Job Recruitment Website - Property management company - Design commitment letter
Design commitment letter
Design Commitment 1 Our company carries out fire protection design for the interior decoration of the project in strict accordance with fire protection laws and technical standards, and is responsible for the quality of fire protection design for life.
If the fire protection design of this project violates the mandatory requirements of fire protection laws and technical standards, our unit will voluntarily bear the corresponding legal responsibilities and the consequences of bad credit evaluation.
Hereby promise!
Design unit (seal):
Legal representative:
date month year
Article 2 of the design commitment XXXXXXXX:
I am the owner of the elevator apartment in building 1. I have decided to decorate my own property, and consciously pay the decoration deposit of 1000 yuan, and hereby promise to the office of Times Square Property Management Center:
1. My house decoration consciously accepts the supervision and management of Times Square Office Property Management Center;
2. I voluntarily abide by the Agreement on the Management of Interior Decoration of Times Square → Residence → Facade and the Measures for the Management of Interior Decoration of Residential Buildings of the Ministry of Construction and other relevant decoration laws and regulations;
Three, I decorate the construction waste should be bagged from the edge of the building to the garbage dump designated by the management office, and pay the construction waste removal service fee. I would never throw construction waste down from the balcony and other places. Once you find littering, you can be fined according to the regulations, with a fine of 50 at a time. 00 yuan, deducted from the deposit;
I promise not to change or modify the building structure (including beams, slabs, columns, external walls, load-bearing walls, indoor walls, etc.). ) and shall not change the appearance of the building during the renovation period;
Five, the kitchen, bathroom, floor waterproof has been closed water test and inspection, I promise not to destroy the original waterproof layer during decoration, and waterproof again, not to paper, sand, cement and other decoration garbage fall into the sewer. I am responsible for any decoration quality problems caused by decoration and water seepage in the pipes and walls of the upper and lower households. I am willing to bear all responsibilities and economic losses and deal with them in time, and the handling expenses shall be borne by me, and I will also accept the punishment and fine from the office;
Six, the installation of anti-theft net is made of white stainless steel, which will not attack the wall;
Seven, the decoration staff working in this office to ensure that obey the supervision and management of the property management center, in accordance with the provisions of the time in and out of the scene and special operations;
Eight, consciously pay the house decoration management fee of 200.00 yuan;
Nine, when I decorate, the total amount of indoor stacking materials (including coarse sand, fine sand, stone powder and cement) does not exceed 1000 kg. If it exceeds 1000 kg, after the decoration is completed, I am responsible for the cracking of beams, plates and walls, which has nothing to do with developers and property management.
Commitment:
20xx year month day
Design Commitment 3 is based on "xx". Our company will provide localization services for all operators within XX years, and complete the engineering design of communication engineering construction and design projects in an all-round way. We hereby promise:
1. Respond to the problems in the process of engineering design and implementation on the day of receiving the notice from the tenderee; For general problems, give solutions within 24 hours; For major problems, timely cooperate with the tenderee to solve them as soon as possible; We will actively assist in solving the engineering quality problems caused by reasons other than our hospital.
2. Provide all-round services-Our institute will set up a powerful working group with the technical backbone of xxxxx Communication Co., Ltd. as the main body in this engineering design work, and provide all-round technical support and technical services to the operators from the aspects of scheme determination, site investigation, summary writing and engineering disclosure.
3. Prepare a summary in the design document, which is formed by region and project stage, including the general description of the project summary and the budget summary of each item after engineering change order. The cost of writing summary has been included in the survey and design fee of each project, and it is not charged separately.
4. We will actively cooperate with the entrusting party at all stages, such as project inquiry, technical contract verification, foreign negotiation and new technology inspection at home and abroad, until the project is completed and put into production.
5. We will actively cooperate with the technical work of the entrusting party, negotiate an efficient and feasible operation mode with the entrusting party, make suggestions on whether it is technically feasible, and recommend several ways that we think are reasonable in terms of technical feasibility.
6. Our institute promises to actively cooperate with the entrusting party in the process of engineering design, do a good job of coordination with other design units that cooperate with the entrusting party, and provide all technical data needed for design coordination and cooperation in time.
