How to do water and electricity installation information?
To be a hydropower documenter, we should make the following compensations:
First, pay attention to data management and realize "data pre-control"
The so-called "data pre-control" refers to having an overall outline of the basic data that should be possessed in the project construction process before construction, and knowing what data needs to be collected. Because every project from the foundation to the main body, from decoration to completion acceptance, has its own internal laws and regulations, rules to follow. Through data pre-control, the submitted data can be reviewed in advance, and the construction unit can be urged to synchronize the data with the construction.
Second, master the scope and content of data collection in each stage.
The data can reflect the quality of materials used in the project, whether the handover between processes meets the requirements, whether the project is constructed according to the drawings, and so on. As a supervision librarian, we should strictly control this pass and do a good job in collecting, reviewing and sorting out information.
Third, strengthen the connection between information and websites.
Fourth, strengthen communication and contact with the owner and the construction unit, and have certain coordination ability.
Fifth, we should strengthen our study.
Six, engineering data must be timely, true, accurate and complete.
What information does the information officer of hydropower installation project need to do?
Do electrical data:
1, floor pipe embedded (process sheet+inspection lot+hidden record)
2, the floor wall pipe embedded (process sheet+inspection batch+hidden records)
3, bridge installation (process+inspection lot)
4. Threading (process sheet+inspection lot)
5, cable head production (process sheet+inspection lot)
6, line insulation resistance test (process sheet+insulation resistance record) (this is not as a component project, when sorting out the data, put it behind the cable head manufacturing process)
7, switch, socket installation (process sheet+inspection lot)
8, ordinary lamps and lanterns installation (process sheet+inspection lot)
9. Installation of special lamps (process sheet+inspection lot) (special lamps refer to fire emergency lights, evacuation instructions, etc. )
10, complete set of distribution box installation (process sheet+inspection lot)
1 1, power-on debugging (process sheet+inspection lot+power-on debugging record)
12, lightning protection grounding resistance test (process sheet+test record)
13, foundation lightning protection grounding welding (process sheet+inspection lot+hidden record+chart)
14, lightning protection downlead welding (process sheet+inspection lot)
15, equipotential welding in toilet (process sheet+inspection lot)
16, roof lightning arrester welding (process sheet+inspection lot)
The information about water is much simpler.
1, construction organization design
2, water supply pipeline and accessories installation
3, drainage pipe installation
4, pipe hanger installation
5, pressure pipeline strict experiment
6. Non-pressure pipeline irrigation
7, floor riser water
8, pipeline ball experiment
9, drainage pipeline expansion device reserved
Two materials plus inspection materials and the first seven tables.
As for sorting out the data, we will follow this order. There were seven unified tables in the previous data folder. After all the data are done, we will make those seven unified tables.
In some places, the catalogue may be strictly required, so this is more complicated. You should beat and scold with a coding machine and then do it!
Please add essence if you find it useful, thank you! !
How to do water and electricity installation information? Specific steps.
Indoor drainage system
Installation of drain pipes and fittings
One to five floors
five
titular
Installation of rainwater pipes and fittings
One to five floors
1
titular
Sanitary ware installation
Sanitary ware installation
One to five floors
five
titular
Installation of water supply fittings for sanitary ware
One to five floors
five
titular
Installation of sanitary ware drainage pipeline
One to five floors
five
titular
1
three
six
27
titular
architecture electric
Install power mains
Installation of cable tray and laying of cable in the tray
One to five floors
five
titular
Electric lighting device
Installation of lighting distribution box
One to five floors
six
titular
Wire conduit laying
One to five floors
five
titular
Installation of electric wire through pipe
First to second floors
five
titular
Cable head manufacturing, wiring and line insulation test
One to five floors
five
titular
Installation of special lamps and lanterns
One to five floors
five
titular
Installation of ordinary lamps and lanterns
One to five floors
five
titular
Installation of switches and sockets
One to five floors
five
titular
Installation of lightning protection and grounding device
Power-on trial operation of building lighting
One to five floors
five
titular
Installation of grounding device
Artificial grounding device
1
titular
Local equipotential bonding in bathroom
One to five floors
five
titular
Lightning protection downlead laying
1
titular
Installation of lightning arrester
Roof covering method
1
titular
1
four
54
titular
Construction data: serial number
Material name
number of pages
Reserve bill
1
Design disclosure and joint review of construction drawings
three
2
Special construction organization design scheme for hydropower installation
30
three
Engineering (design) change contact list
four
four
Main equipment and materials, factory certificate and test report
48
five
Acceptance record of concealed works
17
six
Installation record of power and lighting distribution cabinet (box)
seven
seven
Cable tray installation inspection record
1
eight
Cable laying and insulation resistance test records
2
nine
Test record of insulation resistance of distribution line
4 1
10
Electrical insulation resistance test record
2
1 1
Wiring inspection records of lines, sockets and switches
10
12
Simulation test record of leakage protection device
five
13
Lighting full-load power-on commissioning record
five
14
Hidden record of grounding device construction
1
15
Grounding resistance test record
1
16
Installation record of lightning rod and lightning belt
1
17
Pipeline (equipment) strength test record
10
18
Flushing record of pipeline system
1
19
Water supply pipeline water test record
three
20
Drainage pipe irrigation test record
1
2 1
Drainage pipeline water test record
2
22
Drainage pipe ball test record
2
23
Rainwater pipeline water test record
2
24
Test record of rainwater pipeline passing ball
1
25
Sanitary ware full water and water test records
five
Inspection and acceptance record number of concealed works for grounding device installation: (01-18/03-02/04-02/05-16)/06-17/(08-20/09-0/.
