Matters needing attention in installation of partition in Longxiang, Shijiazhuang, Gao Dai, Denmark.
The most suitable time for construction is before on-site decoration.
2 measurement and positioning according to the construction drawing, the position control line of movable partition wall is released on the indoor ground, and the position line of partition wall is led to the side wall and roof.
The installation position line of the fixed part should be popped up when the line is played.
The installation height of the track must be discussed with the construction team that installed the ceiling, otherwise it will cause great trouble.
3. Installation of steel structure and track fasteners The steel structure is a load-bearing structure connecting the roof and the track. Steel structure is related to the safety of the whole movable partition system, so it must not be taken lightly.
According to the construction drawing, blow screws on the roof, and then weld the fixed angle iron.
According to the design requirements, choose the track fixing parts.
Before installing the track, the sealing of walls, floors and ceilings should be considered to facilitate the installation of movable partitions. By calculating the weight of movable partition wall, the load borne by the track, the specifications and fixing methods of embedded parts are determined.
The embedded parts of the track shall be installed firmly, and the track and the main structure shall be fixed firmly. All metal parts should be rustproof.
4. Installation of track (1) Suspended track: The fixing method of suspended guide is to install pulleys on the top surface of the partition and connect them with the upper suspended track.
The track and pulley should be selected according to the bearing weight.
Light movable partition wall, the track is fixed on the wooden frame or steel frame along the top with wooden screws or opposite screws.
Heavy movable partition walls and tracks are fixed on the steel skeleton with opposite screws or welding.
⑵ Supporting track: The fixed way of supporting and guiding is that the pulley is at the lower part of the partition and forms a lower supporting point with the ground track.
The track is fixed with expansion bolts or track embedded parts, and the guide rail is installed on the wooden frame along the top.
(3) When installing the track, install the reserved opening of pulley or track in advance (generally at the partition of 1/2 near the wall). 5 Install movable panels, accurately draw the alignment of pulleys on each panel according to the installation method, and then fix the pulley fixing frame on the upper stile or lower stile of the partition with screws.
Then put the panels into the track one by one, adjust each panel to be vertical to the ground, push and pull flexibly, and finally connect and fix each fan.
Usually, adjacent panels are connected by hinges.
6. Finish the finish according to the design requirements.
Generally, soft bags, cold-loaded solid wood boards, decorative boards and glass panels are used.
After finishing, paint finishing or edging should be carried out.
Finishing decoration construction should be carried out according to the corresponding requirements of two standards.
7. Debugging After the installation of the movable panel is completed, it is necessary to debug the panel height, sealing and other details. After debugging, clean up the site and complete the installation work.
National Owner Decoration Exchange Group 573032 185
- Previous article:Is it illegal for electric vehicles in residential areas to occupy parking spaces?
- Next article:Second-hand house decoration process
- Related articles
- Where is Suixi Country Garden in Huaibei?
- Can Hefei property fee be invoiced electronically?
- What is the sales service hotline of Xi Anlong Lake and Lin Jing Jiuxu?
- What is the telephone number of Jingdezhen China-Austria Olympic City International Marketing Center?
- Where is Yonghe Jing House on Zhenbao Island in Shangqiu?
- Is the property of New Town Peony Century Light good?
- How long is the property right of Xijing Chang 'an?
- How to deal with disputes between property companies and owners about property service management and property fees?
- How about Yili Companion Yuanshe B&B Hotel Co., Ltd.
- How much is the property fee in Hangzhou?