What is written in the landing plan?
Question 2: What does the special construction plan include? (1) earthwork excavation.
1, earthwork excavation of foundation pit (ditch, trough) with excavation depth of more than 3m;
2. Earthwork excavation of foundation pits (ditches and troughs) with complicated geological conditions and surrounding environment;
3. Drilling and blasting engineering.
(2) Foundation pit supporting engineering
1, foundation pit (ditch, trough) supporting works with excavation depth of more than 3m;
2, geological conditions and surrounding environment complex foundation pit (ditch, trough) supporting engineering.
(3) Foundation pit dewatering engineering
1, it is necessary to adopt a foundation pit project with artificial water level reduction and excavation depth of 3m or more;
2. Need to use artificial to reduce the water level, geological conditions and complex surrounding environment of foundation pit engineering.
(4) formwork engineering and supporting system
1, tool template engineering, including sliding mode, climbing mode, flying mode, large template, etc.
2, concrete formwork support project
(1) The erection height is more than 5m;
(2) The erection span is more than 10m;
(3) The total building load 10kN/m2 and above;
(4) concentrated line load 15kN/m and above;
(5) The height is greater than the horizontal projection width of the bracket and relatively independent, without structural connection.
3, used for steel structure installation and other load-bearing support system engineering.
(5) Scaffolding engineering
1, floor-standing steel pipe scaffold;
2. Connect the lifting scaffold;
3. Cantilever scaffolding;
4. Hanging basket for aerial work;
5. Self-made unloading platform and mobile operating platform;
6, new special scaffolding.
(6) Lifting and hoisting works
1. Unconventional lifting equipment and methods, single lifting weight 10kN and above lifting projects;
2, the use of lifting machinery and equipment for installation engineering.
(seven) lifting machinery and equipment disassembly project
1. Installation, disassembly and jacking of tower crane;
2. Installation and disassembly of the construction elevator;
3. Installation and disassembly of the material hoist.
(8) Demolition and blasting engineering
1. Demolition of buildings and structures;
2. Demolition by blasting.
(9) Other dangerous projects.
1, building curtain wall installation project;
2. Prestressed structure tensioning project;
3, steel structure and grid engineering;
4, cable-membrane structure installation project;
5, underground excavation, tunnel, pipe jacking construction and underwater operation engineering;
6. Offshore pile foundation engineering;
7. Manual hole-digging belled pile project;
8. The adoption of new technologies, new processes, new materials and new equipment may affect the project quality and construction safety, and there are partial projects without technical standards, as well as other projects that need to prepare special plans.
Compilation content: Except as specified in the engineering construction standards, the special plan shall mainly include the following contents.
(1) Project profile: profile, construction layout, construction requirements and technical guarantee conditions of sub-projects with high risks.
(2) Compilation basis: the contents or provisions of laws, regulations, normative documents, standards and specifications, and the names of technical documents such as construction organization (general) design, survey design and drawings.
(3) Construction plan: including construction progress plan and material and equipment plan.
(4) Construction technology: technical parameters, process flow, construction method, inspection and acceptance, etc.
(5) Construction safety guarantee measures: organizational guarantee, technical measures, emergency plan, monitoring and monitoring, etc.
(6) Labor organization: full-time safety production management personnel and special operations personnel.
(seven) calculation and related drawings and charts.
The Safety Inspection Standard for Construction Continuous Operation stipulates that a special safety continuous operation organization design (scheme) must be prepared separately for projects with strong professionalism.
Name of Chinese entry: "Safety Inspection Standard for Construction Workers" stipulates which professional projects must be independently prepared for special safety worker organization design (scheme).
English entry name:
(1) Scaffolding and unloading platform
1 floor-standing external scaffold construction scheme.
2. Construction scheme of unloading platform (including design and calculation) (floor-standing and cantilever type).
3 cantilever scaffold construction scheme (including design calculation).
4. Portal scaffold construction scheme (including superelevation design calculation).
5. Construction scheme of hanging feet and hands (including design calculation).
6 hanging basket foot hand leveling scheme (including design calculation).
7 Special construction organization design (including design and calculation) of attached lifting scaffold.
(2) Construction scheme of foundation pit support (the depth of foundation pit exceeds 5M, including supporting structure).
(3) Formwork engineering design scheme (including supporting system design calculation and concrete transportation safety measures).
(4) Power consumption for construction ... >>
Question 3: What is the landing plan? It means that after previous consultations and talks, an agreement has been reached, and finally it has entered the implementation stage of substantive operation. To put it bluntly is true.
Question 4: Why is it so difficult to find a marketing planning company? We must find a company that can carry out this plan.
Because many planning schemes only apply templates and are difficult to implement, they cannot be implemented.
The water in it is too deep to be explained clearly in one or two sentences. Just pay attention in the future.
Question 5: How to write the landing plan of the restaurant's one-year strategic plan? Specifically, it is the implementation plan of the business plan.
Question 6: How high is the floor-standing single-row scaffold? It is necessary to write a special plan 1 to build a landing steel pipe scaffold project with a height of more than 24m. Construction enterprises must prepare special construction plans and organize their own demonstration and approval before they can organize their implementation.
2. The erection of floor-standing steel pipe scaffolding with a height of 50m or more is a sub-project with a risk greater than a certain scale. Construction enterprises must prepare a special construction plan and organize experts to demonstrate it before implementation (the demonstration work is organized by the construction industry association).