Division (sub-division) project name
Installation of lightning protection and grounding device
Project manager
construction organization
Receiving position
basis
Construction drawing number
Dianshi -02
Name and number of construction execution standard
GB50303-2002 Standard Drawing of Lightning Protection and Grounding Construction Organization Design for Civil Buildings < 97 Zhejiang D2 >
Name of subdivisional work/inspection lot number
06070 1
Contact phone number or date
inspection item
Check the situation
Description or schematic diagram: Carry out construction according to electrical drawing -02, and install lightning protection and grounding devices as required. The two main bars in the lower floor of the ground beam of the building foundation are welded around and welded with the two main bars in the pile foundation at each lightning protection downlead as a grounding device. Lightning protection grounding, protective grounding and equipment grounding share a grounding body. The lightning protection downlead is welded with the foundation grounding device by using two φ 16 main bars in the pile, and crosses the A axis at 1 6, 10, 12, 16, 20 ...>& gt
How to do water and electricity installation information
Go to the building bookstore to buy a set of water and electricity information, the number is SN, just fill in the list order, and any test report you need will indicate the information.
How to do the secondary embedded data of hydropower installation?
According to the partial and inspection lot, and according to the professional floor or system (water supply and drainage), so the standard layer can be done once on several floors, and the hidden information must be done once on each floor.
What information does the information officer of hydropower installation project need to do?
From the foundation to the top of the main body: 1, grounding device, lightning protection downlead (part: foundation) 2, lightning protection downlead, electric conduit
Installation and equipotential (from garage floor to roof)
Later hydropower installation:
I. Water
Water supply management road and fittings installation (can be reported by unit or floor). See supervision requirements)
Installation of indoor drainage pipes and fittings (can be reported by unit or floor). See supervision requirements)
Installation of rainwater pipes and fittings (east, south, west and north elevations)
Sanitary ware drainage pipe installation (can be reported by unit, but also by floor. See supervision requirements)
Indoor fire hydrant system installation (can be reported by unit or floor. See supervision requirements)
Installation of indoor fire hydrant system (roof)
Second, electricity.
Distribution box installation (can be reported by unit or floor. See supervision requirements)
Thread (can be reported by unit or floor). See supervision requirements)
Line insulation resistance test (can be reported by unit or floor. See supervision requirements)
Switch, socket installation (can be reported by the unit, can also be reported by the floor. See supervision requirements)
Trial operation of lighting power of ordinary lamps and lanterns installation building (can be reported by unit or floor. See supervision requirements)
Lightning receptor (roof)
Cable tray installation (can be reported by unit or floor. See supervision requirements)
Give me your share. This is the first time I have answered a question. It may not be all, but I wrote it myself. Comrade ... "
How to do the installation data of building water and electricity?
I know electrical. I just started to do electrical. The lightning protection and equipotential of grounding embedded pipes are hidden.
How to do the image data of water and electricity installation?
First, photograph the laying route of all water and electricity on the site. It is best to mark the approximate distance and size with PS, and then mark the name of the picture clearly. It's best to sort out all the data, classify them in folders, and carve them for backup.
What tools, materials and precautions are needed for hydropower installation?
Precautions for hydropower transformation!
The renovation of water circuit is a concealed project in decoration, so special attention should be paid to the positions of various switches and sockets. The position of upper and lower water; Sockets, yuba and light wires must be reserved ... If these problems are not thought out in advance, it will be troublesome to change the waterway once it is done. Therefore, before the decoration, it is necessary to determine the size and height of furniture and the location of electrical appliances and audio equipment as much as possible, communicate with the construction team in advance, make preparations in advance, and minimize regrets.
First, the waterway part.
1, waterway design should first consider all water-related equipment, such as water heaters, water purifiers, kitchen treasures, water softeners, washing machines, toilets, washbasins, etc. Their locations, installation methods and whether hot water is needed;
2, want to use gas or electric water heaters in advance, to avoid temporary replacement of water heaters, resulting in repeated transformation of waterways;
3. In addition to the washbasin, mop pool, toilet, washing machine and other water outlets, it is best to take one out of the bathroom to facilitate water collection and washing the ground in the future;
4. After the location of the washing machine is determined, the drainage pipe of the washing machine can be considered in the wall, which is beautiful and convenient;
5. There should be a suppression test after the channel reconstruction.
6. It is best to have a property on-site suppression test, which can play a supervisory role; Because some decoration teams will cheat the owners in this link. The method is: when pressing, open the "return valve" of the pressing pump to form a loop. Although the press pump seems to be working, the pressure in the pipeline is not great, especially the electric press pump, which students should pay more attention to.
