Job Recruitment Website - Property management company - What fees do I need to pay for the delivery of new houses?
What fees do I need to pay for the delivery of new houses?
1, deed tax: the deed tax of villas (including single-family houses and conjoined houses) in the central city is levied at 4%; The standard for ordinary housing is 1.5%. The contract for an individual to purchase an ordinary house of 90 square meters or less for the first time is levied at 1%.
2. Housing maintenance fund: the housing maintenance fund shall be deposited according to the standard of 2%, and the non-residential maintenance fund shall be deposited according to the standard of 1%.
3, commercial housing (including affordable housing and residential areas of non-residential and residential areas connected with a single residential structure of non-residential) maintenance fund payment standards are:
Brick-concrete structure residence -49 yuan/m2
Residential building without elevator frame structure -55 yuan/m2
14 floor and below (including 14 floor) residential building with elevator frame structure 6 1 yuan /m2.
/KLOC-Residential building with elevator frame structure with 0/5th floor or above (including15th floor) 73 yuan/m2.
4. Transaction cost: residential 3 yuan/m2; Non-residential 1 1 yuan/square meter.
5. Housing registration fee: residential 80 yuan/set; Non-residential 550 yuan/piece.
Extended data:
Matters needing attention in handing over the house are as follows:
First of all, the wall
1, check whether the wall is cracked.
2, check whether there is an empty drum on the wall, knock on the wall with a Xiao Mu hammer or other things, knock on the empty drum when the voice is not true, it is easy to hear. Mark it well and fill it with putty when decorating.
3. Check whether the putty on the wall is waterproof. You can bring a bottle of mineral water, splash water on the wall and touch it with your hands to see if there is mud on your hands. If not, it proves that the waterproof putty on the wall is qualified.
Second, the roof.
1. Check the roof for cracks.
2. Check whether the corner line of Yin and Yang on the roof and wall is horizontal. If not, in the future decoration, plaster gypsum should be used to find a lower level, and then water-resistant putty should be used for leveling.
Third, the ground.
1, check whether the ground is flat or not.
2. Check whether there are cracks and sand prevention: whether there are sand grains when rubbing the ground with your feet. This problem will occur if the mortar ratio or cement quality is unqualified and the mixing is uneven.
References:
Baidu encyclopedia-new house tax payment
- Related articles
- Decorative Effect of the Living Room of the House ¡ª¡ª Taking the New Chinese Decoration as an Example
- How to get to the 4th floor of Hongyang Square Home Furnishing Hall on Da Qiao North Road?
- What are the main shortcomings of the first phase of Fengze Mountain Villa? Is it difficult to park?
- How about the Job Lanting Plate of Country Garden in Yancheng, Jiangsu?
- How about the surrounding facilities of Dalian Happiness E Home (Phase I to Phase V)?
- Address of New Oriental study abroad institution
- Which community does Dina Apartment in Dongguan Dongcheng Xinghe Legend belong to?
- Where is Jiangyin Capital Garden?
- Where is the address of Liuzhou Jinkebo Cuijiangtian?
- Eight Summaries of Winter Solstice Package in Jiaozhou Community in 2022