1. Application for commencement: Before decoration construction, the owner's consent must be obtained before entering the site for decoration construction.
Fire examination and approval: office fire safety is a very important link, which can only be completed through relevant audit procedures. Here is a detailed introduction to the relevant content:
I. Application for commencement of construction
Before the renovation of office buildings and commercial buildings, you must go through the relevant formalities with the property department before construction. Customers and decoration companies can go to the property company to go through the formalities, or the decoration company can prepare relevant materials, which will be negotiated by customers and property parties. The following materials should be prepared before the declaration:
1, property ownership certificate, and the non-owner shall issue the owner's power of attorney;
2, hired decoration construction team qualification certificate, project leader's ID card, business license and other copies; Simple decoration, the owner must issue a decoration guarantee, do not need qualification certificates and other materials;
3, building plan, construction plan, elevation, water and electricity construction drawings and other information.
4. After the information provided is submitted to the management office for review, the owner or the owner's authorized person shall fill in the decoration project declaration form.
5. The decoration engineering application form and building materials shall be submitted to the engineering and technical personnel of the management office for examination and approval, and then the decoration shall be approved by the director of the management office.
6, after approval, decoration construction director and management office signed a decoration responsibility.
7. Decoration management service fee and deposit: the management service fee shall be paid by the construction unit to the management office according to the 2 yuan per square meter; The deposit shall be paid by the construction unit to the management office according to the standard of per square meter 10 yuan (the deposit can be fully refunded after three months of decoration acceptance, without any problems left over from the project);
8. The management office shall issue a decoration start-up sheet and a decoration responsibility card, and the construction unit shall handle the temporary pass for the construction personnel before carrying out the construction.
Second, the fire approval
1, information required for fire control examination and approval (1) "Shanghai Construction Project Construction Site Fire Control Audit Declaration Form"; (2) Review opinions on fire protection design of building engineering; (three) fire safety measures and the system of using fire and electricity; (4) Fire safety agreement signed by Party A and Party B; (5) Construction organization design scheme (in the form of general construction plan and text, indicate the fire lane and fire fighting equipment). 2. Fire control approval procedures 1. First, fill in the Declaration Form for Fire Control Audit of Building Interior Decoration Design and the Declaration Form for Fire Control Audit of Shanghai Construction Site, and remember that the applicant should be the construction unit, not the construction unit. It is necessary for the construction unit to affix its official seal and present the rental agreement or purchase agreement. If the construction unit goes,
2. The contents filled in the declaration form are basically the main building materials, such as partition materials/floor materials/top materials.
3. It is necessary to prepare a copy of the drawings for the overall fire control acceptance of the place (generally available in the property management office).
4. It is necessary to prepare the plan, electrical diagram and fire-fighting reconstruction diagram of the specific construction site (the fire-fighting facilities can be explained in the remarks). The above drawings need to be blueprinted and stamped by units with design qualification (such as architectural design institute).
5. The local fire brigade will inspect the site within 10 working days and put forward written opinions. If it agrees, it can start working; If not, you may need to modify the renovation plan.
6. Two weeks before the renovation, you can submit a declaration form for fire control acceptance of construction projects, and the contents of the declaration form are basically the same as those of the declaration form. Generally, the fire brigade will randomly check 2~3 kinds of building materials for testing (PVC pipes, blockboards, curtains, etc.). Most likely to be drawn).
7. If they pass the examination, at least 2 people from the construction unit shall participate in the fire protection training (compulsory).
8. After the project is completed, the fire brigade will go to the site for inspection, and some rectification opinions will be listed. Just do it. Then, it will send a fire inspection and approval letter to the construction unit. The above procedures seem cumbersome, but for the experienced project manager of the decoration company, it can be said that there is a special person responsible for assisting the customer to handle this series of procedures, which saves the trouble for the customer to handle it personally.
- Related articles
- Ten worst buildings in Shenbei, Shenyang
- Where is the address of Zhengzhou Merchants Park 1872?
- What is the price of Zhoukou Country Garden?
- What is the current price of Tai 'an Lijing Garden? Why is there no sales phone? Do you have a ready-made house?
- Basic situation of a famous huating in south China.
- Details of Clifford Watertown Building
Development cycle: * * * 3, 1 is under development.
Total households: 1500 households
Floor information: 18 Building 12 Floor
Floor area
- When will the house be delivered by Zhongjiao Binhu in Yajun, Zhaoqing?
- Summary of epidemic prevention monthly work
- What services do you dream about property fees?
- What is the price of Guangzhou University Impression Real Estate and what are its main shortcomings?