Job Recruitment Website - Property management company - 3 model unit survey report

3 model unit survey report

The concept of investigation report has broad sense and narrow sense. Broadly speaking, investigation report refers to the personal investigation activities conducted by the author according to certain scientific standards in order to understand the basic situation of a certain field or obtain scientific data or evidence of a scientific research task, and articles written on this basis, such as investigation notes, investigation diaries, some academic reports, etc., which are collectively called investigation reports. This is an important applied writing style. This article is a sample report of the unit inspection organized by me, for reference only.

Article 1 of the model unit inspection report:

According to the arrangement of the municipal party Committee and the headquarters, we visited the leading group of XX unit and its members on XX, XX, 20XX, and now we report the relevant situation as follows:

First, the main achievements and problems of the team

Main achievements: 1, team unity, full of vigor and strong fighting capacity. At present, there are five members of the leadership team of XX Bureau, including the director 1 person, the deputy director, and the supernumerary 1 person. First, every member of the team can unite sincerely, work hard, have strong cohesion and execution, and can better implement all the work. Second, the style of work is democratic, and major issues are decided by the collective discussion of the team, and individualism is not allowed. A word? . Third, the leadership has a clear division of labor, and the responsibility lies with people. The monitor can know people and be good at their duties, give full play to their strengths and fully mobilize the enthusiasm and creativity of cadres.

2. New breakthroughs have been made in all work. First, accelerate the promotion of key projects; Second, new achievements have been made in attracting investment; Third, increase tourism propaganda; The fourth is to strengthen team building; ? .

(2) Existing problems:

1, the cooperation and unity among individual teams need to be strengthened; The construction of reserve cadres needs to be strengthened; 3. Work style needs to be further improved.

Second, the basic situation of the team members

Third, the evaluation of democracy

Statistical table of democratic evaluation of members of the leadership team of XX Bureau

(Ticket issuance and ticket collection are all valid tickets)

Four. Inspection opinion

(According to the number of posts, the age structure of the team, the combat effectiveness of the team, etc. , put forward the inspection opinions on team equipment and team building. )

?

***XX Municipal Party Committee Organization Department

20xx year x month x day

Article 2 of the model unit inspection report:

Purpose of investigation:

In order to seek the best general contractor for the construction project of Block 2 in Lido Garden E, the enterprise qualification, enterprise nature, financial strength, enterprise reputation, company philosophy, management mode, construction quality, bidding site and cooperation of each construction unit were investigated. At the beginning of this project, it is set as the basement, with 19 floors above ground and a construction area of 654.38+500,000 m2. Initially consider setting up two blocks. Through investigation and analysis, the construction unit is comprehensively evaluated, which provides detailed evaluation basis and alternative scope for the general contractor of Lido Garden E to finally choose the best construction unit.

Second, the inspection process:

1, set up an investigation team and make an investigation plan. The members of the investigation team are composed of relevant personnel from the Engineering Department and are scheduled to be completed before September 5, xx. Be prepared before the inspection.

2. Check the first half-day reservation.

3, the construction site inspection.

4. Company inspection.

5. Inspection time: August xx 15? September 5, xx.

6. Investigation contents: enterprise qualification, enterprise nature, financial strength, enterprise reputation, company concept, management mode, construction quality, standard chemical site, cooperation, etc.

7. Location: Chengdu.

8. Members of investigation team: Ni,,, Yang Huijie.

Third, the investigation:

(I) China Construction Fifth Division Third Construction Co., Ltd.

On the afternoon of August 15, xx, the investigation team visited the Third Construction Co., Ltd. of China Construction Fifth Division.

1, able to provide complete business license, tax registration certificate, safety production license, enterprise performance and other related information, with good reputation, state-owned enterprises.

2. Qualification: special grade for general contracting of housing construction projects.

3. No experience in cooperating with our company.

4. The scale of the company is relatively large, with more than 100 employees in Sichuan Branch. The company has a very perfect quality management system. The company appoints the main project manager, and the company regularly inspects the project at different levels. The company has subordinate installation branches.

5. The investigation project is Jinjiang International, which is a project under construction and is in the main construction stage. The owner is Sichuan Investment Company, 8234 1㎡, 33rd floor. Excellent construction quality, safe and civilized site, standardization of chemical field, striving for Luban Award and national high-quality structural engineering, general contracting of civil engineering and hydropower, innovative floor construction technology, reasonable construction technology and living area layout, in line with standardization requirements.

6. The general manager of the company came over. At present, the company is mainly engaged in government projects. The company has strong brand awareness, strong willingness to cooperate and sufficient preparation materials. The company appoints the main management personnel of the project department, and the labor service company is finally determined by the company. The labor service is mainly Chongqing team, and the localization adaptability is slightly insufficient. The three-level and two-level fees of this project will not drop, and the planned investment is100000 yuan.

7. The company plans to appoint Guang Cai as the project manager. The project manager has a general reputation, no projects under construction, experience in Tianfu Cup and provincial standard chemical industry, and strong technical force in the project department. The representative projects he manages are:

(1) China TEPCO Company Technology Center, with a construction area of 35366m2, 10+ 1 floor, with a project cost of 8 1.56 million yuan, XX Tianfu Cup, a quality project in Chengdu, and a standard chemical site in XX province;

(2) Building No.5 of Jinglan Peninsula Phase II, 38,000 ㎡, 26 floors, with a project cost of 40 million yuan.

