Job Recruitment Website - Property management company - How should I draw the water and electricity required by the property?
How should I draw the water and electricity required by the property?
The hydropower map required by the property can be said to be the completed hydropower map of the building.
The water and electricity diagram is the diagram of the line direction, switch nodes, meter box and drawings on the structural diagram of your room.
As-built drawings illustrate the main projects:
A, water supply and drainage, electrical design content
Second, the selection and laying methods of water pipes, conduits, wires and accessories
Three, water supply and drainage sanitary ware, electrical equipment installation height
Fourth, the drawings change content
Five, the construction operation specification
Six, other special instructions
- Previous article:Which is more promising, Longwan City or Nanhu Lake?
- Next article:Which is better, Yingxiu Huafu or Longyue Mansion in Jinan?
- Related articles
- Summer scenery hotel
- How to get from Taiyuan Station to Kaixuan Street in East Central?
- Is it legal to charge parking spaces by the hour?
- What honors did IKEA win in the process of creating the bio-industry?
- The property requires 72M ADSL to be converted into optical LAN, and the other end uses optical cat to dial up the Internet.
- The house we rent doesn't have any electrical appliances. Every night, we turn on the water heater to take a bath, turn on the light for about an hour, and warm the light in the bathroom for an hour.
- 120 summary of the work of the command center
- What about Yueyang Pengcheng Property Management Company?
- How to send a lawyer's letter to the property fee?
- Where is Tianjin Dahua Qingshui Bay?