Job Recruitment Website - Property management company - Does the charging pile have to be stamped with the property?

Does the charging pile have to be stamped with the property?

Step 1: Buy a car

so this is it? Need? As I said, in Beijing, except for a few brands, you can basically buy an electric car and send it to the charging pile for installation (piles and 30 meters are free, and digging trenches is now charged).

Step 2: Need to stamp? Materials (including property management companies and 4S stores)

Let the 4S shop do it accordingly? Materials. Including:

1. Letter of Intent to Buy a Car (sealed by 4S Store)

2. Proof of property right or use right of parking space (seal of property right)

3. About installing electric vehicle charging equipment in parking spaces? Application (Property Seal)

4. New energy? Confirmation of charging conditions for bus purchase (self-use) (4S stores and properties need to be stamped)

Usually these materials are produced by 4s shops? Stamp, because the property management company? Stamp? Stamp in advance. Sure, to save trouble? Run twice. You can also ask for materials? Will the 4s shop stamp first? . Then we can take these materials to the property management company. This step is the hardest? As mentioned above, can you stamp it happily? The property management company needs our car owners to discuss with the property management company.

First one? Steps: start applying for electric piles? Process (with Anzhuang Company? Contact)

Did the owner inform the 4s shop that the seal had been stamped? 4S stores will randomly or designate Anzhuang Company to contact the owner. It should be noted in this step that once the owner requests to start installing piles, the installation must be completed within one year, otherwise the indicators will be invalid. ? About two weeks left? Anzhuang company will send someone to make a field trip and coordinate with you to determine the installation? Location (can be adjusted during actual installation). He will make it clear to you that piling is free? In addition to the 30-meter-long rice noodle and pile head, there are some additional expenses, including pedestal and trenching. Fees, issue the Preliminary Feasibility Plan for Self-use Charging Facilities and sign it by the owner (just sign, details? Use it). Charge first at the same time? Are you ready? Materials, and the owner needs to provide two copies of ID card.

Step 4: Anzhuang Company applies to the power company to install electric meters.

This step? If the owner needs to operate, Anzhuang Company will submit the corresponding materials to the power company and get the electric card. After the acceptance is successful, the power company will send a short message to inform the owner that it has entered the meter installation process. After a week, the power company will send someone to the designated place to install the national grid? Special electricity meter, at home? Keep people, put on the meter, and they? Mission accomplished.

The master of the power company installed the electric meter.

Power distribution box

electricity meter

Step 5: Anzhuang Company installs charging piles.

After the electric power company installs the electric meter, the owner can make an appointment for Anzhuang Company to install the charging pile? Time (usually one week).

Anzhuang Company sent someone to install the charging pile at home. Will it be installed before? State Grid issues special watt-hour meter cards to users. If the owner wants to install a protective box on the charging pile, or something else? Ask the workers to be told in advance? , talk? Price, free? I can't handle it for the time being. After the installation is completed, the owner needs to accept the charging pile and check whether the function is completed. Can the electricity card of the electricity meter be recharged normally (the electricity card is recharged by the State Grid for the first time 100 yuan, and the owner needs to return it next time), and what about the charging pile? Whether the startup card can be activated normally. Sign and hand over after acceptance, and the process ends.

Pile installation

mounting base

The master of Anzhuang Company is installing the pile.

Pile installation completed

Normal charging

Follow up:

I faked it Can I enjoy the charging pile? . * * * Enjoy private equity? Stick the pile on the internet, and now you don't fill it yourself? Do you need time? The owner of the car is here to collect fees. Do you earn a certain amount? Income. This is a win-win situation? Things, because? Are all electric car owners qualified to install piles in their own homes? . Moreover, fast charging is harmful to the battery and expensive. Suggest all? Can the pile owner enjoy it? All * * * like it.