What are the steps for home decoration? Is there a sequence?
First of all, we must understand the decoration process. According to the decoration process, we can make every step of the decoration very clear and will not step on many pits. A complete decoration process mainly includes two aspects, one is what preparations need to be made before decoration, and the other is formal decoration preparation.
First, the preparation work before decoration
First of all, before preparing for the decoration, you should have some general understanding of your own situation:
For example, how much money are you going to spend on decoration, how much energy can you put into decoration, and what kind of home do you want?
These three points correspond to the three preparations before the renovation:
Decoration budget, decoration method, decoration demand and style
1. Decoration budget
How much are you going to spend on decorating? I must be clear about this myself. What is the specific budget?
Step 1: estimate the total budget for decoration;
Step 2: When making a budget, 20% of the total price is used as a reserve fund, which is not included in the calculation range and will be used when it exceeds the budget in the later period;
Step 3: It is suggested that the decoration expenses be divided into hardware expenses, furniture expenses and household appliances expenses according to 2: 2: 1.
Step 4: Use subtraction to preliminarily estimate each expense.
2. Dyeing method
There are three main ways of decoration: all-inclusive, half-inclusive and open-package, which were mentioned in some previous Q&A articles. ..
I also summed it up for the owner's friends before, and it is more cost-effective to decorate half a package.
3. Decoration demand and style
What are the decoration requirements?
Occupancy demand, house value, comfort demand and what kind of home you want are all in the decoration demand.
Owners and friends can tell their own needs to designers, and let designers design and plan, which will be more worry-free and labor-saving, once and for all.
As for the decoration style, I will explain it in detail in subsequent articles.
After the above three items are confirmed, you can start the formal decoration.
Second, the decoration process
Before the official start of construction, we must pay attention to the need to report to the property and pay the decoration deposit.
1. Demolition works
Whether it is a rough house, a new house or a second-hand house, the renovation or renovation of the old house is inevitable, involving the renovation and renovation of the apartment pattern.
Therefore, the first step of decoration is to carry out according to the design drawings, and the wall will be demolished where it needs to be transformed.
What should I pay attention to when tearing down the wall?
1. Non-bearing walls can be removed, but they should be confirmed with the property right registration before removal to avoid unnecessary troubles later.
2. It is also a common problem that the load-bearing wall cannot be removed. If it is dismantled, it will leave a very big security risk.
3. When it is impossible to accurately identify the nature of the wall in an old house, it is best not to change and tear down the wall at will.
2. New projects
After the wall is demolished, the new wall should be laid according to the design drawings, and the hydropower transformation can only be carried out after the new wall is completed.
3. Hydropower transformation
Hydropower is a concealed project. Before decoration, it is necessary to determine the location of main furniture and household appliances, and plan hydropower lines, slots, installation, planning, pressure test, slot sealing, etc.
Be sure to determine the exact location of the number of switch sockets, furniture, home appliances, washing machines, etc. , to avoid late rework. In addition, after the completion of hydropower transformation, it is necessary to carry out suppression tests, which should not be missed.
If central air conditioning needs to be installed, fresh air system needs to be installed before hydropower transformation, and floor heating needs to be installed after hydropower transformation.
For the renovation of many old houses, it is best to completely renovate water and electricity. On the one hand, the old waterway circuit is used to adapt to the new life, on the other hand, the safety performance is considered.
After the phased test of hydropower transformation, wall tiles and floor tiles can be arranged to be purchased, and the subsequent mud tile project can be carried out in time after the completion of hydropower.
4. Mud tile project
Mud tile works include: repair, water and electricity slotting, ground leveling, waterproofing, floor tile and wall tile laying.
In the mud brick project stage, it is necessary to buy a floor drain, because it is necessary to install a floor drain for bricklaying? Cut the floor tiles according to the shape of the floor drain.
After the completion of the mud brick project, you can arrange customized furniture service personnel such as cabinets and wardrobes to measure the size, especially embedded household appliances. At this time, it is necessary to determine the size of household appliances.
What needs to be noted here is that when sticking wall tiles, you need to say hello to your neighbors downstairs, and do waterproof tests on the bathroom and balcony floor to prevent the floor from being waterproof.
5. Woodworking engineering
Woodworking projects include all customized cabinets at home and on-site construction and installation.
6. Paint works
Painting work mainly includes wall surface, putty scraping, latex paint spraying and wallpaper pasting.
Pay special attention to avoid rainy and humid weather, and paint construction will be carried out here.
Basically, the hard-fitting construction part of the decoration here has come to an end. There are some indoor doors, customized cabinets, range hoods, lamps and other devices to meet all kinds of furniture, household appliances and soft clothes.
7. advocate material installation soft comes into play
Let the master who has done hydropower transformation install lamps and switch sockets before, arrange merchants to install wooden floors at home, and let customized furniture enter the venue one after another. Indoor doors, curtains, toilets, sanitary ware, kitchen and bathroom, integrated ceiling, purchased furniture appliances and soft assembly ornaments can all enter the venue.
After all the above steps are completed, you can wait for check-in. Generally speaking, you can stay for about 3 to 6 months after ventilation, but you still need to keep ventilation after check-in to release all the residual formaldehyde.
Well, this is the detailed decoration process. Did you feel suddenly enlightened after reading it? If you have any questions, please leave a message in the comment area for discussion.
If you don't know about the renovation of new houses and old houses, click on Bian Xiao's head to answer professional questions about online customer service.
- Previous article:How about Linyi Jinxiu Home?
- Next article:Scale of Foshan Ridong Electrician Co., Ltd.
- Related articles
- Who is the owner of Wan Yue Hotel in Gongbei, Zhuhai?
- How much is Kazuki Watanabe musician International Property Management Fee?
- There will be a notice when classes will resume in Chengdu in 2020.
- Who has a good community entrance? Give me a reference.
- Departure Schedule of Daqing Bus No.806
- What is the telephone number of the marketing center of Chongchuan Greenland Store in Nantong?
- What is the telephone number of Tianjin Chuangxiang Property Management Co., Ltd.?
- Does the Shanghai Longhu Star Map Project have investment value?
- How about Ramada Apartment in North Island, New Zealand?
- What is the telephone number of Guangdong Medical Device Co., Ltd. of Sinopharm Group?