Charging piles are not allowed to be installed on bridges.

The property said to cooperate with the installation of charging piles, but it is not allowed to take the open wire.

1. First, make sure how big the current is. If it's not big, it doesn't matter. If it is larger, brackets can be added in the middle of the bridge at regular intervals to separate the wires. Generally, it is not necessary to make two bridges, which are too expensive, but if there are too many lines, it is not feasible to use a bridge that looks like one outside but has a partition in the middle;

2. The second is the filling rate. If the filling rate reaches more than 80%, there will be problems. Suggest expanding the bridge! Otherwise, it's okay to put it in now, and you won't find out if something goes wrong in the future.

3. Finally, it is suggested that the bridge should be separated. Once there is a problem in erection, the workload of the extended bridge is even greater than that of the new bridge. But you have to separate the wires first, otherwise, after a fever, sometimes there will be problems when it thunders, and it will burn down completely, which will not pay off!