(2) Sichuan Hongda Construction Engineering Co., Ltd.

On the afternoon of August 18, xx, the investigation team visited Sichuan Hongda Construction Engineering Co., Ltd. ..

1. is a limited liability company that can provide complete business license, tax registration certificate, safety production license, enterprise performance and other related materials.

2. Qualification: Grade I general contracting of housing construction projects.

3. No experience in cooperating with our company.

4. The company is small in scale and restructured from the former Provincial University of Construction Workers, with weak brand awareness. The company implements the project manager responsibility system, and the project manager designates the labor service company, so the company is lax in project management.

5. The investigation project is Huigu Software Base, which is under construction by the company. It is in the construction stage of the main floor, with an area of 50000m2, 1 1+ 1 floor. The construction quality is average, the site safety and civilized construction is poor, the civil works and water and electricity are generally contracted, and the layout of the living quarters is messy.

6. The chief engineer of the company is in contact and has a strong willingness to cooperate. The third-class and second-class fees of this project can be reduced, and it is planned to invest 5 million yuan.

7. The company plans to appoint Deng Guangming as the project manager. Cheng Huigu, who is under construction, has no experience in creating cups, high-quality structural engineering and standardized engineering, and the technical strength of the project department is average. The representative projects he manages are:

(1) China Resources emerald city Phase III townhouse, with a construction area of 40,000m2, with one basement and four to seven floors above ground;

(2) Hongdu is a beautiful river in 13+ 1 building.

(3) Chengdu Fifth Construction Engineering Co., Ltd.

On the afternoon of August 2 1 xx, the investigation team visited Chengdu Fifth Construction Engineering Co., Ltd.

1, able to provide complete business license, tax registration certificate, safety production license, enterprise performance and other related information, with good reputation, state-owned enterprises.

2. Qualification: Grade I general contracting of housing construction projects.

3. Experience in cooperation with our company, Qingyang Urban and Rural Wish Garden Project. .

This company is very large, with more than 600 managers. The company has a perfect quality management system. The company appoints the main project manager, and the labor service company is finally determined by the company. The group company has its own mixing station and rental station. The company regularly carries out various inspections on the project, and implements dual management of quality and safety companies and projects. The company has subordinate installation branches.

5. The investigation project is Hope Garden, a project under construction in this company, which is located on the third floor and is in the main construction stage. The owner is Qingyang urban and rural area, with an area of 40,000m2, 1 1+ 1 floor. The construction quality is good, the site is safe and civilized, the civil works and water and electricity are contracted, and the living quarters are arranged reasonably, which meets the requirements of standardization. The dormitory of migrant workers is equipped with spray cooling measures, and the construction site is equipped with.

6. The vice president in charge of the operation of the company contacted him, and he had a strong willingness to cooperate. The third-class and second-class fees of this project can be reduced, and the planned investment is 8 million yuan.

7. The company plans to appoint Wang Lifu as the project manager. His social reputation is average and he has no experience in making cups. Xx reflects that the project of Lotus was completed in June, and the technical strength of the project department is average. Representative projects managed by the company are:

(1) Spring Festival, 14+2 floor, 2 1000 m2, provincial standard chemical site;

(2) Yingri Lotus Residential Area, 23+ 1 floor, 80,000 square meters.

(IV) Chengdu Sixth Construction Engineering Co., Ltd.

On the afternoon of August 22nd, xx, the investigation team visited Chengdu Sixth Construction Engineering Co., Ltd. ..

1, able to provide complete business license, tax registration certificate, safety production license, enterprise performance and other related information, with good reputation, state-owned enterprises.

Tianfu believed in Jiangdong project, cooperated with our company, and terminated the contract amicably due to scheme change.

This company is very large, with more than 600 managers. The company has a perfect quality management system. The company appoints the main project manager, and the labor service company is finally determined by the company. The group company has its own mixing station and rental station. The company regularly carries out various inspections on the project, and implements dual management of quality and safety companies and projects. The company has subordinate installation branches.

5. The investigation project is Sky City, which is the company's project under construction and the frame-shear structure is in the decoration stage. It was completed in June, 5438+February, XX, and the owner was Chengdu Li Ji Real Estate Co., Ltd., with an area of 60,000m2 and 32+ 1 floor. The construction quality is good, the site is safe and civilized, the provincial standard chemical plant, civil engineering and water and electricity are generally contracted, and the living quarters are arranged reasonably, which meets the requirements of standardization.

6. The general manager of the company contacted the vice president in charge of production, with strong willingness to cooperate and sufficient preparation materials. The third-level and second-level fees of this project can be reduced, and the proposed investment is100000.

7. The company plans to hire Jin Xiaoping as the project manager. Jin Xiaoping has a high social reputation and is an excellent project manager at the national, provincial and municipal levels. He has won Tianfu Cup 3 times, Furong Cup, provincial and municipal standard chemical land, national excellent qc achievement award for engineering construction, national customer satisfaction architectural engineering award, national excellent quality management team for engineering construction, national model worker's home, strong technical force in the project department, strong project brand awareness, and 65438+ projects under construction in xx years.