7. Pay attention to check whether the drains in the kitchen and bathroom are unobstructed when closing the house. If the drainage is slow, the property should be dredged in time; Protect the drain when decorating, especially when laying kitchen and bathroom tiles, which is most likely to cause cement to fall into the drain and cause blockage;
8. After the kitchen and bathroom floor tiles are laid, check whether the floor drain is unobstructed (the drainage speed after removing the floor drain cover shall prevail, because most deep-water sealed floor drains have the problem of slow drainage);
9. If you want to close the redundant floor drain, you must block the gap between the drain pipe and the floor drain with glass glue or cement to prevent water from overflowing and returning to odor.
10, and another point is particularly important. It is best not to use deep-water sealed floor drain for washing machine floor drain, mainly because deep-water sealed floor drain has a common feature of slow launching, which is used for deep-water sealed floor drain in shower room and other places. Because the displacement is not large, the floor drain can basically meet the drainage demand; However, the drainage speed of washing machine is very fast, which can not reach the drainage speed of deep-water floor drain at all, which directly leads to water overflow;
1 1. In waterway reconstruction, four points should be paid attention to for the cold and hot water supply pipes reserved for installing electric water heaters and faucets in the future:
A, ensure the spacing of 15cm (at present, the spacing between hot and cold water of most electric water heaters and faucets is 15cm, and some are10cm);
B, hot and cold water nozzle height is consistent;
C, cold, hot water nozzle vertical wall, later build by laying bricks or stones wall also should pay attention to don't let bricklayer get crooked (not vertical, later installation will be very difficult);
D, cold, hot water nozzle should be two centimeters higher than the wall, in the wall brick, also should ask the bricklayer to ensure that the wall brick and water pipe nozzle in the same level. If the size is not suitable, install electric water heaters, faucets, etc. Additional couplings, internal wires and other connectors may need to be purchased in the future to complete the installation;
12, don't forget that the bathroom floor is waterproof, especially the slotted floor. If the shower area is not a closed shower room, the wall waterproof should be 180 cm high. Be sure to do a 24-hour closed water test before plastering cement, and bricklaying can only be done if there is no problem;
Second, the circuit part.
The design of 1. circuit must be determined after considering the possibility, feasibility and availability in detail. No one wants to pull wires everywhere on the walls and floors of their new home. At the same time, we should pay attention to its flexibility in circuit design. In the future, when the electrical plugs are concentrated, it is often better to connect a patch panel than to set up a wall socket.
2, the bedroom ceiling light can consider dual control (bedside and porch);
3. According to the needs of life, the ceiling lamp in the living room can be equipped with a separate control switch (in the porch hall, facing away from the master bedroom door);
4. When the circuit is reformed, the surrounding audio lines should be buried.
5, pay attention to the strong and weak wires can't be in the same pipe, there will be interference;
6. If the living room, kitchen and bathroom are tiled, some positions can be properly considered without slotting wiring;
7. The socket is generally 30CM from the ground and should not be less than 20CM. If the living room uses a low cabinet as a TV cabinet, it can be a little higher from the ground ... >>
Hydropower installation information officer
I'll introduce some books to you and study hard. I believe I can be an excellent librarian.
1, Code for Filing and Arrangement of Construction Engineering Documents GB/T50328-2001; 2. Regulations on Information Management of Construction Engineering DBJ 01-51-2003;
3. Unified Standard for Acceptance of Construction Quality of Building Engineering (GB 50300-2001; +0);
4. Code for Acceptance of Construction Quality of Building Electrical Engineering (GB 50303-2002;; );
5. Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Engineering (GB 50243-2002;; );
6. Code for Acceptance of Construction Quality of Building Water Supply, Drainage and Heating Engineering (GB 50242-2002;; );
Master these, and you will be able to eat for a lifetime!
- Related articles
- What is the best route from Jialing Town, Xiangcheng City to Jiaxing, Zhejiang Province?
- What are the common signs in life?
- How much is Hefei land _ Xuanyueping?
- What community is there in Hunnandu, Shenyang?
- What is the telephone number of the sales office in Dalian Tielong Lianxingli?
- Is Weifang Haofeng Jiangshan Yipin Belt decorated?
- Facing the harsh environment, how should we protect our homeland?
- What is the postcode of Saihan District, Hohhot City, Inner Mongolia?
- What about Haimen Dayu Municipal Facilities Management Service Co., Ltd.?
- Where is Shangqiu Zhongyuan Jiahai International Trade City?