How long does it take to test the waterproof water in the bathroom?

It takes at least two days, or 48 hours, to test the waterproof water in the bathroom. After the waterproof layer is completely dried, water injection test should be carried out, and the water injection height is about 20cm. After waiting for 48 hours, check the test results. It should be noted that before testing the water, you must inform the property and contact the upstairs and downstairs owners in order to observe the test results.

Specification and process of toilet waterproof construction 1, confirmation of construction address and content: before toilet waterproof construction, the construction address must be confirmed to the contractor, and the construction content must be clarified to avoid unnecessary construction.

2. Placement of materials on the construction site: Materials and tools should be properly placed after entering the site, which will not affect the construction and traffic of other types of work.

3. Owner determines the construction scope: Before entering the site, please ask the owner to determine the construction scope and measure the construction area in time for the owner to confirm and sign.

4. Cleaning of the construction site: clean up the garbage, sundries and oil stains on the site (add a layer of waterproof mortar if a large area cannot be removed) so as to put the garbage into the bag in time. If no garbage bags are prepared at the site, the cleaned sundries should be piled up neatly. The stacking point should be more than 2 meters away from the door of waterproof room.

5. Inspection before site cleaning: Before site cleaning, check whether the sewer pipe in the room is unobstructed. If there are any abnormal situations such as blockage, slowness and blockage, report to the owner and the company in time.

6. Cleaning: Check and ensure that the construction details (wall materials, solid floor hollows, corners and internal corners, threading pipes, wall holes, construction pipe grooves, flue, floor drain and drainage pipe intersections) are not missed.

7. Cleaning the details: cleaning the details, removing the empty drum layer, removing the bumps (local small areas) that affect the tiling, repairing the incomplete wall surface (local small areas can be repaired), and chiseling off the nozzle.

8. Construction details first: Construction details first, and seal the roots of all drainage pipes, holes and through-wall pipes.

9. Wash the ground and clean up the accumulated water: Wash the ground and clean up the accumulated water in time. Flushing water shall not flow out of the construction scope to prevent leakage from damaging the downstairs. Make sure there are no floating dust, sand and debris. After cleaning the walls and floors, flush the pipes with water to prevent the pipes from being blocked.

10. Construction principle: for large-scale construction, the construction shall be carried out according to the principle that the wall is constructed first and then the ground is constructed, and there shall be no construction omissions.

1 1, door treatment along the body: the door is treated along the body. According to the existing materials on site, a water stop is added along the body, which meets the test conditions (there is water on the toilet floor) and it is best not to affect the threshold laying.

12. construction completion: finally, check whether there are any defects in the whole waterproof layer construction to ensure that there are no omissions in the construction process.

13. Cleaning tools: In principle, clean water should not be spilled in the room to prevent it from leaking into the downstairs room.

14. Leave the site: Before leaving the site, if there are no other construction workers, the water diversion valve, main water valve, main power switch, doors and windows must be closed.