Job Recruitment Website - Property management company - What's the difference between the fire acceptance opinions of building engineering and the fire design audit opinions?

What's the difference between the fire acceptance opinions of building engineering and the fire design audit opinions?

Before the construction project starts, the design scheme (drawings) shall be submitted to the public security fire control institutions for review, and the fire control institutions shall issue fire control design review opinions. There are two opinions: 1. Unqualified. No construction, and put forward the unqualified basis. The design unit must modify the design scheme until it is qualified. 2。 Qualified. Construction is allowed.

According to the plan (drawing) approved by the fire department, after the project is completed, the fire department will conduct fire inspection and acceptance of the project. Acceptance, the fire department issued a fire inspection opinions; Unqualified acceptance must be rectified. If the rectification still does not meet the requirements, the fire control institution will issue an unqualified opinion on fire control acceptance.

As can be seen from the above, the fire protection design audit opinion only proves whether the fire protection design of the building project is qualified; Only the "fire acceptance opinion" can truly prove whether the fire protection of the building project is qualified. The design audit is qualified, but the acceptance may not be qualified, and it is useless for the property management office to provide fire protection design audit opinions.

Of course, only after the design has passed the examination can there be acceptance.