The process of decorating one's house

Young people like to do it themselves, so when they buy a house, they have the idea of decorating their own house. So how can the decoration be efficient, low budget and environmentally friendly? Next, I will give you an analysis of the process of decorating the house, hoping to give you a reference!

The process of decorating your own house 1 Pre-design:

Mainly according to their own living habits, a detailed measurement of their own rooms, we should not be lazy, it is best to personally measure it again, the measurement content mainly includes: clear the area involved in the decoration process. Especially tile area, wall paint area, wallpaper area and floor area; Determine the main wall size. Especially it is necessary to design the wall size of furniture in the future. Or go directly to the designer of the decoration company to measure you. There is fierce competition among decoration companies now. Many companies provide free home survey services for designers, and then they will draw a graphic design according to your indoor layout.

2. The main demolition and transformation:

In the construction stage, the demolition and reconstruction of the main infilled wall is the first project, which mainly includes wall demolition, wall building, wall peeling, heating removal and replacement of plastic-steel windows. To put it bluntly, the main body demolition is to put up the framework of the construction site first.

3 hydropower transformation:

Before the water circuit reform, the main structure should be basically completed. Between hydropower transformation and main demolition, the first test of the cabinet should also be carried out. The so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers. Mainly includes:

(1) See whether the position of the lampblack machine socket affects the installation of lampblack machine in the future;

(2) See whether the location of the water meter is appropriate;

(3) See if the location of the water inlet is convenient for installing the sink in the future.

(4) For the first measurement of cabinets, experienced friends can do it themselves. After the waterway reconstruction is completed, it is best to waterproof the bathroom. The kitchen generally does not need to be waterproof, so it is recommended to be waterproof.

4 carpentry:

Woodworking, bricklayer and oiler are the construction links? Three brothers? The basic order of appearance is: carpentry? Bricklayer? Painter. The basic entry principle is that whoever is dirty will go first.

In fact, carpentry, such as vertical pipe, decorative ceiling and plaster line, can also be considered as the fine link of main demolition and reconstruction in a sense, which does not conflict with the water circuit reconstruction itself, and sometimes needs some cooperation.

5 tiling:

Are you online? Bricklayer's penis? The operation process also involves the installation of the following three links:

(1) lintel and marble windowsill installation. The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue.

(2) Floor drain installation. Floor drain is the first hardware in home decoration, because it should be installed with floor tiles. So when friends start shopping for building materials, they should buy a floor drain as soon as possible.

(3) Installation of range hood. The range hood is the first appearance of household appliances. After the kitchen walls and tiles are paved, you can consider installing a range hood.

? Bricklayer's penis? When you leave, you can take a second measurement of the cupboard. Accurately speaking, after the kitchen wall tiles are pasted and the range hood is installed, the second measurement of the cabinet can be carried out.

6 brush the wall paint:

? The third oil worker? Enter the site, mainly to complete the basic treatment of the wall, brush the top coat and give it to? Woodworking boss? Paint furniture, etc. Students who are going to wallpaper just need to let? The third oil worker? Just do the basic treatment on the wall where wallpaper is planned. As for whether I left my coat for the last time, I personally don't think it is necessary to take this question too seriously. From my experience in decoration, it is of little significance to leave the top coat, because the operation behind is not dirtier than painting.

7 kitchen and bathroom ceiling:

Is the cabinet ceiling the first part of the installation, or will it continue to be the master? Packaging? . At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought. It is suggested that you'd better install the kitchen ceiling lamp and the exhaust fan (Yuba) at the same time, or leave a line and an opening.

8 Kitchen Cabinet Installation

After the ceiling is completed, you can make an appointment to install the cabinet at home. If it goes well, it can be finished in one day. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.

9 wood door installation

(1) The second day after the cabinet was installed, the wooden door was measured more than a month ago, and now it can probably be installed. If it goes well, it will be a day. At the same time, hinges, door locks and floor drains should be installed. Related hardware should be prepared in advance.

(2) If you want the wooden door manufacturer to install the window cover and pass it, you should also measure it when the wooden door manufacturer measures it, and install it at the same time on the day when the wooden door is installed. At the same time, you should consider putting the installation time of marble windowsill backward after the window cover is installed.

