What do you need to do after the renovation?

Many owners may not know what to do when sorting out. In fact, as the last link of decoration, it occupies a very important position and will present a complete home to the owner after completion. So all kinds of details should be carefully considered in this process. For example, the installation of lamps, cabinets and wooden doors. , the choice of floor, hardware pendants, the installation of sanitary ware, and so on. Next, I will introduce some small details that should be paid attention to in all aspects of installation.

1. Cabinet installation

After the ceiling is completed, you can make an appointment to install the cabinet at home. If it goes well, it can be finished in one day. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.

2. Wooden door installation

The production cycle of wooden doors is generally one month. Therefore, in order to make the construction period closely connected, it is necessary to let the wooden door manufacturer come to measure the size of the door opening as soon as possible after the main body is removed. Regarding the handling of doorways, we need to pay attention to one thing. If the height of the door at home is inconsistent, workers need to treat it as the same height to look good.

3. Floor installation

The floor can be installed the day after the wooden door is installed. The following problems should be paid attention to when installing the floor: Before installing the floor, it is best to let the manufacturer go to the door to inspect whether the ground needs leveling or local leveling; Moreover, the floor at home should be cleaned to ensure the dryness of the floor, so don't use water during the cleaning process.

4. Switch socket installation

Generally, one hand is used to switch in the opposite direction, and the right hand is more than the left hand. Therefore, most of the switches at home are installed on the left side of the door, which is convenient to open with the right hand after entering the door. Consistent with behavioral logic.

5. Installation of lamps and lanterns

Lights can be white, yellow and blue (purple). After the lights were installed, the house lit up, saying goodbye to the dazzling light of 100 watt incandescent bulbs during decoration.

6. Hardware sanitary ware installation

Previously bought plumbing accessories, bathroom pendants, toilets, clothes hangers, etc.

Put them together. After the "big things" in front are installed, the home is still very "cold". When the lamps and hardware sanitary ware are installed, the home will be "alive".