7. During the project, if the entrusting party requests design changes, we will respond as soon as possible and confirm in writing.
8. Ensure to help solve the project quality problems caused by management, construction and other reasons during the project debugging as soon as possible.
9. Our institute promises that all design documents provided by our institute to the entrusting party will be independently designed by our institute, and there is no intellectual property dispute.
10. Ensure that the manufacturers or suppliers of building materials and equipment are not specified in the design documents to avoid disputes.
Commitment: xxx
Design Commitment Chapter 4 Limited Company:
We have received and carefully read all the documents in your bidding document catalogue, and we know all the agreements and related terms in the bidding documents. Now we voluntarily participate in your annual domestic road transport business cooperation bidding activities, and make the following commitments on this bidding:
1, in favor of your company's annual product domestic road transport business cooperation bidding documents.
2. Accept all binding terms of the bidding documents on the tendering units, and complete the bidding work in strict accordance with the time specified in the bidding documents.
3. Our company solemnly promises to your company that it will carefully fill in the service commitment indicators when bidding, and ensure that our company has enough ability to complete the relevant indicators. If we win the bid for the relevant line, we agree that you will draw 5% of the freight payable for the winning line every month to assess the performance of the service commitment. If our company fails to meet the bidding service commitment index, we agree that your company will deduct relevant expenses according to the requirements of the assessment plan.
4. If our company wins the bid and fails to complete the transportation instructions according to the contract requirements, you can use the second-bid unit to deliver the goods, and the difference between the actual freight and the contract price shall be borne by our company.
5. Our company agrees that your company will appoint our company as the second successful bidder according to the situation of the successful bidder in the base. If our company is unwilling to accept the specified sub-marking, we agree that your company will cancel our bid-winning qualification and confiscate our bid bond in full. If our company is a second-bid unit and fails to organize the transportation capacity in time according to the market price agreed in the contract, we agree that you will hand over some of our contract lines to other units for transportation. We also agree that your company will dispatch vehicles according to the actual market price, and the difference will be borne by our company.
6. Our company promises that after winning the bid, it will sign the transportation contract on time according to the bidding requirements and pay the full transportation risk deposit on time. If we refuse to sign the contract or fail to pay the transportation risk deposit (including insufficient payment), we agree that you will confiscate the bid deposit in full.
7. After winning the bid and signing the contract, pay the transportation risk deposit according to the contract requirements and earnestly fulfill the bidding service commitment. During the validity period of the contract, if the contract is terminated without authorization, or the contract is seriously breached or the transportation task assigned by your company is refused, you are allowed to confiscate the transportation risk deposit and unsettled freight in full and bear the economic losses caused to your company.
8. Unless a new agreement is reached, your bid-winning notice, bidding documents and this bid commitment letter will constitute the contract terms binding both of us.
9. Our company abides by every regulation of your company in the bidding process.
Bidder (official seal): legal representative (signature):
20xx year month day
Design Commitment Article 5 Dear customers:
Hello!
I'm the designer of Jiumutang Decoration Company, and I'm glad to serve you.
Family decoration is a complicated process. Like you, we are all trying to create your warm and beautiful home life.
Thank you for your trust in our company and myself. In order to let you enjoy better service, beautiful decoration effect and happy decoration journey, we solemnly promise:
1. If your time permits, we will explain the knowledge of home improvement for you in detail, so that you can fully understand the style, materials, technology and process of home improvement.
2. In the process of measuring the house on site, we promise that the measurement will be accurate and complete, and the drawing will be fast and high quality, and your detailed requirements will be recorded one by one to ensure accuracy. After the house survey is completed, we promise to do a good job of interpreting the house type and the first draft of the graphic design scheme (simple hand-drawn draft) for you within three days.
3. We promise: After you sign the design agreement with us, you will guarantee to release a full set of design renderings within one week.
If you are not satisfied with the design scheme, we promise to make unlimited adjustments until you fully approve the design scheme.
Before we sign the home improvement contract, we will explain the decoration construction contract for you in detail until you fully understand it, so as to ensure that our cooperation is truly just, fair and reasonable, fully protect your interests and let you clearly understand the consumption.
