Who has a model contract for home water and electricity installation?

Employer (Party A):

Contractor (Party B):

In order to standardize the construction of home interior decoration and protect the legitimate rights and interests of both parties, according to the Economic Contract Law of the People's Republic of China, the Regulations on Construction and Installation Contracts, the Law of People's Republic of China (PRC) on the Protection of Consumers' Rights and Interests, the Provincial Regulations on the Protection of Consumers' Legal Rights and Interests and other laws and regulations, the Ministry of Construction of People's Republic of China (PRC) (1997) No.92 document ".

I. Overview

1. The house decorated by Party A is legally inhabited.

Party B is an enterprise legal person, other economic organizations and individual industrial and commercial households with architectural decoration qualification in this province (city) and approved and registered by the administrative department for industry and commerce.

2. Decoration construction site: urban (county) road (village) lane/building KLOC-0/.

3. Housing structure:

4. Decoration construction content:

Remarks on decoration contents and requirements of other parts of the room

5. Signing method:

6. Total price: RMB (including labor cost and material cost, see the list for details). )

7. Duration: from the date of commencement to the date of completion. The construction period is days.

Two. Material supply agreement

1. Information provided by Party A.

Name, specification, model, unit quantity and quality grade of materials or equipment that arrive at the site within the specified time.

comment

The materials and equipment purchased and supplied by Party A in this project shall be qualified products that meet the design requirements, and shall be supplied to the site on time. If there is any quality problem or specification difference in the materials and equipment supplied by Party A, Party B shall promptly raise it with Party A; if Party A still says that it will be used, Party A shall bear the responsibility for the engineering losses. After the materials supplied by Party A arrive at the site, Party B shall accept and keep them. Party B shall be responsible for compensation for the losses caused by improper storage. ..

2. Materials purchased by Party B

No. material or equipment name specification model manufacturer (brand) unit quantity quality grade unit price (below the restricted price) total price Party B shall submit the purchase invoice to Party A for the renovation of residential buildings agreed in this contract, and shall not use it for other purposes without Party A's consent ... If Party B violates this regulation, it shall compensate Party A at twice the price of misappropriated materials. If the materials provided by Party B are fake and shoddy goods, Party A shall receive compensation of times the price of the materials provided.

If the materials and equipment purchased by Party B do not meet the quality requirements or have different specifications, they shall not be used. If it has been used, Party B shall be responsible for the losses caused to the project.

Three. Project quality and acceptance agreement

1. This project is based on construction drawings, practices, design changes and "architectural decoration project".

Engineering and acceptance standards, unified standards for quality inspection and evaluation of construction and installation projects and construction and acceptance standards formulated by provincial authorities are acceptance standards for quality evaluation.

2. The quality of this project should meet the national quality evaluation standards. When Party A requires part or all of the project to reach the excellent standard, Party A shall pay the increased cost to Party B. #p# header #e#

3. If the quality of materials and equipment provided by Party A is not up to standard, which will affect the project quality, the cost of rework shall be borne by Party A, and the construction period shall be postponed.

4. In case of quality accident due to Party B, the cost of rework shall be borne by Party B, and the construction period shall remain unchanged.

5. After the completion of the project, Party B shall notify Party A for acceptance, and Party A shall organize acceptance within days after receiving the acceptance notice, and go through the acceptance handover procedures. If Party A fails to organize the acceptance within the specified time, it shall notify Party B in time and set another acceptance date. However, Party A shall acknowledge the completion date and bear the storage expenses and related expenses of Party B..

Four. Safety production and fire prevention agreement

The construction drawings or practice instructions provided by Party A and the construction site shall meet the requirements of fire prevention and accident prevention, mainly including the smoothness and qualification of electrical lines, gas pipelines, tap water and other pipelines. During the construction period, Party B shall take necessary safety protection and fire control measures to ensure the safety of operators and surrounding residents, and prevent accidents such as pipeline blockage, water leakage, power failure, and destruction of household items of surrounding residents. In case of the above situation, Party A shall be responsible for compensation; Where Party B is responsible, Party B shall be responsible for repair and compensation.

