How much is a charging pile?

The installation cost of charging pile is mainly related to the installation conditions. For example, cable fees are generally not charged within 30 meters, but material fees are paid for distribution boxes, switches and meters. It is also related to the types of charging piles. For example, charging treasure or AC pile is the main household, and fast charging pile is the main charging pile, so the installation requirements are relatively high. Therefore, only a rough reference range can be given: the installation cost of AC pile is between 500-2000 yuan, and the fast-filling pile is between 5000- 1 10,000 yuan, including the material cost.

Methods of applying for private charging piles:

Step 1: Ask the property to agree and cooperate.

The consent of the residential property is the first condition. The consent of the property also means that the property is willing to cooperate to provide some necessary cooperation for installation, such as opening the door of the distribution room and locking some pipeline doors. It is necessary to issue the seal certificate of the residential property, and the general residential area is now open. Of course, after 20 18, all new residential areas have the conditions to install charging piles, so you don't have to take the step of residential property approval, just go to the next step.

In addition, the installation of charging piles can use property electricity, or you can apply directly to the power supply station. Of course, the property electricity fee is relatively high, and there may be a ladder price; If you apply to a power supply station, it is the same as the price of household electricity. It is recommended to apply directly, and the cost gap is relatively large.

Step 2: Apply to the power supply station where the community is located.

After the property agrees, apply to the power supply station with the parking space certificate (parking space title certificate), the owner's ID card and the property consent certificate, and fill in the low-voltage residential electricity consumption registration form, the low-voltage electric energy metering installation form, the low-voltage customer electricity receiving project completion acceptance opinion form, the customer business expansion and installation handling notice and the intelligent payment service agreement. The specific information is filled in according to the information provided by the local power supply bureau.

Step 3: The power supply station arranges on-site investigation.

After accepting the application, the power supply station will arrange on-site investigation in about 1-3 working days. If it meets the requirements, it will agree to install and install independent charging pile meters, and charge independently.

Step 4: Install the charging pile

After the power supply station agrees, the business installation can be carried out with the cooperation of the property, which takes about half a day to one day. After installation, you can pay for it.

Extended data:

Relevant safety requirements for charging piles:

(1) The substation shall be provided with safety fences, warning signs, safety signal lights and alarm bells.

(2) Warning signs of "Stop, High Voltage Danger" shall be hung on the safety posts in the high voltage distribution room and transformer room or substation. Warning signs must face the outside of the fence.

(3) There should be obvious operating instructions on the high-voltage distribution device. The grounding point of the equipment should be clearly visible.

(4) There should be obvious signs of "safe passage" or "safe exit" indoors.