6. After signing the contract, we will provide you with a complete "home decoration solution", including a full set of floor plans, renderings, construction drawings, decoration instructions, a pre-arrangement table of decoration period, a recommendation table of brands and merchants of home supporting materials, and a procurement budget for main materials (suggested version), so that you can have a copy in your hand and decorate easily.
7. On the day of commencement, we will go to the site of your new residence and make on-site disclosure with you and the project supervisor to ensure that the design scheme and your requirements are accurately implemented and the project can start smoothly.
8. In the process of construction, we promise to accompany you in project acceptance and solve design objections and construction problems.
9. If you need us to accompany you to purchase related main materials, we are willing to cooperate unconditionally, make a good schedule in advance, and be the purchaser of your floor, bathroom, furniture, household appliances, lighting, window decorations and indoor ornaments, so that you can save money, worry and rest assured when shopping.
10. If you have any other requirements for me or our company, we will go all out to provide you with thoughtful and satisfactory service.
Our service is unlimited, and the content of the above commitment is still limited. To fulfill the above commitments, we need our professional knowledge, good attitude and efficient service, and we will go all out. Please trust me and our company!
I wish you good health and a happy family!
Design Commitment 6 xx Town Urban Planning Bureau:
In order to ensure that the planning (architectural) engineering design scheme and construction drawing prepared by our institute (company) are true and effective, our institute (company) hereby promises:
1. Main technical indicators (land area, land scope, building nature, floor area ratio, building density, green rate, building control height, total number of floors, concession, building outline size and building spacing, etc.). All the planning (construction) engineering design schemes issued by our institute (company) meet the requirements of the Notice of Planning and Design Conditions, and the construction drawings are designed according to the design schemes approved by the Planning Review Committee, with accurate data and spacing.
Two, not to contract business, not to accommodate the unreasonable demands of the construction owner, without authorization to modify the design and construction drawings. If you need to modify the planning (construction) scheme and construction drawing design, you should modify the design accordingly after the approval of your bureau according to the specific review opinions.
Three, if there is fraud, unauthorized modification of the design scheme and construction drawing behavior, voluntary in accordance with the "Regulations on the administration of construction engineering survey and design", "Jiangxi Province construction administrative punishment discretion refinement standards" and other laws and regulations to accept punishment.
Person in charge of the commitment unit: technical person in charge:
Our company () in order to ensure that () after the completion of the construction meet the requirements of the construction unit for the project quality, project review and warranty, and meet the requirements of the construction unit to the maximum extent, our company makes the following commitments to the construction unit for the project quality warranty:
After-sales service within the warranty period 1
1. 1 warranty service scope
1) The warranty content shall be implemented according to Regulations on Quality Management of Construction Projects, General Contract of Construction Projects and Warranty of Project Quality of the Ministry of Construction.
2) For construction projects within the scope of project contracting,
Enter the project quality warranty stage from the date of project completion acceptance. During the warranty period, our company will unconditionally guarantee any damage caused to the engineering entity because the project does not conform to the regulations, specifications and engineering contracts.
3) Due to engineering design, social and human factors, or the quality problems of main materials provided by Party A, or the problems beyond the warranty period of engineering quality, our company will carry out maintenance according to the engineering and technical maintenance scheme and expenses approved by the owner.
4) If the project is damaged due to force majeure (including earthquake, flood and gale with a return period of more than 50 years), the repair method shall be determined through consultation with the owner, and the construction unit and its undertaking scope shall be determined according to relevant regulations.
1.2 warranty period
1, according to the nature of the project, strictly abide by the provisions of the project construction contract and warranty, determine the warranty period of the project quality, and implement it according to the Regulations on Quality Management of Construction Projects.
1) foundation and main structure engineering, that is, the reasonable service life of the project of 50 years specified in the design style.
2) Roof waterproofing works, rooms and external walls with waterproof requirements shall be impervious for 5 years.
3) Electrical system, water supply and drainage pipelines and equipment shall be installed for 2 years.
4) The renovation project lasts for 2 years.
2, engineering warranty and service commitment
1) The products and construction provided by our company shall be carried out in strict accordance with the relevant warranty clauses in the general contract from the date of putting them into use.
2) Strictly implement the company's quality policy, adhere to the principle of customer first, provide warm and thoughtful service and be on call.