Verb (abbreviation of verb) agreement on project price and settlement

1. After signing the contract, Party A shall pay% of the total price, RMB;

Before, Party A shall pay% of the total price, RMB Yuan; Before, Party A shall pay% of the total price, RMB Yuan; Before, Party A shall pay% of the total price, RMB Yuan; Party A shall pay the final payment in one lump sum within the day after the project is completed and accepted.

2. During Party B's construction, if Party A requests to increase the workload or change the construction contents and requirements midway, Party A shall pay extra fees and postpone the construction period (the specific contents shall be subject to the supplementary agreement, which is an integral part of this contract).

3. Both parties to the currency transaction shall issue invoices (or receipts).

Intransitive verb others

(I) Work of Party A

1. Party A shall provide Party B with a construction drawing or practice approved by the housing management department or the property management department one day before the start of construction, and make on-site disclosure to Party B ... Empty all or part of the house and remove obstacles that affect the construction. Take protective measures for furniture and furnishings stranded in houses that can only be partially vacated. Provide Party B with necessary equipment such as water and electricity. Construction needs, and explain the matters needing attention in use.

2. Do a good job in the construction of temporary use of public parts and affect neighborhood relations and other coordination work.

3. If it is really necessary to dismantle or change the original building structure or equipment pipeline, it shall go through the corresponding examination and approval procedures at the local housing management department or property management department, and bear the relevant expenses.

(II) Work of Party B

(1) Participate in on-site disclosure of construction drawings or work instructions organized by Party A, draw up construction plans and progress plans, and submit them to Party A for approval.

② Appoint (name) as the on-site representative of Party B to be responsible for the performance of the contract. Organize the construction according to the requirements, ensure the quality and quantity, complete the construction tasks on schedule, and solve all matters that Party B is responsible for.

(3) Without the consent of Party A and the approval of the local housing management or property management department, the original building structure and various equipment and pipelines shall not be dismantled at will. #p# header #e#

(4) Party B shall undertake the warranty responsibility within the scope of its decoration construction, and the warranty period shall be months from the date when the project is completed and accepted by Party A. ..

Seven. responsibility for breach of contract

1. Party A shall compensate Party B for the delay or shutdown caused by Party A..

Party A shall pay RMB to Party B for each day of shutdown or shutdown; If Party A fails to make payment as agreed in the contract, Party A shall pay% of the overdue payment as penalty for each day overdue.

2. If the completion of the project is delayed due to Party B's reasons, Party B shall pay% of the accumulated payment to Party A as liquidated damages for each day overdue. If the overdue period is more than days, Party B shall return all the money paid by Party A to Party A..

3. Party B shall properly protect the equipment provided by Party A and the furniture, furnishings and other articles stacked on site. If there is any damage, Party B shall be responsible for compensation.

4. Without going through any formalities, Party A requires Party B to dismantle and change the original building structure and equipment pipelines, and Party A shall be responsible for the losses or accidents (including fines) caused thereby.

5. Without the consent of Party A, Party B dismantles or alters the original building structure or equipment pipeline without authorization, and Party B shall be responsible for the losses or accidents (including fines) caused thereby.

Eight, dispute handling methods

1. In case of any dispute during the performance of this contract, both parties can settle it through consultation or ask the construction administrative department or consumer association where the decorated house is located for mediation without affecting the progress of the project.

2. If both parties are unwilling to settle the dispute through negotiation or mediation, or negotiation or mediation fails, both parties agree that the dispute arising from the performance of this contract shall be arbitrated by the arbitration commission (if both parties have not agreed on an arbitration institution and have not reached a written arbitration agreement afterwards, they may bring a lawsuit to the people's court).

Nine. Other agreements

X this agreement is made in duplicate, one for each party, with the same legal effect.

The annexes to this contract include:

Party A (signature): Party B (seal)

Authorized Agent: Legal Representative:

Address: Address:

Tel: Tel:

Postal code:

bank of deposit

Account name:

Account number:

Date of signature: year month day.