(1) Comprehensive Building of Sichuan Provincial Department of Agriculture, 12350 m2, Chengdu High-rise Model Project, Tianfu Cup, National Quality Management Achievement Award, provincial standard chemical industry site;

(2) Chengda Complex Building, with frame-shear structure, 24+2 floors, 34.761m2, with the contract price of 3 1.28 million yuan;

(3)intel project, 15000 m2, frame structure, second floor, fidic project;

(4) Sichuan Unicom Communication Hub Building, frame-shear structure, 1 1+2 floors, 40,000m2, contract price 8317,000 yuan. Sichuan engineering construction system users are satisfied with XX construction project, which is the gold medal of Tianfu Cup of XX Sichuan construction project and the provincial standard chemical land.

(5) Chengdu Second Construction Engineering Co., Ltd.

On the afternoon of August 23rd, xx, the investigation team visited Chengdu No.2 Construction Engineering Co., Ltd. ..

1, able to provide complete business license, tax registration certificate, safety production license, enterprise performance and other related information, with good reputation, state-owned enterprises.

2. Qualification: Grade I general contracting of housing construction projects.

3. No experience in cooperating with our company.

This company is very large, with more than 600 managers. The company has a perfect quality management system. The company appoints the main project manager, and the labor service company is finally determined by the company. The group company has its own mixing station and rental station. The company regularly carries out various inspections on the project, and implements dual management of quality and safety companies and projects. The company has subordinate installation branches.

5. The survey project is Sicily, which is the company's project under construction, with frame-shear structure, and is in the decoration construction stage. The owner is Chengdu Jiedi Real Estate Co., Ltd., with a floor area of 37,000m2 and 33+/kloc-0. The construction quality is average, the site is safe and civilized, the municipal standard chemical field, civil engineering, water and electricity contracting, the living quarters are arranged reasonably and meet the requirements of standardization, and the canteen is a provincial and municipal health demonstration site.

6. The company's vice president in charge of operation contacted him, with strong willingness to cooperate and sufficient preparation materials. The third-class and second-class fees of this project can be reduced, and it is planned to invest 8 million yuan.

7. The company plans to appoint Gao Daquan, a project manager with high social awareness and brand awareness. Experienced in Tianfu Cup, Furong Cup and provincial and municipal chemical industry, with strong technical strength. The representative projects he manages are:

(1) Fengde International Plaza Phase II, frame-shear structure, 46,000 ㎡, with a project cost of 32 million yuan, Chengdu Furong Cup, a provincial standard chemical site;

(2) Provincial Post and Telecommunications Network Management Center, 2XXm2, with a project cost of 23 million yuan, Tianfu Cup, Sichuan Province, a provincial standard chemical site.

(6) Sichuan Shutong Construction Company

On the afternoon of August 25th, xx, the investigation team visited Sichuan Shutong Construction Corporation.

1, able to provide complete business license, tax registration certificate, safety production license, enterprise performance and other related information, with good reputation, state-owned enterprises.

2. Qualification: Grade I general contracting of housing construction projects.

3. Experience in cooperation with our company, Western Shoe Capital Project. .

4. The company is large in scale, with more than 500 managers and weak brand awareness. The company has a perfect quality management system, the company appoints the main project manager, and the company conducts various inspections on the project regularly.

5. The investigation project is the orange blossom landscape and frame-shear structure of the company's construction in progress, which is in the decoration construction stage. The owner is Chengdu Shuangxin Technology Venture Capital Co., Ltd.,110000m2, 28+ 1 floor. The construction quality is average, and the site is safe and civilized. Among them, 1 building was rated as a municipal standardized construction site, and the total amount of civil works and water supply was average.

Article 3 of the model unit inspection report:

According to the company's plan, ministry of materials and equipment, Engineering Department and Budget Department conducted the following inspections on two pile foundation construction units on July 4th, xx:

1, qualification requirements of inspection unit:

(1) The bidding enterprise shall be an independent legal person with first-class foundation construction qualification.

(2) The proposed project manager must have a first-class registered builder's certificate in housing construction, have an intermediate title or above, be between 35 and 50 years old, be able to stay in the construction site for a long time, and have similar construction achievements of large-scale projects since June+10/65438.

(3) The personnel are fully equipped and the company management system is sound.

2. Examination content:

(1) Original enterprise qualification, business license, performance, honor, organization and project manager qualification;

(2) the project manager's experience and performance, the previous quality situation;

3, pile foundation construction unit:

(1) Henan Huicheng Infrastructure Co., Ltd. Address: Room 605, Jianda Building, No.99 Jinshui Road, Zhengzhou City

Tel: 0371-66216918 general manager: Suqing Guo, proposed project manager: Feng Haijing.

(2) Address of Henan Branch of Shanxi Geotechnical Engineering Survey Company: 8th Floor, Building 1 1, Xinyuan Mingmen, Xinyuan Road, Zhengzhou City