Water and electricity installation contract

Water and electricity installation contract (1)

Installer: (hereinafter referred to as Party A):

Contractor: (hereinafter referred to as Party B):

This contract is signed by both parties through equal and voluntary negotiation.

I. Overview of the Project:

1, project name: hydropower installation

2. Project location: Room 704, Building 2, Fujitsu Regal Plaza 1 Unit.

3. Project content:

(1) electrical: (including: drilling trunking, drilling, wiring, pipe fixing, lamp installation, cement mortar patching trunking, control switch, electric meter, electric box, wiring laying, switch, lighting socket, telephone line, optical fiber cable, network cable, TV cable, security system, gas pipeline, indoor installation, outdoor connection to the main meter, etc.)

② Water: (including: brick wall, cement mortar water supply pipe trough, tap water supply pipe, water meter, kitchen water supply and drainage, toilet water supply and drainage, faucet, sewage pipe, washbasin, toilet, pool, water heater, indoor installation and laying, hot water supply and drainage and control line pipe, connecting outdoor sewage pipe, outdoor rainwater pipe, etc. ) construction, commissioning and acceptance.

③ skirting line: (laying skirting line according to decoration standard) construction and acceptance.

④ Cleaning up the garbage generated by construction: (According to the requirements of property management, Party B will transport the garbage generated by water and electricity installation to the designated place).

4. Nature of the project: single contractor, contractor's quality, contractor's construction period, contractor's safety and contractor's civilized construction.

5. Scope of contract: related construction contents involved in water and electricity installation of the house.

Second, the construction period:

1, total duration.

2. Start date.

3. Date of completion.

Three. terms of payment

1 Pay 30% when the skirting line is laid, chisel the trunking and brick wall, pay 50% when the water and electricity are installed, repair the trunking and water pipe trough with cement mortar, and pay after the installation of switches, socket boards, faucets, water heaters/lamps and other contents related to the water and electricity installation. Pay within three months.

Fourth, the total project price:

RMB Yuan (in words) (total price negotiated by both parties)

Five, the construction quality requirements and acceptance specifications.

1. During the construction process, Party A must be informed of the acceptance of each working procedure before the next working procedure can be started. If there is any problem, Party B can be ordered to do it again.

2, qualified, in line with the current national building standards.

3. When the water distribution circuit is used, the water circuit is not allowed to be wound intentionally, especially when the wall is worn, the hole must be drilled through the wall. After laying the thread, it is easy to twitch.

4, TV line, network line must have a distribution box, the whole line branches to various locations, TV line, network line and telephone line are prohibited from taking the same pipeline.

5. The connection between the live wire incoming switch and the neutral wire incoming socket shall conform to the provisions of "left zero right fire protection grounding".

6, switch, socket installation is firm, the position is correct, the cover plate is correct, close to the wall, seamless,; After the installation of electrical engineering, electrical electrification, lighting test and switch control should be carried out.

7. Pipeline layout is reasonable, laying is firm, horizontal and vertical, flexible and convenient to use, and concealed works should be accepted before sealing.

The rights and responsibilities of both parties of intransitive verbs. ..

1. Tools, appliances and safety supplies required for construction shall be provided by Party B, and all safety responsibilities and matters shall be borne by Party B, which has nothing to do with Party A.

2. Party B shall, according to the requirements of Party A, cooperate with the scientific construction of each process and provide convenience and speed for the construction of other processes.

3. All materials for the above installation are provided by Party A, and Party B is responsible for the quality supervision and acceptance of all materials. Party B is responsible for installation, and the contractor does not contract materials. The warranty period of Party B's engineering installation quality is three years.

4. During the construction and installation, Party A is responsible for providing sufficient installation sites and materials; Party B is responsible for organizing installation workers to carry out installation construction, etc. If Party A fails to provide support in accordance with the above terms, Party B shall not be responsible for failing to complete the engineering quantity on time.

5. After entering the construction site, Party B shall strictly implement the safety precautions, and Party B shall be responsible for and undertake the personnel safety precautions and safety matters, which have nothing to do with Party A. ..

6. Party B shall be responsible for the problems arising during the warranty period.

7. During the construction period, Party B shall be responsible for or compensate for the damage caused to articles (such as elevators, stair floors, etc.) in the residential area.

8. If both parties disagree and negotiation fails, Party B shall withdraw unconditionally. After that, both parties can appeal to the relevant departments or bring a lawsuit to the court.

7. This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature.

Party A, Party B and Party B's promoters:

ID card: ID card:

Tel: Tel:

* * Year Month Day

Water and electricity installation contract (2)

Party A: (Employer)

Party B: (Contractor)

On the basis of equality, voluntariness and consensus, and on the principle of mutual trust, Party A and Party B have reached the following agreement on the hydropower project of Party A..

Article 1: Project Overview

1, project location:

2. Project contracting method: Contractor A contracts projects and materials; The contractor's contracted part of the project package; The contractor guarantees cleaning work.

