Commencement disclosure process and matters needing attention. If you don't pay attention to these, you will suffer!

Commencement disclosure is a very important link in decoration. Before the house is renovated, the builders, users, designers and foremen communicate together to confirm the design of the house, discuss the needs of the owners together, and finally determine the renovation plan. So, what should I pay attention to when I start to disclose?

First, the site preparation before disclosure

1, notify the decoration owner, designer, project supervisor, project manager, person in charge of each type of work and the arrival time.

2. Preparation tools: oily marker, chalk, tape measure, etc.

3. Disclosure content: disclosure of drawings; Technical disclosure; Safety and civilized disclosure.

Second, the disclosure process

1, construction permit processing and posting

Residential areas need to apply for a construction permit from the property and pay a decoration deposit. Generally, the owner and the decoration company each give half, and the original price will be returned when the decoration reaches the property acceptance result. The designer explains the design scheme, decoration process requirements and matters needing attention to the person in charge of construction and project management, and the project supervisor coordinates all kinds of procedures.

2, water and electricity furniture positioning work

According to the design scheme and decoration requirements, determine the location of water, electricity and household appliances in advance. Hydropower positioning is related to the use of electrical appliances and sockets, as well as the installation of sanitary ware and gas equipment in the later period. Furniture positioning is also to reserve space for future installation work. Understand the usage and power consumption of household appliances on site, choose a reasonable hydropower implementation plan, and finally estimate the total price of hydropower construction.

3. Arrange the time for acceptance of materials at the site.

Pay attention to the acceptance work when the materials enter the site, and make sure to agree on the specific acceptance time with the decoration company and the supervisor in advance to avoid the quality problems of the materials entering the site.

4. Maintain the integrity of the articles to be used continuously, and explain the problems to Party A and Party B on the spot.

Care should be taken to preserve the integrity of the project. The owner should explain the items that need to be kept to the decoration company at the scene, and both parties should confirm whether there is any problem at the scene. If there are any additions or deletions, both parties need to explain clearly and sign on site for confirmation.

Three. Matters needing attention in commencement disclosure

1. Participants

Four people, including the owner, designer, project supervisor and construction director, should arrive at the construction site that day. The designer will explain the drawings in detail to the person in charge of construction and project management personnel to determine the feasibility of the drawings. The owner shall confirm the construction project. If there are special designs and projects, he should consult designers, foremen and supervisors so as to find unreasonable problems in time and avoid adding or subtracting projects later.

Step 2 end the oral agreement

Equipment and materials to be preserved in the construction site. Both parties to the contract shall register the details, quantity and protection requirements of these equipment. Oral agreement should be put an end to at the disclosure site, and all the contract terms that should be clear should be clearly expressed in writing. Some promises made by designers when talking about the scheme should also be presented in the form of words to avoid disputes in the future.

3. Confirm the items and equipment to be saved.

One of the important tasks in the construction site is to confirm which equipment or articles need to be kept by the owner. For example, if the owner does not intend to replace the new cabinet, it must be stated that the original cabinet should be kept; If the air conditioner is not going to be replaced, the quantity and protection should also be stated.

4. Check the problems existing in the website.

The second task to start the disclosure is to check the problems on the site together, because it is not surprising that there are such problems in the house. But at the beginning of the disclosure, we must check clearly and confirm which problems already exist, so that if the problems are caused by the construction party, we can find the corresponding responsible person. Without clear proof, disputes are prone to occur later.

5. Confirm process practice

After all, the presentation of the design scheme is relatively simple, and what we see is the final overall effect, but some specific technological practices in the construction process sometimes need to be confirmed. For example, how to deal with the wall foundation, scrape putty several times, brush wall paint several times, press wall tiles or floor tiles to press wall tiles and so on. If there are special requirements or the designer has a commitment, it should be indicated.

6. Relevant construction procedures.

Different places have different customs. Some people will have some commencement ceremonies before starting work, and some people will start work after sharpening their knives. In any case, the relevant procedures that need to be handled before the start of construction still need to be done. Party A and Party B go to the property or community management office to handle relevant documents, and the treaties and documents that may be signed in different regions and communities will be different. The property owner will review the owner's identity information, relevant qualifications provided by the decoration company and construction drawings. After the examination and approval, get the construction permit, and you can officially start construction. Remind that coordinating the relationship with the property is also a key to the smooth progress of the construction.