3) Establish a return visit system, make regular and irregular return visits, make no less than five return visits to the project every year, listen carefully to the opinions of the construction unit, and form a return visit record.
4) Establish the responsibility system for the maintenance engineering class by special personnel, which shall be the responsibility of the engineering department and technical department of the company.
5) Determine the accident treatment method according to the urgency of engineering maintenance events, and do the following work:
A. During the warranty period, once the finished product has problems, our company will provide the personnel and materials needed for maintenance free of charge. Promise to enter the site for treatment within 24 days after receiving the owner's maintenance notice, and formulate relevant treatment plans according to the damage degree on site. Maintain and repair the project after obtaining the consent of the owner.
B. During the warranty period, our company is responsible for the daily and regular maintenance of finished products and provides 24-hour on-call emergency maintenance service.
C. When receiving an emergency call, our company will be present for emergency maintenance within 4 hours during normal working hours; Be present for emergency maintenance within 6 hours after non-working hours.
6) Engineering warranty principles and plans
A, the principle of engineering warranty
1 During the warranty period, according to the project contract, we will take a serious attitude of "serving users, being responsible to the owner and satisfying users", guarantee with effective systems and measures, and safeguard users' interests with high-quality and fast maintenance services.
During the warranty period, our company will repair and replace the defective parts for any damage and damage caused by its own quality reasons, and bear the direct losses caused to the construction unit.
B, project warranty return visit plan
1, pay a return visit three months after the completion of the project, pay a return visit twice irregularly within one year, and pay a return visit three times after the completion of one year, make a written record of the existing problems, make a plan and carry out thorough rectification.
2. Rectify the quality problems existing in the return visit, and timely rectify the quality problems existing in the project based on the principle of customer-oriented and enthusiastic service until the owner is satisfied.
3. Implement the warranty period and after-sales service measures: conduct a quality return visit every three months, and finally form a return visit record to solve the problem in time.
To sum up, our company solemnly promises that in the project quality warranty stage, our unit will satisfy the owners on the principle of customer first. Customer satisfaction and support will be the source of our unit's survival. In the stage of engineering construction and quality warranty, our unit will always serve the owner.
Company name: Building Decoration Co., Ltd.
Date: 20xx year * month
Design Commitment 7 Our unit and the person in charge of this project promise to earnestly perform the following corresponding responsibilities during the construction of this project, and undertake lifelong quality responsibility according to law:
(a) strictly abide by the laws, regulations and mandatory standards of the state and the autonomous region on project quality, and earnestly fulfill the corresponding quality responsibilities and obligations.
(2) Carry out design business in strict accordance with the approved engineering design qualification grade and business scope, and shall not exceed the design grade and scope or undertake design business in the name of other engineering design units, and shall not allow other units or individuals to undertake design business in the name of their own units, sign engineering design business contracts according to law, and shall not subcontract or illegally subcontract the design business undertaken.
(three) design in strict accordance with the approved planning documents, survey results and engineering construction norms and standards, and never exceed the scale and standards.
(4) Ensure that the provided design documents go through strict internal audit and proofreading procedures, meet the requirements of the depth of document preparation stipulated by the state, and affix the legal and effective construction drawings with the special seal for drawing of the design unit and the seal of employees, and file the design documents and related materials in time.
(five) the materials, components and equipment selected in the design documents shall be marked with their specifications, models, performance and other technical indicators, and their quality requirements must meet the standards prescribed by the state. Except for building materials, special equipment and process production lines with special requirements, manufacturers and suppliers are not designated.
(six) according to the provisions of the construction unit and supervision unit to do a good job of design disclosure, do a good job of post-service, cooperate with the foundation inspection, foundation, main body, completion acceptance and other work of the construction project. , and submit the engineering quality inspection report of the engineering design unit on time.
(seven) actively cooperate with all parties to deal with quality problems and quality accidents. (eight) in strict accordance with the relevant provisions of the design changes, involving major changes in construction scale, industry standards, technological processes, etc., the construction unit must report to the original preliminary design examination and approval authority for approval before modifying the design changes.
(nine) the quality responsibilities and obligations stipulated by other laws and regulations.
