Job Recruitment Website - Property management company - Five general model maintenance contracts
General model of maintenance contract 1
Party A:
Party B:
In order to prevent property losses caused by Party A's failure to work norma
Five general model maintenance contracts
General model of maintenance contract 1
Party A:
Party B:
In order to prevent property losses caused by Party A's failure to work norma
General model of maintenance contract 1
Party A:
Party B:
In order to prevent property losses caused by Party A's failure to work normally due to untimely equipment maintenance, Party B accepts the entrustment of Party A.. In order to ensure the normal use of Party A's equipment, Party B shall provide maintenance services for Party A's contract equipment. In order to protect the legitimate rights and interests of Party A and Party B, according to the Contract Law of People's Republic of China (PRC), Party A and Party B entered into this contract through friendly negotiation on the principle of fairness. Before signing the contract for the first time, the contract can only be signed if the equipment should operate normally. The contract is as follows:
Article 1 Instructions for Use of this Contract
1. 1 equipment system maintenance service contract;
1.2. After the contract is signed, the space reserved in the contract shall not be vacant;
1.3. Changes to the terms of this contract shall be made in writing after negotiation between Party A and Party B, and shall come into effect after being formally signed by the legal representatives or authorized representatives of both parties and stamped with the special seal/official seal of the unit contract. No party may change it without authorization. The changed part is an integral part of this contract.
Article 2 Scope of Maintenance
Because the monitoring equipment used by Party A is not purchased from Party B, Party B can only repair and maintain part of Party A's equipment.
2. 1, the equipment within the scope of maintenance are;
2.2, not within the scope of maintenance.
Article 3 Obligations of Party B:
3. 1. Party B shall give priority to on-site maintenance according to Party A's notice of failure repair of contract equipment. Party B shall arrive at the site within 8 hours within the legal working days from Monday to Saturday; Emergency needs to arrive at the scene within 2-4 hours;
3.2. Party B's door-to-door maintenance does not charge door-to-door fees and working hours;
3.3. There is no limit to the number of visits by Party B;
3.4. If any equipment cannot be repaired and used on the same day, Party B may provide temporary standby equipment until the equipment is repaired and used;
3.5. If the damaged equipment can no longer be used after confirmation by both parties, Party B shall provide equipment replacement and maintenance free of charge;
3.6. Party B shall make an equipment maintenance plan according to Party A's contract equipment, and report to Party A. In case Party A fails to notify maintenance, Party B shall carry out on-site maintenance of Party A's contract equipment according to the maintenance plan. In general, on-site maintenance service is provided once every four months. After each maintenance work of Party B is completed, the responsible persons of both parties shall sign and file separately;
3.7. All the work of Party B shall not be subcontracted to other units. Once found, Party A has the right to terminate the contract;
3.8 Tools required by Party B to maintain Party A's contract equipment shall be provided by Party B. ..
Article 4 Obligations of Party A
4. 1. Party A shall notify Party B in time when the equipment fails.
4.2. Party A shall not use spare parts and consumables that are not approved by Party B, otherwise Party B will not be responsible for the equipment failure;
4.3. Without the consent of Party B, Party A shall not invite a third party to provide maintenance services for the contract equipment, otherwise Party B will not bear the consequences and responsibilities arising therefrom;
4.4. Party A shall not dismantle the contract equipment without permission, otherwise all losses caused thereby shall be borne by Party A;
4.5. When the equipment is transferred or transferred, Party A shall notify Party B in time;
4.6. Party A has the obligation to supervise the temporary standby equipment provided by Party B. In case of artificial damage or loss during the use of Party A, all losses caused to Party B shall be borne by Party A.. ..
Article 5 Calculation method of maintenance cost
Article 6 Contract Effectiveness and Payment Method
6. 1. This contract shall be valid from the date of signing by both parties on, to the date of cancellation;
6.2. The maintenance fee shall be paid in two installments, with a cycle of half a year. Pay the first maintenance service fee within two (2) days from the date of signing this contract, that is, RMB (in words); The second maintenance service fee shall be paid within two (2) days from the date of signing this contract, that is, RMB (in words).
Article 7 exemption clause
7. 1. Party B shall not be liable for other damages and losses caused by force majeure (that is, unforeseeable, unavoidable and insurmountable objective circumstances, including but not limited to earthquake, flood, fire, war and government actions). ) or Party B's work error;
7.2. If the performance of the contract is delayed or cannot be performed due to force majeure, the party with force majeure shall notify the other party within 48 hours from the date of force majeure, and submit relevant certification materials at the same time. Neither party shall be liable for breach of contract for losses caused by force majeure, except for losses caused by delayed performance of notification obligations. In case of force majeure, one party shall notify the other party within 48 hours after the force majeure is eliminated, and both parties shall negotiate whether to continue to perform the contract;
7.3 In case of force majeure, the party with force majeure still has the responsibility to take necessary measures to prevent the expansion of force majeure.
