Job Recruitment Website - Property management company - What are the principles of flood control work?

What are the principles of flood control work?

"Safety first, always be vigilant, save for a rainy day and do your best to rescue". In other words, every year before the flood season and during the flood season, we should base ourselves on the early arrival of water and flood season, do a good job in all preparations for flood control, nip in the bud, and minimize the losses caused by floods.

A, in order to prevent or mitigate flood disasters, flood control work carried out in the flood season, said the flood control work.

The main work includes: patrol and defense of flood control works such as dikes and dams, forecast of rainstorm weather and water regime, dispatching and using flood control facilities such as flood storage, flood discharge, flood diversion and flood detention, taking temporary emergency measures when abnormal situations occur, and carrying out emergency rescue and flood control after finding dangerous situations.

Flood control work is divided into three stages: pre-flood preparation, flood season work and post-flood inspection and summary.

Second, the preparation before the flood season:

(1) Organize preparation. Establish and improve the flood control command system and the flood control rescue team.

(2) Establish and improve the hydrometeorological forecast network, and improve the communication facilities, so as to timely forecast and transmit rain, water regime, river regime and engineering conditions. During the flood season.

③ Material preparation. Raise and reserve materials for flood control and emergency rescue.

④ Urban flood control preparation. Large and medium-sized cities with dike protection often have water pipes, drainage pipes, transmission lines, traffic intersections and drainage ditches crossing the dike, which should be closed in time and prepared for defense. Mountain towns should be prepared to prevent mountain torrents and mudslides.

⑤ Provide technical training for key personnel of flood control and emergency rescue teams to improve the technical level of flood control and emergency rescue.

Three, flood control work plan

1, use:

In order to establish and improve the early warning and emergency response system for public emergencies in property management, and to ensure that the property company can effectively and orderly do a good job in flood control and disaster relief in the event of major floods, this plan is formulated in accordance with the requirements of the higher authorities and company leaders, combined with the actual situation of our company, in order to implement the emergency rescue and disaster relief work and ensure the safe flood season this year.

2. Guiding ideology

Conscientiously implement the spirit of the national, city and county flood control work conference, adhere to Scientific Outlook on Development's and people-oriented ideas, actively defend against flood disasters, implement the working policy of "safety first, prevention first, standing by and doing all-out rescue", and build a harmonious society; Unified leadership, careful deployment, coordinated action, hierarchical management, clear division of labor, scientific scheduling, further strengthen flood control responsibility, earnestly grasp all aspects of flood control work, improve and implement various flood control plans, strengthen flood monitoring and early warning and forecasting, improve the comprehensive ability of flood control and waterlogging prevention, and minimize the losses caused by flood disasters to families and companies.

3. Main tasks

1), implement the responsibility system. Conscientiously implement the flood control responsibility system with the project manager responsibility system as the main content, improve the rules and regulations, clarify the job responsibilities, and implement the responsibilities to people.

2) Organize the formulation and implementation of emergency plans for flood control. Combined with the actual situation of various departments and projects, fully foresee possible problems, and scientifically and reasonably formulate emergency plans for flood control and flood fighting.

3) The flood control materials of all departments and projects shall be in place, and sufficient flood control materials shall be provided, with fixed positioning, and special personnel shall be responsible for management.

4), each project do someone on duty 24 hours a day, and there is a leadership shift, the project manager responsibility system. Ensure the smooth flow of information and properly handle emergencies.

legal ground

People's Republic of China (PRC) flood control law

Article 2 Flood control work shall follow the principles of overall planning, overall consideration, giving priority to prevention, comprehensive management and subordinating local interests to overall interests.

Article 3 The construction of flood control works and facilities shall be incorporated into the national economic and social development plan.

Flood control expenses shall be raised in accordance with the principle of combining government investment with reasonable responsibility of beneficiaries.