Project leader (signature): legal representative (signature):
(official seal of the company)
Year, month, sun, moon, sun.
Design Commitment Article 8 Letter of Commitment from the fire control quality design unit of the construction project
As the fire protection design unit of (name of construction project), (name of design unit) promises to perform the following duties on the fire protection quality of this construction project:
1. Undertaking the engineering design within the scope permitted by the qualification grade, exceeding the grade or entrusting other units or individuals to undertake, subcontract or illegally subcontract the engineering fire protection design in the name of the unit;
The second is to implement the certification system of design quality system, establish the responsibility system of design quality, improve and implement the self-inspection system of fire protection design quality, strictly fulfill the management responsibility of self-inspection team, and ensure the quality of engineering fire protection design;
Three, according to the fire laws and regulations and the national technical standards for fire protection in engineering construction, the fire protection design documents that meet the requirements shall not be designed in violation of the mandatory requirements of the national technical standards for fire protection in engineering construction;
Four, the design modification opinions put forward by the construction drawing review institution shall be revised in time, and the fire protection design of the construction project that has passed the examination by the fire control institution of the public security organ shall not be modified without authorization. For the fire protection design that really needs to be revised, it shall promptly inform the construction unit to re-apply for the fire protection design review of the fire control institution of the public security organ that was originally approved;
Five, in the design of fire products and fire performance requirements of building components, building materials, interior decoration materials, should indicate the specifications, performance and other technical indicators, the quality requirements must meet the national standards or industry standards;
Six, to participate in the completion and acceptance of the construction project organized by the construction unit, and to sign the implementation of the fire protection design of the construction project.
Those who fail to perform the above fire safety duties will be punished according to the relevant provisions of Articles 58 and 59 of the Fire Protection Law. Causing harmful consequences, according to the provisions of Article 41 of the Regulations on Fire Prevention and Management of Construction Projects, in addition to accepting administrative punishment or investigating criminal responsibility according to law, it shall also bear civil liability for compensation according to law.
(Seal)
Date, year and month
Design Commitment Article 9 "Quality First, Lifelong Service" is our service tenet. In order to ensure product quality and after-sales service, and solve customers' worries, our factory has recruited talented people and brainstormed, hired a group of skilled and experienced technicians to provide after-sales service, established a complete and detailed service file for users, and managed it by computer, forming a perfect after-sales management system:
1. Guide the operators free of charge during the installation of the equipment, so as to ensure correct use, maintenance and simple maintenance.
2. During the maintenance period of machinery and equipment, professionals will regularly maintain and repair the equipment for three months to eliminate hidden dangers and let users use the products provided by our factory with confidence.
Three, our factory provides a one-year free warranty.
Four, after-sales service personnel arrived at the scene (city) within one hour after receiving the notice, and arrived at the scene within 0/2 hours from other places.
5. You must truly fill in the content of the after-sales service feedback form provided by our company, whether you need to sign for it, whether you have maintenance qualification, etc. Therefore, our factory sincerely hopes to get your strong support, and both parties will assist and supervise after-sales service. Really achieve the sincere service of "anxious users' urgency and thinking users' thoughts".
6. After the warranty period expires, our factory will, as always, provide you with quality services, and only charge for materials and labor.
Seven, our factory provides a variety of other products, manufacturers have service agencies and maintenance outlets, and have a perfect after-sales service management system to cooperate with our factory to complete after-sales service, to ensure that users can use it with confidence.
We will face our customers with better quality and better service!
- Related articles
- Is the transportation convenient in Dingyuan Mingfu? How should I get there?
- How much is the property fee of Changsha Zhongliang Zhengzhou Fu Rong?
- What's the telephone number of Tianjin R&F Edinburgh Sales Office?
- Where is Hainan Sheng Qun chess room?
- Practice of registered property manager ...
- What is the greening rate of Ziyun in Chengdu First Longhu Lake?
- 2065438+2003 Notice of Selecting 5 Vice Presidents in Guanshanhu District Township Health Center, Guiyang City, Guizhou Province
- Is Zhongshan Zhengde Sweet Water Lake a rough house or a fine decoration?
- How about Beijing Zhao Jia Property Management Co., Ltd.
- How to travel from Shaoguan, Hunan to Fenghuang?