Article 8 Liability for breach of contract
8. 1. Both parties shall perform their respective obligations in strict accordance with the terms agreed in this contract. Unless otherwise stipulated in this contract, any party's failure to perform any terms of this contract shall be regarded as a breach of contract. The breaching party shall pay the observant party 3% of the total contract amount as liquidated damages. However, the maximum amount shall not exceed 5% of the total contract price. If the agreed liquidated damages are insufficient to make up for the losses of the observant party, it shall also compensate the difference;
8.2. If one party fails to perform its contractual obligations or does not conform to the agreement, and the observant party still suffers other losses after performing its obligations or taking remedial measures, the breaching party shall compensate its losses;
8.3. If both parties breach the contract, they shall bear their respective responsibilities; ;
8.4 If one party breaches the contract due to the reasons of a third party, it shall be liable to the observant party for breach of contract. Disputes between the breaching party and a third party shall be settled in accordance with the law or in accordance with the agreement.
Article 9 Disputes and dispute settlement methods
All disputes arising from the performance of this contract shall be settled by both parties through friendly negotiation. If negotiation fails, it may be submitted to the local people's court to resolve the dispute through litigation.
Article 10 Termination of the Contract
10. 1. In any of the following circumstances, both parties may terminate this contract:
(1), where one party delays the performance of its main obligations under this contract and fails to correct the breach after the other party's written notice;
(2) Force majeure occurs, which makes the purpose of this contract impossible to achieve;
10.2. When the notice of termination reaches the other party, this contract is terminated;
10.3. If this contract has not been performed after termination, it will not be performed; If it has been performed, the performing party has the right to demand the breaching party to pay liquidated damages or compensate for the losses.
Article 11 Entry into force of contract and others
1 1. 1. If any clause of this contract becomes illegal, invalid or unenforceable at any time, but it does not fundamentally affect the validity of this contract, other clauses of this contract will not be affected, and both parties shall negotiate separately and sign a supplementary agreement on the invalid part;
1 1.2. The titles of all clauses in this contract are for reference only, and the rights and obligations of both parties shall be determined according to the clauses; 1 1.3. This contract is made in duplicate, one for each party, with the same legal effect;
1 1.4. This contract shall come into effect after being signed by the legal representatives or authorized representatives of both parties and stamped with the special seal/official seal of the unit contract;
1 1.5. For matters not covered in this contract, Party A and Party B shall sign a supplementary agreement through friendly negotiation. This supplementary agreement has the same legal effect as this contract.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
General mode of maintenance contract II
Party A:
Party B:
According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, Party A and Party B reached an agreement on air conditioning maintenance through friendly negotiation, and agreed to sign this contract and perform it as agreed by both parties.
I. Subject matter of the contract
Entrusted by Party A, Party B provides paid maintenance service for the brand air conditioning system in its business hall. The maintenance scope includes: the maintenance of the host, the terminal and the whole system.
Including: 2 business hall hosts and 10 terminals; The maintenance fee is RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Renminbi
Second, the maintenance cycle:
20 _ _ _ _ _ to 20 _ _ _ _ _.
Three. Payment terms:
Party A shall pay the full amount, i.e. RMB Yuan only, within ten days from the date of signing the contract.
Four, maintenance service standards and content:
Carry out air conditioning maintenance in strict accordance with the air conditioning system maintenance manual.
Details are as follows:
1. The air-conditioning terminal system should be sterilized, disinfected and purified once a year at the beginning of Xia Dong, so as to eliminate the breeding of microorganisms and the root of bacteria, and make the air-conditioned air sent by fans meet the air hygiene standards.
2. The host system and pipeline should be treated once a year.
Verb (abbreviation of verb) Party A's responsibility:
1. Provide convenience for Party B to enter and leave the air conditioning maintenance work.
2. Provide complete air conditioning technical data.
The intransitive verb Party B's responsibility.
1. Provide Party A with air-conditioning maintenance services in strict accordance with the company's air-conditioning maintenance manual.
2. Accept the supervision of Party A and ensure the service is in place.
3. Arrive at the site within 24 hours after receiving the repair notice from Party A..
4. The replacement of faulty spare parts shall be submitted to Party A for inspection, and only the cost of spare parts and materials shall be charged for maintenance. See spare parts price list for details.
5. There must be a maintenance order for each maintenance, which should be signed by the user department and the property department for confirmation; Maintenance items with expenses incurred outside the contract need to be signed and confirmed by the Power Department.
Seven. Termination of the contract:
A. In any of the following circumstances, Party A has the right to notify Party B in writing to terminate this contract:
1. Party A shall provide relevant property right change certificates.
2. The maintenance project has not been fully completed on schedule for more than one quarter, and there is indeed a problem identified by the municipal authoritative department.
3. Party A is unable to perform the contract due to force majeure.
B under any of the following circumstances, party b has the right to notify party a in writing to terminate this contract:
1, changed hands.
2. Party B is unable to perform the contract due to force majeure.
3. Party A is bankrupt, liquidated (except for merger or reorganization) or unable to repay the debts payable.
Eight. Liability for breach of contract:
1. If Party A breaches the contract, it shall pay a penalty of RMB only to Party B.. Party B has the right to request Party A to continue to perform this contract.
2. If Party B breaches the contract, it shall pay a penalty of RMB Yuan only to Party A. Party A has the right to require Party B to continue to perform this contract.
Nine. Other agreed matters:
1. Spare parts for air-conditioning maintenance and replacement shall be borne by Party B within RMB and Party A above RMB.
2. Party B shall not be responsible for the losses caused by the third party's air conditioning maintenance.
3. Matters not covered in this contract shall be settled by both parties through friendly negotiation.
X this contract is in quadruplicate, with party a holding three copies and party b holding one copy. This agreement shall be established after being signed and sealed by both parties, and shall come into force according to law.
Party A:
Party B:
Date of signing:
General mode of maintenance contract 3
Party A:
Party B:
According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, Party A and Party B reached an agreement on the maintenance of central air conditioning through friendly negotiation and agreed to sign this contract.
I. Overview of the Project
1. The project site is located in Shenzhen.
2. Maintenance scope: moving, testing and maintenance of the main engine; Installation of electrical auxiliary heating equipment; Processing and installation of forced exhaust cooling device for main engine; Maintenance, renovation, repair and debugging of wharf, water circulation system and air circulation system; Renovation and installation of room partition and sub-control system; Maintenance and debugging of the whole central air conditioning system. Make the system work normally.
Second, the construction time:
(1) before _ _ _ _ _ _ _ _
(2) Before _ _ _ _ _ _ _ _ _ _
(3) Before _ _ _ _ _ _ _ _ _ _ _, make the whole air conditioning system run normally.
Third, the project cost and payment method:
The project cost of this contract is 150000 yuan. (In words: one hundred and fifty thousand yuan)
Before 20th, Party A shall pay 40% of the contract price to Party B, and 50% of the contract price shall be paid to Party B after all the projects are completed, accepted and signed. ..
10% of the contract price is the quality deposit. If all the projects are completed and accepted and signed by Party A, and there are no quality problems within the one-year warranty period, Party A shall pay Party B within 5 working days after the warranty period ends.
Before the above payment is paid in full, Party B shall provide Party A with an invoice that meets Party A's requirements.
Fourth, the project quality and acceptance
The quality of this project must meet the design requirements and the construction specifications and quality evaluation standards promulgated by the state.
After the completion of the project, Party A shall conduct the acceptance according to the national industry and technical specifications.
Verb (abbreviation of verb) procurement of materials and equipment
The materials and equipment required for this project shall be purchased by Party B itself, and the materials and equipment purchased by Party B must meet the requirements of the specification, and have the product certificate and quality inspection certificate. The quantity and price of purchased parts are shown in the annex to this contract.
The rights and obligations of party a with intransitive verbs
1. Go through the inspection and valuation procedures, allocate funds and settle the project price according to the contract.
2. Supervise and inspect the quality and progress of the project, and have the right to ask Party B to stop work and rectify the quality problems and potential safety hazards found in the inspection.
3. Organize the handover of completion acceptance according to relevant specifications.
Seven. Rights and obligations of Party B
1. Check the air conditioning system, prepare the construction plan, and submit it to Party A for approval before implementation.
2, according to the terms of this contract to do a good job of material procurement.
3. Carry out the construction in strict accordance with relevant specifications, ensure the quality of the project, and complete the delivery within the time limit agreed in this contract.
4, after the completion of the project, in accordance with the provisions, provide complete completion data.
5. Adhere to civilized construction, ensure safe production, and do a good job in environmental protection and labor protection at the construction site.
6. Party B shall be responsible for repairing or compensating the damage to Party A's facilities during the construction period.
Eight. Project warranty
The warranty period of this project is one year after the project is completed and accepted and confirmed by Party A's signature. During the warranty period, Party B shall arrive at the site within 6 hours after receiving the maintenance notice from Party A. The replaced faulty spare parts shall be submitted to Party A for inspection, and Party B shall not charge for spare parts and materials unless the main engine has been repaired.
Every maintenance must have a maintenance list, which must be signed by Party A's personnel for confirmation.
In case of leakage of condensed water or liquid due to engineering quality problems, which causes property losses in Party A's room, Party B shall be liable for compensation.
Nine, safety construction
During the construction process, Party B must abide by the relevant national regulations on production safety, pay attention to the operation safety at the construction site, and avoid all kinds of accidents. In case of safety accident, Party B shall bear the responsibility.
Party B shall organize the construction according to relevant regulations or safety specifications. In the process of construction, any loss of personnel or property caused by reasons other than Party A shall be fully compensated by Party B. Party B has the construction qualification stipulated by the state to implement the project agreed in this contract. Party B's personnel who undertake the construction of this contract have corresponding qualification certificates and employment certificates. Party B shall submit the originals of the above documents to Party A for inspection, and Party A shall keep copies.
XI。 responsibility for breach of contract
Party A's liability for breach of contract
1. If Party A fails to perform its obligations as agreed in this contract, it shall compensate for the economic losses caused to Party B..
2. If the project is delayed due to Party A's reasons, the contract period will be postponed.
3. If Party A fails to pay the project payment according to the contract, which affects the project progress, Party A shall bear the responsibility.
Party B's liability for breach of contract
1. If Party B fails to complete the acceptance and delivery within the time limit agreed in the contract due to its own reasons, it shall bear the responsibility of overdue completion, and pay 0.5% of the total contract price as penalty to Party A for each day overdue until the project is delivered.
2. If the quality of the project fails to meet the design and specification requirements, Party A has the right to require Party B to rework or repair, and the expenses shall be borne by Party B. In case of overdue delivery, Party A shall pay Party A a penalty of 0.5% of the total contract price for each overdue day until the project is delivered.
3. If the project cannot be continued due to Party B's responsibility, Party A has the right to terminate this contract, and the economic losses caused thereby shall be borne by Party B. ..
4. If the relevant documents submitted by Party B according to Article 10 of this contract are invalid or false, Party A has the right to terminate this contract, and Party B shall double the amount paid by Party A. If losses are caused to Party A's personnel and property, Party B shall be fully liable for compensation.
Twelve. Dispute mediation
In case of any dispute during the performance of this contract, both parties shall negotiate in a fair and reasonable manner in time; If negotiation fails, it shall be submitted to the people's court where Party A is located for jurisdiction.
Thirteen. supplementary agreement
For matters not covered in this contract, both parties may sign a supplementary agreement, which has the same legal effect as this contract, as well as the budget and construction plan as supplementary parts of this contract.
Fourteen supplementary terms
This contract is made in duplicate, one for each party.
Party A:
Party B:
Date of signing:
General mode of maintenance contract 4
Party A: _ _ _ _ _ _ _
Party B: _ _ _ _ _ _
Through consultation between both parties, Party A agrees to entrust Party B with the maintenance, repair and emergency repair of intelligent wireless temperature measuring equipment, and both parties agree to sign the following contract:
1. Equipment maintenance: _ _ _ _ _ _
Equipment name: _ _ _ _ _ _
Equipment model: _ _ _ _ _ _
Number of equipment: _ _ _ _ _ _
2, maintenance methods and instructions:
2. 1 maintenance
2. 1. 1 Party B is responsible for the maintenance of the above-mentioned equipment, ensuring the overall maintenance once every quarter, ensuring the accuracy of temperature measurement points of the equipment, complete external equipment and accurate temperature measurement data.
2. 1.2 party b shall provide qualified maintenance technicians to inspect, maintain, maintain and repair all parts of the equipment according to regulations, so as to ensure that the equipment keeps the best running state.
2. 1.3 Party B shall provide brand-new spare parts for replacing faulty equipment.
2.2 Emergency call for maintenance
During the contract period, if the equipment breaks down and needs emergency maintenance, Party A shall immediately notify Party B to explain the situation, and Party B must arrive at the site for emergency maintenance within one day after receiving the notice. (If it is impossible to arrive under special circumstances, Party B shall explain the situation and negotiate a reasonable solution with Party A's personnel. )
2.3 related instructions
2.3. 1 during the maintenance work of party b, the operator of party a shall provide on-site assistance, and designate a special person to be responsible for the contact between the two parties to provide convenience for the staff of party b.
2.3.2 Party B shall be responsible for the cost of materials required for maintenance, but when hot welding is involved, Party A shall provide corresponding welding equipment and issue a hot work ticket.