(3) Remarks: The production cycle of wooden doors is generally one month. Therefore, in order to make the construction period closely connected, wooden door manufacturers should go to the door to measure the size of the door opening as soon as possible after the main body is removed. Regarding the handling of doorways, we need to pay attention to one thing. If the height of the door at home is inconsistent, workers need to treat it according to the same height to look good.

10 Floor installation:

The floor can be installed the day after the wooden door is installed. If all goes well, it will take a day. The floor installation needs to pay attention to the following issues:

(1) Before the floor is installed, it's best to let the manufacturer go to the door to investigate whether the ground needs leveling or partial leveling. Some decoration companies or decoration teams will suggest leveling or partial leveling of the ground, subject to the actual investigation of the floor manufacturer.

(2) Before the floor is installed, the floor paved at home should be cleaned to ensure the floor is dry, so do not use water during the cleaning process.

(3) When the floor is installed, if possible, the' cutting' of the floor must be in the corridor. Clean it up after you finish. Cutting the floor indoors has serious pollution to the wall, and cutting the artificial stone countertops of cabinets.

The process of DIY decoration of the house.

1 1 Paving wallpaper:

The next day after the floor is installed, the home is ready, and you can make an appointment to paste wallpaper. If it goes well, the same day will do. If possible, the floor should be protected on the day of wallpaper pasting; It doesn't matter if there are no conditions, and it's no problem to give the wallpaper glue left on the floor to the cleaner. Try to do it on the wall before the wallpaper is laid? There's nothing.

12 radiator installation:

The day after the wallpaper is laid, the person who replaces or removes the radiator can hang the radiator on the wall in a down-to-earth manner. It's also a day.

Wooden door floor wallpaper radiator, which is recognized as the correct installation sequence, is to install the wooden door first to ensure that the skirting line of the floor can be closely connected with the door cover of the wooden door; After the wallpaper was installed, it was mainly because the floor was dirty and dusty, which seriously polluted the wallpaper. What I said before is used here again? Who gets dirty first? The principle of. Finally, install the radiator, because the radiator can only be installed after the wallpaper is laid on the wall.

13 switch socket installation

We should have a detailed understanding or record of the number and location of switch sockets in various natural rooms at home, especially wallpaper pasting workers. Sometimes the wallpaper worker is irresponsible, and the wallpaper is laid at once, and there is no need for wallpaper knife to mark the position of your switch socket. So, you still need to know for yourself.

14 lighting installation

Install the lights. There is nothing to say. After the lights were installed, the house lit up, and it felt good to bid farewell to the dazzling light of 100 watt incandescent bulbs during decoration.

15 installation of hardware and sanitary ware

Before buying pipe fittings, bathroom fittings, toilets, clothes hangers, etc. , are all installed. The ones in front? Big ones? After the installation, the home is still very good? Cold? After the lamps and hardware sanitary ware are installed, what will happen at home? Live broadcast? Really? Live broadcast? Yes It is no exaggeration to say that for the first time, you opened the dragon water and looked at the water? Wow, wow? When you flow out, your heart will be beautiful; Convenient, the newly installed toilet at home for the first time will have a great sense of accomplishment.

16 cleaning

Don't install curtains before cleaning. When cleaning, don't have furniture and unnecessary household appliances at home. Keep as much as possible? A plane? So that it can be thoroughly cleaned.

17 furniture comes into play

As for the purchase time of furniture, it should be after the completion of water circuit decoration at the earliest, so as to get a general understanding of the basic size range of furniture. Therefore, some friends have been eager to book all the furniture before the renovation, and personally feel that it is not necessary.

18 home appliances enter the site

At this time, it's time for home appliances to enter the market. It's time to install and prepare to move in!

19 home accessories

Home decoration, the last step of home improvement, has changed from decoration to decoration, including the installation of curtains. As for buying curtains, it is best to book furniture first to avoid style conflict. Home accessories also include buying some green plants, hanging murals, decorating handicrafts and so on. In short, after you stay, you can play freely.