Job Recruitment Website - Property management company - Property staffing regulations and related contents

Property staffing regulations and related contents

Allocation principle of property service personnel

First, the labor quota of public affairs personnel.

1 and13 administrators of the residents' service center below 0.5 million square meters.

2,10.5 million square meters below the building inspection team, only set up a household service center; 10.5 million square meters of buildings. Every 50,000 square meters of building patrol group administrator, increase 1 person. For every 6,543,800+square meters of management staff in the residents' service center, it will increase by 1 person.

3. Management personnel allocation: 1.5 million square meters, supervisor 1 person, no class (group) length; 1 0.5 million square meters or more, with 1 supervisor (who can be the deputy manager of the management office), 1 monitor of the resident service center,1patrol class (group) leader. Two. Labor quota of security personnel

1, the monitoring area of each security guard on duty is 3000-3500 square meters.

2. There should be three entrances (three shifts) in the fully enclosed community.

3, patrol security each group (a group of two people) can monitor the area of about 50000 square meters.

4. There should be 3 people at each entrance and exit of the closed parking lot.

5, safety management personnel configuration standard:

(1) The configuration of security cadres below 300,000 square meters is1supervisor and 3 -4 squad leaders;

(2) More than 300,000 square meters can increase the number of team leaders, with an average of 50,000-80,000 square meters 1 team leader.

6. When the public security fire monitoring system has been set up in the intelligent community (building), the number of security guards can be appropriately reduced, but each fire security monitoring center should be equipped with at least 3 screen monitoring security guards.

7. Comprehensive labor quota of security personnel: every 2,000-2,500 square meters 1 person.

Three, mechanical and electrical maintenance personnel labor quota

1, 3 electricians are on duty in each high voltage distribution room.

2. Water conservancy project is equipped with 1 person per 654.38+10,000 square meters.

3. Equipped with central air conditioning 1 person per 65,438+10,000 square meters.

4. Elevator workers are equipped with 10 elevators 1 person.

5, maintenance electrician every 6.5438+10000 square meters configuration 3 people.

6, comprehensive maintenance man every 65438+ ten thousand square meters configuration 2 people.

7, project management personnel allocation standard:

(1) Less than 300,000 square meters,1supervisor, no team leader;

(2) More than 300,000-800,000 square meters, responsible for staffing 1 person, operating shift (group) 1 person, and maintaining monitor (group leader) 1 person.

(3) Over 800,000 square meters, 1 supervisor, 1 operation class (group), 1 electromechanical maintenance class (group), 1 comprehensive maintenance class (group) can be considered.

8. Comprehensive labor quota: every 65,438+10,000 square meters 10- 12 people.