Commitment letter of construction progress

Commitment letters are used more and more now. Compared with verbal commitment, commitment letter is more binding. Do you know the format of the letter of commitment? The following is a sample of the construction progress commitment letter I compiled for you, hoping to help you.

Model Letter of Commitment on the Construction Progress of Northwest Sichuan Gas Mine of China Petroleum Southwest Oil and Gas Field Company 1;

In order to ensure the smooth completion of the production road reconstruction project (k3+480 to k5+550) in Qionglai operation area of Northwest Sichuan Gas Mine, according to the Notice of Northwest Sichuan Gas Mine on Implementing the "Two Commitments" System for Foreign Construction Teams and Material Suppliers, our unit solemnly promises:

1, 20xx March 1, go to the grass-roots unit to handle the entrance permit and special operation permit, and start the preparation work before entering the site.

On March 2, 2.20xx, the construction team of our company entered the site for construction.

3. Complete the construction within 38 working days from the mobilization date, and promise to complete the construction before April 8, 20xx. Relevant personnel of our unit are familiar with the contents of this letter of commitment and are willing to seriously implement it. If you violate this commitment, you are willing to bear all corresponding responsibilities; If the project is not completed on time, it shall bear the corresponding liquidated damages in accordance with the contract.

The validity period of this letter of commitment is: three months after the completion and acceptance of the project, and it will take effect from the date when the project starts to enter the site.

Signature of the promisor:

Commitment unit (seal):

Xx,xx,XX,XX

The construction progress commitment letter model 2 1 and the brick masonry of the comprehensive building are scheduled to be completed on August 20xx 19 (including constructional columns).

2. The concrete of the solar energy base on the roof of the northern section is scheduled to be completed on the 6th.

3. Slag concrete pouring in the gutter is scheduled to be completed on the 9th of this month.

4. The leveling and calendering of cement mortar under waterproof of flat roof and inclined roof is planned to be completed on June, 2004 14.

5. The leveling and calendering of the reinforced concrete main body, brick wall concrete building, sloping plate of roof and cement mortar under roof waterproofing of auxiliary workshop, boiler room and fire pool are planned to be completed before September 5 (Note: the pouring parts of commercial concrete in boiler room and fire pool: bottom plate and shear wall. The rest of C 15 concrete cushion adopts self-mixed concrete, and the concrete is transported by on-site loader. )

6. The reinforced concrete main body (including the foundation part) of the underground passage in the east section is planned to be completed within 20 days from the second day after the foundation excavation is completed (the handover date is subject to the on-site signature). The above six tasks can be completed on time, and the project payment will be paid to Party B within five days after acceptance. If the task is not completed on time, the project department will punish Party B (the main team) for every day of delay. If the above tasks can be completed one day ahead of schedule, the project department will reward Party B (home team) with a bonus of 4‰ of the total project cost of the comprehensive building one day ahead of schedule, and will punish Party B (home team) for each day of delay.

In case of force majeure during construction, this letter of commitment will be postponed according to the actual signature of the site foreman, and construction will be carried out in light rain.

Commitment:

20xx year x month x day

Commitment letter for _ _ _ _ construction progress (Mode 3)

Our team fully responded to the construction progress plan of the second phase project of Beijing International Residential Quarter, and carried out the construction in strict accordance with the requirements of design drawings, specifications, atlas and local standards. Our team guarantees to complete all construction contents on time and with good quality, and our team is willing to make the following solemn commitments:

1, project quality: ensure that it reaches the acceptance level of construction specifications; If the completion acceptance fails to reach the qualified level, 2% of the project settlement price will be deducted as liquidated damages voluntarily.

2. Time limit: ensure that the structural capping is completed on June 365438+February 3 1 day in 20xx. If the construction period is delayed due to our reasons, we voluntarily accept the penalty of 1‰/ day of the total contract price, and the total penalty shall not exceed 5% of the total contract price. Construction should be strictly in accordance with. Node duration set by your company. If the total construction period is delayed by more than 65,438+05 calendar days due to our reasons (in case of rain, snow and force majeure, the construction period will be postponed), you can unilaterally terminate the contract and change the construction unit.

3. Safe and civilized construction: ensure that no general or above safety accidents occur, that civilized construction meets the requirements of jgj-20xx Safety Inspection Standard for Building Construction, and that all safety inspection scores reach the qualified standards and above, and timely cooperate with and complete the safety and civilized construction instructions issued by the project department.

4. Arrange a quality and safety inspection team leader for each building to ensure that the quality acceptance is passed at one time. Those who fail to pass the acceptance will be fined 1 1,000 yuan. After two failures, our team automatically gave up the construction task in this project department, and the completed workload was settled according to the contract price.

Hereby promise

Commitment team:

20xx May 30th

Construction progress commitment model essay 4 is to speed up the construction of projects under construction and the completion acceptance of existing projects, ensure that all construction projects complete their tasks on time with good quality and quantity, and clarify the project responsible person. Each group abides by the following commitments:

1, each team leader is the first responsible person, who is fully responsible for completing the management of the project construction stage or completion acceptance stage of this team, and the team members undertake the project responsibilities according to the division of labor.

2. The main responsibilities are: responsible for the preliminary procedures and drawing marking of this group of projects; Responsible for the preparation of bill of quantities, price control, bidding and contract signing of this group of projects; Responsible for the management of the construction stage and completion acceptance stage of this group of projects; Complete the completion acceptance, settlement and handover of the completed project; For projects under construction, it is necessary to advance efficiently as planned according to the contract; Ensure that all projects are successfully completed according to the requirements of safe production.

3. Each team must make a project work arrangement or work schedule months ago and submit it to the project construction supervision team. Take the year, month and day as the end point of the project, make a clear commitment to the progress of the project under construction, and complete the completion acceptance, settlement and handover of the completed project. After the plan and schedule are approved, no one may change them without approval.

4, each team by the specialist is responsible for reporting the project progress to the project supervision team, reporting time is scheduled for every Friday morning. Each group should strictly perform their duties and have a clear division of labor. Dereliction of duty, buck passing and slacking are prohibited. The person in charge of the group has the right to ask other departments or units of the company to cooperate with the relevant work of each group.

5, team according to the completion of each project, by the engineering supervision team to make evaluation, according to the "xx rewards and punishments management measures" to give the general manager collective rewards and special rewards. If the project work is not completed according to the planned time, the team leader shall be given suspension, demotion, salary reduction and termination of labor relations according to the degree of project completion (such as 90%, 80%, 70% and 60% of the total project completion), and other team members shall deal with it according to the situation of the team leader.

6. Please do your duty and strictly abide by the above commitments. This commitment shall take effect from the date of signature, and then it shall automatically become invalid. If there are no special requirements, members of each project team should return to their original work departments.

7, this commitment to accept the supervision of the new district management committee, xx Commission for Discipline Inspection, engineering supervision team, enterprise employees and society.

8. This undertaking is made in duplicate.

Commitment: