Job Recruitment Website - Property management company - Owner's commitment letter for decoration
Owner's commitment letter for decoration
With the gradual development of society, commitment letters are used more and more widely, and the contents of different commitment letters are also different. Do you know the format of the letter of commitment? The following is the owner's commitment letter I collected for you for your reference, hoping to help friends in need.
Owner's Decoration Commitment Letter 1 I am the owner of XX _ _ _ _ _ _ _ _ _ _ _, and now I apply to the management office for renovation and renovation of my house and garden. I solemnly promise to the management office: I have clearly known the forbidden behavior and precautions of the decoration project, and I will strictly implement the laws and regulations promulgated by the state and the XX decoration management regulations and precautions in strict accordance with the approved drawings.
If there are illegal acts such as erection, expansion and erection, I am willing to accept the shutdown of the management office and prohibit construction personnel and materials from entering the park, and bear all the responsibilities and expenses arising therefrom.
Hereby promise
Owner: _ _ _ _ _ _
Certificate number: _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Owner's commitment letter for decoration 2 Owner's commitment letter for decoration
In order to maintain a beautiful, clean and orderly environment in the residential area (hereinafter referred to as the residential area), I promise to observe and promise the following matters in the process of residential building decoration and construction:
I. General principles
1. Before decorating the house, please read carefully the provisions on decoration management in the Temporary Convention for Owners and the Owner's Instruction Manual, and carry out the construction according to the above provisions.
2. Before the house is decorated, learn more about the construction drawings such as water and electricity of the house.
3. Have the right and obligation to supervise the decoration construction unit to carry out civilized construction, and bear joint liability for the losses caused by the decoration construction unit in violation of the regulations on community management.
4. Actively cooperate with the decoration inspection of the management office.
5. In case of any violation, the management office has the right to stop the construction, and requires the owner and the decoration construction unit to resume within 24 hours.
Second, the air conditioning installation
1. When installing the air conditioner, notify the management office (tel: _ _ _ _ _ _) and install the air conditioner under the guidance of the management office.
2. When purchasing air conditioners, the size of outdoor air conditioners provided by the management office shall prevail (for reference only).
Third, fire management.
1, responsible for the fire safety responsibility during the decoration construction, to ensure that there is no fire and fire accident.
2. The construction area should be equipped with fire fighting equipment, and the number of portable fire extinguishers should be at least two.
3, put an end to smoking in the construction area.
4, if you need to use flammable items in the construction, be sure to do a good job in the storage of flammable items in advance, the storage of items can not be too much, limited to the usage of the day. After the construction is completed, the remaining items must be taken away from the site.
5. Ensure that the decoration garbage in the construction area is cleared on the same day, especially the shavings and sawdust, so as to ensure the cleanliness of the construction site.
6. Construction waste or garbage should be cleared to the designated area of the management office in time to avoid blocking the fire escape.
7. Take good care of public facilities in the community, and do not block, damage or misappropriate fire control facilities.
8. Be familiar with the fire-fighting facilities and equipment in the community.
Four. any other business
1. Comply with the regulations on residential decoration management and go through the decoration procedures according to the decoration process.
2. Abide by the time regulation of decoration and construction in the community, and do not engage in construction that produces serious noise from 18: 00 to 8: 00 the next morning and holidays, so as not to affect others' rest.
3. The bearing wall shall not be removed (or partially removed), and the bearing wall, beam and column shall not be excavated, cut or bored to damage the building structure.
The balcony is not closed when decorating.
5, don't change the color and structure of the glass window, don't install the shutter door.
6. Indoor building walkie-talkies, home security control boxes and indoor intelligent equipment boxes shall not be dismantled and moved by themselves. If you tear it down yourself, you're responsible.
7. In the ceiling of the kitchen and bathroom, in order to ensure the normal maintenance of the pipe manhole, there should be a maintenance personnel operation hole (50×50×50cm) in the ceiling for future maintenance.
8. Satellite antenna and solar water heater are not installed.
9. Don't install things beyond the external wall on the balcony, such as clothes hangers, flower stands, awnings, etc.
10. During the renovation, urge the renovation construction unit: garbage, paint, coating, lime, mud, etc. It is forbidden to pour into the sewer pipe to prevent the pipe from blocking, otherwise the corresponding responsibilities will be borne by yourself.
1 1. Construction garbage and materials shall not be mixed with domestic garbage, and shall not be randomly stacked in public places, so as not to affect others and fire safety. Construction waste must be bagged and transported to the designated stacking place of management office in time.
12, don't make holes through the wall within 50CM of the inlet box, so as not to puncture the original pipeline.
13, it is obliged to prevent the decoration construction unit from posting advertisements, so as not to affect the landscape of the community.
14, waterproof work should be done during decoration (the management office suggested to do secondary waterproofing).
15, after the decoration is completed, go through the opening formalities of the indoor intelligent system in the management office.
16. Pay attention to the construction when decorating doors and windows, so as not to damage intelligent pipelines and facilities (owners on the first and second floors).
Commitment (Owner): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
date month year
Owner's commitment letter for decoration 3 In order to protect the overall legitimate rights and interests of all owners of XX Cai Yi Garden from infringement and facilitate the management of the decoration engineering team, the management office of XX Cai Yi Garden of Guangzhou XX Property Management Co., Ltd. (hereinafter referred to as Party C) has formulated a commitment letter for decoration construction. All renovation owners (Party A) and renovation contractors (Party B) employed by the owners must sign this letter of commitment with Party A. ..
1. In the process of decoration design and construction, Party A and Party B promise not to damage the rights and interests of adjacent buildings, the community public, the developer and Party C, otherwise they will unconditionally restore the original state and compensate the infringed.
2. Party A and Party B guarantee that all construction personnel of the construction unit must be law-abiding citizens with no criminal record and complete certificates.
3. Party A and Party B promise to abide by all the management regulations of Cai Yi Garden, such as Management Convention, Owner's/Residential User's Manual and Decoration Guide. In case of violation, Party B is willing to bear the compensation liability claimed by Party C according to the above public information.
Four. Party A and Party B promise to carry out decoration construction in strict accordance with the approval opinions of Party C, otherwise Party C may take any measures to prevent the unauthorized decoration project from continuing construction, and reserve the right to investigate any damage caused by this behavior of Party A and Party B. ..
Verb (abbreviation of verb) Party A guarantees that Party B is a legal entity with legal operation and complete licenses.
6. Party A promises to buy all risks and third party liability insurance for the house under its name during the renovation period or bear all losses incurred during the renovation period.
7. Party A shall supervise Party B to equip the renovated room with fire extinguishers (at least 2 fire extinguishers per household) and other fire fighting equipment, and take fire prevention measures; Otherwise, Party A will not allow Party B's personnel to enter the site for construction. Party B's personnel shall not use fire in violation of regulations, otherwise, in case of fire, all responsibilities shall be borne by Party B, and Party A shall bear joint and several liabilities.
Eight. Party B promises that the renovation construction time is from Monday to Friday at 8:30- 12:00, 14:00- 19:00, and Saturday 10:00-20:00, and no construction will be carried out at other times. Otherwise, Party A may take all necessary measures.
Nine. When Party B enters the residential area for decoration construction, he is willing to go through the formalities of decoration declaration and pay the deposit, decoration garbage cleaning fee and other expenses, otherwise Party C has the right to refuse Party B's personnel to enter the site.
X. Party B promises to keep the public places in the community clean, including stairs, public walls and floors, and shall not dump sewage and 1 page 6/23/20xx construction waste into the public areas, otherwise it will be immediately and unconditionally restored, and it is willing to accept compensation from Party A. The decoration waste shall not be discarded at will, and it shall be transported to the designated point of the management office by manpower (it is not allowed to hire foreign unlicensed personnel to carry it).
XI。 Party B's personnel shall not interfere with the work of other units, wander in the public areas and corridors of the community, or stay outside the floor where the decoration unit is located. Otherwise, Party C has the right to confiscate the person's pass and deal with it accordingly. 12. Party B's personnel shall keep the building facilities intact and beautiful, and shall not dismantle or damage all kinds of public facilities. Otherwise, Party B will unconditionally restore to its original state and accept the compensation for the increased management workload required by Party C in 30 yuan/Office.
13. Party B's personnel shall not spend the night, stay, make a fire and cook or engage in any illegal activities in the community. If it is really necessary for Party B's personnel to stay overnight due to special circumstances, it shall obtain the consent of the management office in advance, otherwise Party C shall investigate Party B's management responsibility according to 50 yuan/person-time.
14. The construction personnel of Party B shall be under the management of the management office personnel. If there is any dispute between the two parties over the handling of certain matters, it shall be settled through consultation between the construction director and the management office under the condition of unconditional immediate shutdown. Otherwise, Party A has the right to take all necessary measures.
15. During the renovation, Party B shall bear any safety accidents and criminal responsibilities of Party B's personnel.
16. Party C has the right to check the construction situation of the decoration users at any time during the decoration construction, and implement the management behavior according to the management convention, owner's manual and decoration guide of XX Cai Yi Garden.
17. This letter of commitment shall come into force for the signatory from the date of signature by either party.
Party A:
Legal representative:
Date of signature: 20XX year month day.
Party B:
Page 2 Party C: Guangzhou XX Property Management Co., Ltd. XX Cai Yi Garden Management Office 20xx June 23rd.
Decoration/Form 2
Signature representative:
Date of signature: year month day.
Owner's renovation commitment letter 4: xx home is occupied by the owner and the property management company.
For the benefit of the community owners and their own interests, make the decoration meet the construction requirements, and avoid damaging public facilities and blocking drainage pipes during the decoration construction. According to the requirements of "Regulations on the Administration of Adjoining Houses with Different Properties in Cities" and "Regulations on the Administration of xx Family Decoration", I agree and promise as follows:
1. Promise to submit relevant renovation drawings and data schemes to the property management company and accept their review, and implement them in strict accordance with the submitted review scheme;
2. Promise to carry out decoration construction in strict accordance with national regulations and decoration agreement;
3. If you need to change the heating, you should first notify the property management company and implement it in accordance with the property management company and relevant regulations. Otherwise, I will bear the losses and influences caused by myself.
