Share the whole flow chart of decoration! ! !
What did the owner do in the early stage of construction:
Apply for a decoration permit
Print decorative notice stickers.
At the door of the unit (notify the neighbors)
Required information: ID card, water and electricity diagram of decoration and relevant information.
Note: It is recommended to install the decoration permit by yourself, and the decoration company can provide relevant decoration materials.
Hard loading stage
I. Demolition stage (7-8 days)
What should a decoration company do:
Removal of finished product protection (doors, windows, gas meters, etc.). )
Smash the wall
Shovel wall ash
lay bricks
Brush the wall firmly.
Measure the size of doors and windows
Remove rubbish
What did the owner do:
1. Decoration disclosure
2. Temporary toilet bathroom
3. Determine the style of cabinets/doors and windows/range hoods/water heaters in advance.
4. Book central air conditioning/fresh air/floor heating
Precautions:
1. On the first day of construction, the owner asked the project manager/designer/foreman/supervisor to confirm before construction.
2. Do a good job in floor drain protection to prevent construction waste from blocking the sewer.
3. It is necessary to coordinate the construction sequence of air conditioning, floor heating and fresh air with the contractor in advance.
Second, hydropower transformation stage (about 10 day)
What should a decoration company do:
Water and electricity disclosure
Circuit laying
Waterway laying
Embedded faucet for wall drainage and launching reconstruction
Embedded device access port
Hydropower position inspection
The amount of water and electricity is calculated and the balcony windows are sealed.
Central air conditioning building
Xinfeng construction
Floor heating construction
Made by the owner: 1. Buy tiles all over the house.
2. Buy threshold and sill stones
3. Learn about books customized for the whole house
4. Buy a wooden floor (if you choose a bedroom)
5. Find an air conditioner drill and drill holes in advance (wall-mounted air conditioner).
Precautions:
1. After the hydropower construction is completed, keep a statistical table of the number and size requirements of switches, sockets and downlights, so as to facilitate the later purchase of related products.
2. During the hydropower period, buy a floor drain in advance, and online shopping is relatively cheap.
3. The owner/designer/supervisor/foreman shall be present at the same time when the water and electricity position is accepted.
Third, the bricklayer stage (about 30 days)
What should a decoration company do:
Existential tile
The exposure of bricklayers
New wall or partition
Water pipes and flues
backfill
Ground leveling
Waterproof structure
Waterproof acceptance and photographing
floor tile
Install lintel
Install floor drain
Whole house custom ruler
Ceramic tile protection
Made by the owner: 1. Buy radiator.
Buy a water heater
3. Confirm the floor thickness
4. Indoor wooden door/sliding door/aluminum door measurement
Precautions:
The main keel spacing is less than 1m, the auxiliary keel spacing is less than 40cm, the lifting point spacing is less than 1m, the main keel is installed when the ceiling width exceeds 70cm, and the side keel is fixed with light steel keel and expansion screws, and the spacing is less than 60cm. There shall be no less than 2 rivets for the side keel and the auxiliary keel, and the main keel shall be in a straight line.
V. Oil production stage (about 25 days)
What should a decoration company do:
Wall treatment
Grinding acceptance
Color mixing and painting
The oil workers have completed the acceptance.
Time node:
Gypsum leveling for 2-3 days.
Blow putty 2-3 times for 5-7 days.
The putty is dried for 5-7 days.
Polishing putty for 2-3 days.
Apply primer on both sides of the top coat for 2-5 days.
→ What did the owner do?
1. Buy furniture/appliances/lamps.
Step 2 buy a switch panel
Step 3 buy hardware pendants
Step 4 buy ceramic tiles with beautiful seams
5. Buy integrated ceiling
Step 6 buy bathroom products
Installation stage of intransitive verbs (about 15 days)
What should a decoration company do:
Installation of water heater
Ceiling installation in kitchen and bathroom
Panel installation of switch lamp
Hardware installation
Installation of cupboard garderobe
Wooden door installation
Wall repair
Sanitary ware installation
Shower room installation
Floor installation
Wallpaper paving
Curtain installation
Recycling and cleaning
What did the owner do:
1. After the installation, please ask the decoration company to accept it together, and repair it if necessary.
2. Contact the wooden floor to make an appointment for installation after hard installation.
3. Excess materials should be returned.
4. Make an appointment for land reclamation and cleaning time
5. Supervise the installation of all kinds of furniture and household appliances (some projects are not in the installation and decoration company, so it is necessary to find another installation master to install them, and the installation fee of the decoration company should be specified before installation).
Precautions:
Hardware, switch panel installation, cleaning, land reclamation, some decoration companies include, some separate charges. Please confirm with the decoration company in advance and consult the designer.
- Related articles
- Layout requirements and water consumption of fire hydrant water supply system?
- Shanghai Yagu International Travel Service Co., Ltd. Recruitment information, how about Shanghai Yagu International Travel Service Co., Ltd.
- Is there a subway in Hanyang China Railway Century Jinqiao?
- What is the job of the monitor of the property company?
- Business visit letter 20 19
- Where can I get the invoice for the loan parking space?
- Evergrande real estate is really rubbish.
- Where is the address of Yinchuan Minsheng Yalanyuan?
- Where can I get the elevator operation certificate in Luzhou City?
- Are Xingtai Jinsha River workers tired? What is the salary?