration (DB31/T30-1999).

Intransitive verb material

1. Party B shall provide Party A with a list of materials to be purchased, and Party A shall timely purchase materials for the use of the constructor.

2. Without the consent of Party A, Party B shall not purchase materials by itself. If it has been purchased, Party A has the right to unconditionally refuse to use the materials and refuse to pay the materials.

3. Party B shall check and accept the quality and quantity of building materials purchased by Party A, and raise quality problems with Party A in time, and have the right to refuse to use them. If Party A insists on using it, it shall request Party B in writing, and the losses caused by the quality of materials shall be borne by Party A;

4. Party B shall properly keep the materials and prohibit other personnel from entering the construction site.

5. Without the permission of Party A, Party B shall not take any building materials out of the house. If such a phenomenon is found, twice the material price will be deducted from the labor cost.

6. The quantity error of materials provided by Party B is between 5% and 10%. If Party B's material estimation exceeds the error range, Party B shall bear the losses caused by the re-purchase of materials and equipment or the non-return of materials and equipment.

7. Party B shall carry the tools needed for construction and ensure the safety and good usability of the tools.

Verb (abbreviation of verb) labor management

1. Party B shall provide Party A with copies of ID cards of all construction personnel before the commencement of construction;

2. Without Party A's permission, off-site construction personnel shall not spend the night at the site;

3. Party A shall handle the community access card for Party B in time;

4. Without the consent of Party A, Party B shall not change the construction personnel at will;

5. Without the consent of Party A, Party B shall not stop work or stop work under any circumstances.

Six, on-site management

It is forbidden to use open flames on site; Smoking is prohibited on site; Paint materials must be placed separately from other materials.

Seven. Project management and project change agreement

1. Before starting work, Party B shall check the water, electricity, floor and hollowing on the top of the wall, and notify Party A in time if any problems are found, and Party A shall be responsible for solving and coordinating them.

2. In the process of construction, Party B shall take necessary safety protection and fire control measures to ensure the safety of workers and nearby residents, and prevent accidents such as pipeline blockage, water leakage, power failure and destruction of houses and articles of nearby residents. In case of the above situation, if it is Party B's responsibility, Party B shall be responsible for maintenance and compensation.

3. Keep the site clean. After the construction is completed every day, Party B is responsible for removing the garbage generated in the construction process and stacking it in the place designated by the property management enterprise. This fee has been included in the total price.

Eight, project acceptance

Party A and Party B shall handle the acceptance formalities of concealed works and intermediate works in time, and Party B shall notify Party A of the acceptance two days in advance, and both parties shall negotiate the acceptance date. After the completion of the hydropower project, Party B shall make a hydropower wiring diagram and submit it to Party A within 5 days. If the acceptance is unqualified, the site will be completely closed and Party B will rework it until it is qualified. The expenses and losses caused by rework shall be borne by Party B. ..

Nine. Dispute mediation

In case of any dispute during the performance of this contract, both parties shall settle it through consultation without affecting the project progress. If the parties are unwilling to settle the dispute through consultation, or if consultation fails, they may bring a lawsuit to the people's court in accordance with the contract.

X this contract is made in duplicate, one for each party, with the same legal effect.

Party A: Party B:

Signature: signature:

Date of signing: Date of signing:

The third 2020 model contract for tooling renovation

1, type of work, (plumber, bricklayer, carpenter, mechanic, oiler, five items) 2. Building engineering, mechanic, scraping wall, cutting ditch, transporting residual soil downstairs, feeding, sand and cement. Attention; There is a load-bearing wall inside the wall. If the property is blocked during construction, the construction party can help coordinate, and if there are serious consequences, the owner will handle them himself. Because this is illegal construction, it can only be said that it is discussed with the property. In addition, it is illegal for the owner to ask the construction party to change the heating operation seal for the corridor, and the construction party also helps to coordinate. If negotiation fails during construction, the owner shall handle it by himself.

3, plumber, change the hot and cold water, change the heating, install the toilet, faucet, lamp, socket, switch the fire.

4, bricklayer, wall brick, balcony, bathroom, kitchen.

5. Carpenters, platforms, hanging cabinets, balcony cabinets, three doorways, two dumb mouths, entrance doors and window openings are all paint-free. Bathroom gusset plate, balcony gusset plate, kitchen artificial beam.

6, oil workers, painting the house.

7. Party A, the contractor, is responsible for cleaning and repairing materials, cement, sand, gusset plates and paint-free doors and windows. Platform hanging cabinet, floor tile and wall tile, coating.

8. Lights, switches, sockets, hardware, locks, faucets, toilets, basins, wires, plumbing parts, floors and hoses that Party B is responsible for.

9. The contractor is a one-price project with a total cost of 24,000 yuan.

10, and the warranty period is one year.

1 1. Payment method: down payment 10000 yuan after signing the contract, 8,000 yuan for carpentry, 5,000 yuan for oilman and 3,000 yuan after acceptance.

Party A;

Party B;