Job Recruitment Website - Property management company - Architecture. Property. What information do you need for declaration and acceptance?

Architecture. Property. What information do you need for declaration and acceptance?

Your question is not clear, whether it is the information needed for the acceptance of construction projects or the information needed for the construction of property acceptance construction units. Now, the answers are given respectively: 1, construction project completion acceptance data.

Project completion acceptance record (in quadruplicate);

2, the project completion acceptance report;

3. Construction permit;

4, construction drawing design documents review opinions;

5, the construction unit project completion report;

6, supervision unit engineering quality evaluation report;

7, survey and design quality inspection report;

8, urban and rural planning department approval documents;

9, the fire department approved the use of documents;

10, approved by the environmental protection department;

1 1, the project completion acceptance opinions signed by the members of the acceptance team;

12, unit engineering quality acceptance documents:

1) foundation acceptance record and pile foundation inspection certification report;

2) Acceptance records of key parts such as foundation and main body;

3) Completion acceptance record of unit project quality.

13, municipal engineering quality inspection and function test data;

14, construction project file acceptance permit;

15, quality guarantee signed by the construction unit;

16, residential quality guarantee and residential instruction manual for commercial housing;

17, other related information.

Project completion inspection form

Unit (sub-unit) project quality completion acceptance record

Unit (sub-unit) engineering quality control data verification record

Unit (sub-unit) engineering visual quality inspection record

Unit (sub-unit) engineering safety and function spot check records

Construction application report

Construction site quality management inspection records

Engineering positioning survey record

Building settlement observation record

Application form for concrete mixture ratio

Mortar mixture ratio application form

Raw material inspection report and test report

Structural entity quality inspection

Application Form for Engineering Materials/Components/Equipment

Acceptance record of concealed works

Foundation and Foundation Division (Inspection Lot Quality Acceptance Record)

Main Division (Inspection Lot Quality Acceptance Record)

Decoration Division (Inspection Lot Quality Acceptance Record)

Building Roof Division (Inspection Lot Quality Acceptance Record)

Water supply and drainage division (inspection lot quality acceptance record)

Quality Acceptance Record of Building Electrical Division (Inspection Lot)

Book a: quality plan information; (commencement, resumption of work, completion report, mandatory provisions, acceptance form, design change notice, blue prints.the design, construction organization design, etc.). )

Volume b: construction quality management data; (Construction concealment, inspection records and technical disclosure)

Book c: engineering quality assurance materials; (Material factory certification documents and retest test report)

Volume d: engineering quality acceptance data; (Sub-item and inspection lot quality acceptance record)

2, if the property company needs the owner (construction unit) to provide.

1. The factory certificate and inspection report shall be provided for the use of thermal insulation bricks.

2, such as the use of waterproof materials should be submitted for inspection and provide the factory certificate, inspection report.

3, sewage and rainwater pipeline inspection and product factory certificate, inspection report.

4, drainage fittings inspection (straight pipe, elbow, tee)

Fire acceptance (not required for houses with a commercial area of less than 300m2 below 6 floors)

2, lightning protection acceptance certificate

3, water supply acceptance certificate

4. Power supply acceptance certificate

5, environmental protection acceptance (provide a set of water supply and power supply drawings.