Guide to the whole process of decoration! ! !

Share the whole flow chart of decoration! ! !

What did the owner do in the early stage of construction:

Apply for a decoration permit

Print decorative notice stickers.

At the door of the unit (notify the neighbors)

Required information: ID card, water and electricity diagram of decoration and relevant information.

Note: It is recommended to install the decoration permit by yourself, and the decoration company can provide relevant decoration materials.

Hard loading stage

I. Demolition stage (7-8 days)

What should a decoration company do:

Removal of finished product protection (doors, windows, gas meters, etc.). )

Smash the wall

Shovel wall ash

lay bricks

Brush the wall firmly.

Measure the size of doors and windows

Remove rubbish

What did the owner do:

1. Decoration disclosure

2. Temporary toilet bathroom

3. Determine the style of cabinets/doors and windows/range hoods/water heaters in advance.

4. Book central air conditioning/fresh air/floor heating

Precautions:

1. On the first day of construction, the owner asked the project manager/designer/foreman/supervisor to confirm before construction.

2. Do a good job in floor drain protection to prevent construction waste from blocking the sewer.

3. It is necessary to coordinate the construction sequence of air conditioning, floor heating and fresh air with the contractor in advance.

Second, hydropower transformation stage (about 10 day)

What should a decoration company do:

Water and electricity disclosure

Circuit laying

Waterway laying

Embedded faucet for wall drainage and launching reconstruction

Embedded device access port

Hydropower position inspection

The amount of water and electricity is calculated and the balcony windows are sealed.

Central air conditioning building

Xinfeng construction

Floor heating construction

Made by the owner: 1. Buy tiles all over the house.

2. Buy threshold and sill stones

3. Learn about books customized for the whole house

4. Buy a wooden floor (if you choose a bedroom)

5. Find an air conditioner drill and drill holes in advance (wall-mounted air conditioner).

Precautions:

1. After the hydropower construction is completed, keep a statistical table of the number and size requirements of switches, sockets and downlights, so as to facilitate the later purchase of related products.

2. During the hydropower period, buy a floor drain in advance, and online shopping is relatively cheap.

3. The owner/designer/supervisor/foreman shall be present at the same time when the water and electricity position is accepted.

Third, the bricklayer stage (about 30 days)

What should a decoration company do:

Existential tile

The exposure of bricklayers

New wall or partition

Water pipes and flues

backfill

Ground leveling

Waterproof structure

Waterproof acceptance and photographing

floor tile

Install lintel

Install floor drain

Whole house custom ruler

Ceramic tile protection

Made by the owner: 1. Buy radiator.

Buy a water heater

3. Confirm the floor thickness

4. Indoor wooden door/sliding door/aluminum door measurement

Precautions:

The main keel spacing is less than 1m, the auxiliary keel spacing is less than 40cm, the lifting point spacing is less than 1m, the main keel is installed when the ceiling width exceeds 70cm, and the side keel is fixed with light steel keel and expansion screws, and the spacing is less than 60cm. There shall be no less than 2 rivets for the side keel and the auxiliary keel, and the main keel shall be in a straight line.

V. Oil production stage (about 25 days)

What should a decoration company do:

Wall treatment

Grinding acceptance

Color mixing and painting

The oil workers have completed the acceptance.

Time node:

Gypsum leveling for 2-3 days.

Blow putty 2-3 times for 5-7 days.

The putty is dried for 5-7 days.

Polishing putty for 2-3 days.

Apply primer on both sides of the top coat for 2-5 days.

→ What did the owner do?

1. Buy furniture/appliances/lamps.

Step 2 buy a switch panel

Step 3 buy hardware pendants

Step 4 buy ceramic tiles with beautiful seams

5. Buy integrated ceiling

Step 6 buy bathroom products

Installation stage of intransitive verbs (about 15 days)

What should a decoration company do:

Installation of water heater

Ceiling installation in kitchen and bathroom

Panel installation of switch lamp

Hardware installation

Installation of cupboard garderobe

Wooden door installation

Wall repair

Sanitary ware installation

Shower room installation

Floor installation

Wallpaper paving

Curtain installation

Recycling and cleaning

What did the owner do:

1. After the installation, please ask the decoration company to accept it together, and repair it if necessary.

2. Contact the wooden floor to make an appointment for installation after hard installation.

3. Excess materials should be returned.

4. Make an appointment for land reclamation and cleaning time

5. Supervise the installation of all kinds of furniture and household appliances (some projects are not in the installation and decoration company, so it is necessary to find another installation master to install them, and the installation fee of the decoration company should be specified before installation).

Precautions:

Hardware, switch panel installation, cleaning, land reclamation, some decoration companies include, some separate charges. Please confirm with the decoration company in advance and consult the designer.