Should the decoration be tiled or painted first?
Generally speaking, the decoration engineering construction sequence is:
Hydropower transformation, this part is a hidden project in the basic decoration, we must choose good products, because hydropower is what we need most in our daily life.
Secondary waterproofing, many owners have asked me, developers have done waterproof before, do you still have to do it when decorating? I told you to do it! And the closed water experiment must be done for more than 24 hours! Because waterproof is really important, water leakage is very troublesome!
The bricklayer's construction is bricklaying, so it is very important to deal with the details of bricklayer, such as floor drain and chamfering. Everyone must pay attention to it!
The carpenter's ceiling is the gypsum board ceiling of the restaurant. This part can be connected before or after the bricklayer works.
Wall construction is to paint the wall, and wall construction pays attention to ground protection. When the wall construction is over, the basic decoration construction is over, and then the custom installation is started!
Finally, the installation of furniture and electrical appliances.
After the renovation of the new house is completed, it is best to ventilate for three months before moving in. After the renovation of the new house, we take ventilation to remove the smell of formaldehyde in the new house. The stronger the formaldehyde smell in the new house, the longer the ventilation time.
Extended data:
House decoration refers to digging up walls, floors, moving windows, removing load-bearing or non-load-bearing structures, adding partition structures, improving the appearance of houses and decorating indoor layout.
Decoration is divided into indoor decoration and outdoor decoration. Outdoor decoration refers to the outdoor decoration of houses. Interior decoration refers to the architectural activities in which the owner or user of the house (hereinafter referred to as the decoration person) decorates the interior of the house after the house is completed and accepted. The Ministry of Construction promulgated the "Administrative Measures for Indoor Residential Decoration in China", which clearly stipulated the prohibited and permitted behaviors of indoor decoration.
Generally speaking, the decoration steps and cost settlement methods will have the following six aspects:
Design: When decorating, you must first determine a project, customize one or several suitable schemes, and choose the grade you can bear, high-grade, middle-grade or low-grade. Design fees, including planning, generally account for 5%-20% of the whole decoration cost. The planning and design process needs reasonable layout, appropriate allocation of funds, and don't let the later construction reuse labor and materials.
Materials: After the decoration scheme is completed, materials will be selected according to the design. Decoration materials are already a product assembly line, and decoration has become a model. It's actually a combination. In order to find the right price, we need to visit several building materials markets to find the best combination of materials and prices. Materials are the largest part of home improvement expenses, and material adulteration also occurs from time to time. Therefore, we should be as cautious as possible in the selection process, don't buy some products without brands, and avoid parallel imports.
Bargaining: after finding the right and favorite materials, you need to find out the price. Merchants often offer quite high prices and claim that they are very cheap. At this time, you can take out the approximate market price and its bargaining price that you have proved in the previous step and explore its reserve price.
Determine the price and sign the contract: after determining the approximate cost of design planning and materials, you can contact some decorators. It is best to consult some professionals first, introduce more reliable decorators and sign contracts with them. The contents of the contract shall include the materials used, the designated brand and the price agreed by both parties. The more specific, the better, to avoid future disputes.
Total budget: on the basis of design and asking price, budget the expenses of the whole decoration process together with the decorator, including design fee, material fee and construction fee.
Time preparation: After all, decoration is not a small expense, so we need to leave enough time in advance to put the design, materials, asking price and budget in place. The more fully prepared in the early stage, the faster the decoration can be.
Save expenses, settle the budget and final accounts, reduce unnecessary expenses, refer to the original project list recording process, so as to clean up the increase or decrease projects in the final accounts. Decoration companies generally have fixed outlets, which can be selected with reference to the above prices. It is best not to invite construction workers directly, which may save money on the surface and may actually cause greater construction losses.
References:
Baidu encyclopedia-house decoration
- Previous article:How many years has the property right of Rugao Longyou Yunjinyuan been?
- Next article:How about Tian Yue Bay Villa in Jindi?
- Related articles
- Announcement of recruitment of supernumerary personnel by Shanghang County Water Conservancy Bureau in Longyan City, Fujian Province in 2020
- 2022 Shashi District Epidemic Closed Area+Control Area+Prevention Area (Shapingba District Epidemic Prevention Center)
- What is the telephone number of the marketing center of Chuanshan Mansion in Hengyang?
- Is it legal to pay the property fee when the office building is here?
- Where is the address of Intime City in Panzhihua?
- Is the house in Shang Xian, Zejing, Liaocheng decorated?
- The preliminary time and rematch time of Mid-Autumn Festival on both sides of the Taiwan Strait in 2020; Ways to participate in Mid-Autumn Festival on both sides of the Taiwan Strait
- How about Hanzhong Heshun Property Co., Ltd.?
- Dream of the omen of green orange
- What are the registered properties of Hangzhou Yaohao in August?