Question 7: How to write the format of the activity plan? 5 sub-themes: (Title)
Foreword: (Overview)
Significance of carrying out activities: (Why carry out activities)
Activity content: (tell the details and content of the activity)
Activity execution time: (including time period)
Scope of activities: (objects and areas to watch)
Staffing: (according to the position, all tasks are subdivided into each staff member)
Pre-preparation: (Do a good job in the investigation, promotion and expansion of pre-activities and the arrangement of activities equipment. )
Work content: (put forward work requirements, subdivide work tasks, and put forward completed requirements)
Purpose of the activity: (achieve the expected effect)
Effect evaluation (benefit analysis): (expected reaction and effect after the activity)
List of materials: (register all publicity materials and articles used)
Question 8: How to write XXXXX plan in the format of activity planning?
Activity purpose:
Activity theme:
Activity time:
Event organizer:
Activity flow:
1. Early publicity
2. Activities:
3。 Activity summary
Community Cultural Activities in XX Home (2)
-Implementation plan of "XX Home Community Badminton Competition"
I. Name of the event
The Second Cultural Activity in XX Home Community-"Badminton Competition in XX Home Community"
Second, the purpose and significance:
1, through community sports activities such as badminton, build communication platforms between owners and between owners and salespeople.
2. In order to attract more people to pay attention to this series of activities, and then attract them to pay attention to the real estate and expand the popularity of the real estate itself.
3. Attract popularity, establish the unique image of the building itself and expand the reputation of the building itself.
4. Create a healthy and progressive community cultural image and enhance consumers' awareness and sense of belonging.
Third, the activity time:
Every Saturday afternoon from June 25th to July 30th 15: 00- 18: 00.
Practice time: June 25th-July16;
Competition time: July 23rd DD 30th.
Fourth, the venue
XX blue sky badminton court
Verb (abbreviation for verb) meeting schedule:
The main purpose of this activity is to let the participating owners really enjoy the benefits and happiness brought by community activities. Therefore, the practice time should be appropriately extended, so that owners and friends can fully communicate and have more opportunities to communicate with property and sales. The whole activity is mainly based on the practice stage, supplemented by the competition stage.
According to the convention that each venue can accommodate about 6 people in two hours, each venue can accommodate about 10 people in three hours.
According to the calculation of 180 people, only about half of them said that they can participate in the practice for free, and about 60% of them can actually participate in the practice, so it is basically enough to book six courses at a time in the practice stage.
It is estimated that the number of applicants is 60, and the ratio of male to female is about 3: 2, so there are about 36 men's singles and 24 women's singles.
First round elimination: men's singles need to play 18 games, and women's singles need to play 12 games;
The second round of elimination: men's singles need to play 9 games and women's singles need to play 6 games;
The third round of elimination: men's singles need to play 4 games and women's singles need to play 3 games;
The fourth round of elimination: men's singles need to play 2 games, and women's singles need to play 1 game;
Final: men's singles need to play 2 games, and women's singles need to play 1 game;
Then men's singles need to play 35 games and women's singles need to play 23 games.
According to the men's singles competition, it usually takes about half an hour, and the women's singles competition usually takes about 20 minutes.
Then the men's singles competition needs to take up 6 games/time.
Then the women's singles competition needs to take up 3 games/time.
The number of mixed doubles is small, which takes less time and is not counted for the time being.
* * * Need 18 games/time.
From the above analysis, we can draw the following timetable.
Competition schedule
Competition process, practice stage and competition stage
Time 6.25 7.2 7.9 7. 16 7.23 7.30
Field/Time 3 6 6 6 6 6
Capacity 30 60 60 60 60 60 60 60 60
The estimated cost is150 300 300 300 300 300 300 300 300.
Intransitive verb registration organization
6. 1 Registration
6. 1. 1 Registration time
June 10- July 15
6. 1.2 Notice of Sales Staff
Sales staff will inform the owners and prospective customers of the activity information by telephone, SMS, etc.
6. 1.3 community announcement
In places frequented by community residents, such as the sales department and Fengqing Street, use bulletin boards to release activity information.
6. 1.4 Website Forum
Publish activity information in popular website webmaster forum.
6.2 Identification and grouping of personnel
6.2. 1 Fill in the registration form of the badminton competition in XX Community, and make sure that the contestants include name, gender, age, room number, contact information, practice card number, property consultant, etc. And send the exercise card to the owner for organization.
6.2.2 Fill in the registration form of XX Community Badminton Competition, and confirm the number, name, gender, ID number, contact information, reporting matters, etc. of the participants.
Seven. Activity organization
7. 1 practice stage
7. 1. 1 inform the owner of the time and place of practice.
7. 1.2 The owner shall sign in at the designated place according to the signboard at the entrance of the venue.
7. 1.3 After the owner signs in, the staff will arrange the venue for practice. Owners of different venues can learn from each other, but the principle still exists ... >>
- Related articles
- What is the housing situation of Vanke Park and Great Lakes?
- What about Suzhou Yuanda Lihe Property Management Co., Ltd.?
- An article praising the maintenance worker
- 2020 funny yellow jokes
- Where is the 4th generation of Tianyang City in Qian 'an, Tangshan?
- Where is Benxi Fuxiang's home?
- Where is the address of Vientiane Yayuan in He Chun, Suzhou?
- The total investment is 37 billion! Tencent's global headquarters "Penguin Island" has finally arrived.
- What is the reason why Chongqing Nanping Golden Home is cheap?
- How about Jiangsu Tuoben Technology Co., Ltd.?