What information and drawings should be handed over between real estate and property?

1, planning, construction and completion acceptance data

Notes on serial number data names

1 Community Master Plan

2 construction project planning permit

3. Construction project planning acceptance certificate

4. The building naming approval form

5 Report on Boundary Pillar Setting Point

6 construction project commencement permit

7 engineering quality assurance

8 residential instruction manual

9 Housing Traffic Control List

10 handover list of public facilities and public places

1 1 water supply contract

12 power supply contract

13 postal application form

14 gas engineering quality grade certificate

15 site certificate of motor vehicle parking lot (garage)

16 fire control acceptance certificate of public security fire station construction project

17 construction project completion acceptance certificate

18 engineering quality grade verification certificate

2, property rights and physical takeover acceptance data

Notes on serial number data names

1 land use right transfer contract

2 handover certificate

3. List of handover, acceptance and handover of public facilities and sites.

4 * * * Equipment handover acceptance list

5 key handover acceptance list

3, engineering drawings to take over the acceptance data

The name of the serial number material is called precautions.

1 greening scheme

2 Intelligent system completion drawing

3 building completion drawing

4 structural completion drawing

5 Water supply and drainage completion drawing

6 electrical completion drawing

7 curtain wall completion drawing

8 fire electrical completion drawings and materials

9 underground parking plan

10 outdoor water supply and drainage pipeline completion data

1 1 gas project completion drawing

12 elevator completion drawing

13 general construction drawing

14 construction drawing

15 structural construction drawing

16 air conditioning construction drawing

17 fire electrical construction drawing

18 water supply and drainage construction drawing

19 electrical construction drawing

20 weak current construction drawing

4, equipment technical data to take over the acceptance

The number of the material is called a note.

1 completion data of intelligent system (including fire fighting)

2 elevator system

3 Power transformation and distribution system

4 water supply and drainage system

5 air conditioning system

6 swimming pool equipment