Regulations on the management of office building decoration

Office decoration time is generally classified as property management. Shopping malls, office buildings and properties all stipulate that the decoration time is weekends and evenings, and silent and tasteless work can be carried out during the day. The main purpose is not to interfere with his company.

♂? building acts

The decoration unit is allowed to carry out non-silent operations during construction on legal holidays and other time periods without violating this management regulation. If the decoration unit needs night construction, it must first submit a written application to the management office, and the construction can be carried out only after the approval of the management office. In addition, the decoration unit must obtain the decoration construction permit and paste a copy indoors or on the door. At the same time, the decoration application form must have been approved in writing by the management office.

♀? personnel management

When the staff of the decoration unit enter and leave the office building for decoration, they must apply for a temporary pass for the decoration personnel. Each person has one copy, and * * is not allowed and should be carried with him, so as to cooperate with the management office for verification. You must be responsible for the loss and reissue it immediately. During the construction period, the decoration unit shall not damage the public facilities, equipment and the property of the property users. Otherwise, compensation must be paid unconditionally.

material handling

In the Management Regulations on Office Building Decoration, it is forbidden to transport all the building materials of the decoration unit out of the passenger elevator during the decoration construction. Black and pink materials such as sand, cement and lime must be packed in sealed bags before they can be transported away from the freight elevator. If there is a leak, it will be transported out of the fire escape. The length, width and height of the materials of the decoration unit shall not exceed the length, width and height of the freight elevator; The maximum load of the freight elevator shall not be exceeded. This material cannot cover the camera probe.