3. The construction period is from _ _ _ _ to _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4. Contract Price: The estimated project cost of this contract is RMB _ _ _ _ _ _ (in words). If the construction content and materials change, the project cost should be calculated according to the actual situation.

Article 2: Material Supply Agreement

1. The materials supplied by Party A in this project shall be qualified products that meet the requirements and shall be supplied to the site on time. Party B shall go through the acceptance formalities. If there is any quality problem or specification difference, Party B shall submit it to Party A in writing in time, and Party A still agrees to use it, and Party A shall be responsible for the engineering losses caused thereby. After the materials supplied by Party A arrive at the site, they shall be kept by Party B after passing the acceptance, and Party B shall be responsible for compensation for the losses caused by improper storage.

2. The decorative materials supplied by Party A shall be used in this project, and shall not be used for other purposes without Party A's consent. If Party B violates this regulation, Party B shall pay Party A double the material fee.

3. If the materials provided by Party B do not meet the quality requirements or have different specifications, they shall be prohibited from being used. If it has been used, Party B shall be responsible for the losses caused to the project. If the materials provided by Party B are fake and shoddy goods, Party A shall be compensated for double the price of the materials.

Article 3: Agreement on Project Quality and Acceptance

1, this project should strictly implement the national Code for Construction of Residential Decoration Engineering gb-XX and Code for Quality Acceptance of Architectural Decoration Engineering gb-XX, and refer to other local standards and quality evaluation acceptance standards.

2. If quality problems are caused by Party B's own reasons, such as poor technology and weak sense of responsibility, () Party B shall bear the cost of rework.

3. Project completion: Party B shall notify Party A of the acceptance in advance and go through the acceptance procedures.

4. The construction scheme of this project is designed by Party _ _ _.

Article 4: Agreement on site management of fire prevention in production safety.

1, strictly abide by the provisions of the decoration construction time, reduce construction noise, reduce environmental pollution.

2. Without the consent of Party A and the approval of relevant departments, the original building structure and various equipment and pipelines shall not be dismantled and changed at will during construction.

3. Ensure that the decoration site is clean and tidy, and do a good job of cleaning and handling before completion.

4. Party B shall cooperate with Party A to keep the construction materials and prohibit other personnel from entering the site.

5. Without Party A's permission, Party B shall not take any decoration materials provided by Party A out of the house. In case of theft, Party B shall pay double indemnity according to the material price.

Article 5: Terms of payment, contract contents and settlement of project funds.

1. After typesetting and slotting is completed, Party B shall be paid 50% of the project cost, 30% after the completion of water and electricity, and 20% after the overall completion acceptance.

2. The warranty period of this project is five years, and the project payment will be settled in full. Party A and Party B sign the project warranty, and the warranty period is calculated from the date of signing the completion acceptance.

3. Both parties shall issue payment receipts.

4. Project settlement method: _ _ _ _ meters for waterway and _ _ _ _ meters for circuit.

5. Contract contents of Party B: 1, water and electricity slotting, wiring, threading and trench burying; 2, all the garbage in the process of hydropower construction site classification and bagging; 3, hydropower construction wall, drilling, cutting; 4, switch socket panel installation; 5. Hardware installation; 6. Installation of lamps and lanterns in the later period (crystal lamps are counted separately); 7. Other charging items shall be calculated separately.

Article 6: Settlement of disputes

In case of any dispute over the quality of the project, both parties shall settle it through negotiation; if they are unwilling to settle it through negotiation or mediation, or if negotiation or mediation fails, they may bring a lawsuit to the people's court as agreed in this contract.

Article 7: Modification and Termination of the Contract

1. After this contract comes into effect after being signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after consultation. Before the signing of the contract, if one party wants to terminate the contract, it should put forward in writing, pay liquidated damages at% of the total contract price, and go through the termination procedures.

2. In the process of construction, if either party promises to terminate the contract, it shall give a written notice to the other party, and both parties agree to go through liquidation procedures, conclude a termination agreement and terminate the contract.

Article 8: Other Agreements

1. If the construction period is delayed due to force majeure or unforeseeable factors such as weather and power failure, it can be postponed after confirmation by both parties.

2. Before entering the site, Party A may require Party B to go to the site for three times to cooperate with other types of work for cross-construction, and Party A shall pay labor costs to Party B for each time exceeding three times.

3. During the warranty period, Party B shall repair the quality problems caused by Party B's construction equipment free of charge and must arrive at the site within 48 hours after receiving the notice from Party A.. In case of problems caused by Party A's improper use or force majeure, quality objection of main materials and products purchased by Party A, or unforeseen reasons, Party A shall pay the maintenance fee to Party B according to the actual cost.

Article 9: Supplementary provisions

1. This contract shall come into effect after being signed (sealed) by both parties, and shall be terminated after the performance of the contract.

2. After this contract is signed, the project shall not be subcontracted.

3. This contract is made in duplicate, with each party holding one copy.

4. This contract is valid until _ _ _ _ _.

The warranty period of this project is five years. After the warranty period, Party B shall pay Party A the corresponding maintenance expenses. ..