2.3.3 During the equipment maintenance, if there is any intentional damage to the equipment, Party A shall supervise and punish it.
Party B shall pay the maintenance fee separately.
3. Maintenance period
The term of the contract is one year (from _ _ _ _ _ _ _ _ _).
4, maintenance costs and payment methods
4. 1 Total maintenance cost: _ _ _ _ _ _ RMB.
4.2 Payment method: Party A will pay 50% after the contract is signed for half a year, and the remaining 50% will be paid within 3 days after the contract expires.
5. Default handling:
5. 1 If either party fails to perform the above without justifiable reasons, it shall be deemed as breach of contract, and the breaching party shall compensate the other party 10% of the total contract price as liquidated damages.
5.2 This contract is made in duplicate, with each party holding one copy. Matters not covered shall be settled by both parties through consultation.
Signature of Party A: _ _ _ _ _ _ _
Signature of Party B: _ _ _ _ _ _ _
Date: _ _ _ _ _ _
General mode of maintenance contract 5
Party A: _ _ _ _ _ _ _
Party B: _ _ _ _ _ _
Based on the principle of equality and mutual benefit, Party A and Party B have reached the following agreement on the maintenance project undertaken by Party B through friendly negotiation:
1. Name of maintenance company: _ _ _ _ _ _.
Two. Contents of maintenance contract: _ _ _ _ _ _ _.
Three. Maintenance cycle and content: patrol once a month.
A. test the function of the automatic door.
B. detect radar sensitivity.
C. check the fastening of the door body and the rotary stop.
Four. Random event: (Arrive at the scene within 48 hours after receiving the call)
1. Electrical failure: the failure shall be eliminated within 12 hours.
2. Mechanical failure: eliminated within 24 hours.
3. Replacement of broken glass: completed within 3 days.
Verb (short for verb) maintenance program:
1. Party A shall coordinate and arrange appropriate maintenance time, which can be arranged on Saturday and Sunday.
2. Party B arranges working hours according to the working conditions, morning or afternoon.
3. After each maintenance, Party B's staff will fill in the maintenance records, and Party A's staff will check them one by one and sign the records to complete the maintenance work.
VI. Replacement cost:
1. Party A shall bear all replacement costs.
2. Party A has the right to purchase parts by itself.
3. Party A has the right to ask Party B to buy spare parts.
Seven. Maintenance fee: the annual maintenance fee is RMB _ _ _ _ _ _ (_ _ _ _ _ _ _ _).
Eight. Payment method: Party A shall pay Party B RMB _ _ _ _ _ _ _ _. Pay off the balance within one week after the expiration of half a year. RMB: _ _ _ _ _ _ Yuan only (_ _ _ _ _ _).
Nine. In case of special circumstances during the execution of the contract, the above terms cannot be implemented, and both parties shall negotiate to solve them.
X this contract is made in duplicate, one for each party, and shall come into effect as of the date of signature and seal by both parties.
Party A (seal): _ _ _ _ _ _
Party B (Seal): _ _ _ _ _ _
Representative (signature): _ _ _ _ _ _
Representative (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Relevant clauses of General Model 5 of Maintenance Contract:
★ Five new maintenance contracts were added.
★ Five maintenance service contracts for model equipment.
★ 4 Model maintenance contract for general facilities and equipment.
★ 5 model after-sales service contracts
★ Five general modes of standard maintenance contract
★ 5 practical equipment maintenance service contract templates
★ 4 copies of general maintenance contract model
★ Five formal equipment maintenance contract formats
★ 5 copies of model equipment maintenance contract.
★ 5 model after-sales service contracts
- Previous article:Yanjiao's better real estate
- Next article:Where is a good old Chinese doctor in Zibo? Boshan is the best, and Zhangdian's is also ok.
- Related articles
- How to get to No.528, East Outer Ring Road, Xiyuan Second Village, Jiangyin City?
- When can I get the real estate license when I buy a house in Dongguan Emerald Garden? What's the residential environment like? Suitable for a family of five. ...
- What punishment will property monitoring owners receive for violating their privacy rights?
- Basic information of Platinum Bay Building
- What are the requirements for applying for affordable housing in Hainan Province?
- Is there a toilet in the dormitory of Beijing Forestry University?
- Which company is Tai 'an Hengdi Xiyue developer?
- How to treat girls with leaking paper balconies?
- What about the surrounding facilities of Xiaogang New Village Community in Shanghai?
- Is the "first horse" in early spring? Treat Yangling with a pillow &; The 3rd Cheetah Spring Marathon is not a competition.