4. Promise not to dismantle and change the main heating pipeline and fixed facilities without permission, and not to package the heating. If packaging is carried out, when the property management company needs to repair public pipelines and lines, I will dismantle and repair the packaging department by myself, and the expenses will be borne by myself;
5. promise to change the heating and add closed pipes. If the heating is packaged, the heating cover should be larger than the radiator, and the inspection port should be convenient for the activities of tools such as pipe tongs and easy to maintain;
6. I guarantee that the reformed heating system must meet the heating system standard of this community. After the heating transformation, the indoor temperature is not up to standard, and I am responsible;
7. The promised heating location, time, heating mode, technical parameters and heating pipeline changes conform to the original design standards, and the main pipe is straight and the material is the same as the original design;
8, commitment to heating change by qualified construction unit construction, and property registration;
9. I promise that I will be responsible for the quality problems and all related losses caused by replacing the heating, and the property management company will not bear any responsibility;
10, promised that when changing the circuit, the wiring must pass through the pipe, which will not cause damage to the civil structure.
Destroy and keep the original box, and provide the modified drawings of the circuit when it is completed;
1 1. Promise that when changing the waterway, if the water pipe is buried in the wall, the wall must be waterproof first, and the valves and water meters should be placed in the maintenance position;
12, promise not to change sewers and floor drains without permission. If it is changed, the consequences will be handled by yourself;
13, promised to keep the kitchen closed, and not to seal the gas pipeline without permission, to change it without permission, and not to use it for other purposes without permission;
14. When undertaking to seal the sewer pipe, there should be inspection ports at the valve and the inspection port of the sewer pipe;
15, promised not to disturb the people during the construction period, and consciously accepted the inspection items of the property personnel's decoration inspection, and went through the relevant formalities;
16. The conclusion, interpretation and dispute settlement of this Letter of Commitment shall be governed by and protected by the laws of People's Republic of China (PRC).
I have read and agreed to the above terms.
Signature of the promisor:
Date of signature: year month day.
Owner's Decoration Commitment 5 * * * Management Office:
I am the owner of the * * * management office building, I think.
Require self-decoration, entrust Mr./Ms. to be responsible for the construction site.
Person in charge, I guarantee that Mr./Ms. and her construction personnel are installing it.
During the maintenance period, consciously abide by the rules and regulations of the management office, and promise that if due to the above engineering and decoration,
I will be responsible for all the responsibilities caused by the construction personnel during this period. What happened during the renovation?
All economic and other legal responsibilities shall be borne by myself and have nothing to do with the management office.
We hereby promise to ask you to handle it.
Signature of the Contractor (Owner): Date:
Owner's commitment letter for renovation. If the owner's house needs decoration, he must fill in the decoration approval form and apply to the community management office. At the same time, he must provide decoration engineering, decoration graphic design and a copy, and the decoration can only be carried out with the consent of the management office.
Second, before the decoration construction team comes into play, they must go through the decoration formalities at the management office. The construction team shall provide the valid certificate of the construction unit, the list of construction personnel and a copy of ID card, and designate the person in charge of construction (contact person or communication method). When electricity is needed for decoration or welding, the relevant certificates of the construction personnel (copy of electrician certificate, welder certificate and hot work certificate) are required. With the consent of the management office, temporary passes (paying the pass fee and management fee, each 5 yuan) can be used for construction.
Three, the owner shall ensure that the construction is carried out in accordance with the contents and drawings approved by the decoration, and shall not change the project without authorization, especially shall not damage the main structure and facade of the original building, and shall not endanger the safety of the building and affect the normal life of neighbors (such as leakage, wall and ground cracking, perforation, etc.). ). If found, the owner should give maintenance unconditionally, and serious violations will be handled by relevant government departments.
Four, do not change the original direction and position of the water inlet, drainage pipe and sewage pipe, and do not close the inspection port of the water inlet, drainage pipe and sewage pipe. If the water inlet, drainage pipe and sewage pipe are affected and maintained in the future, the owner is unconditionally responsible for eliminating, maintaining and repairing them.
5. Don't connect the public power supply and water source indiscriminately. Without the written consent of the management office, it is forbidden to change the electric meter and water meter in front of the owner's house without permission. Pay attention to safety before welding and hot work, and do a good job of setting fire (portable fire extinguishers with a standard weight of more than 3 kg should be equipped during construction). Otherwise, the consequences will be serious, and the owner will take full responsibility.
6. The renovation time of the owner's residence is: 8: 30 to 12: 00, and in the afternoon 14: 00 to 18: 00. During the decoration project, safety and civilized construction must be ensured. During the non-construction period, there shall be no construction noise, no construction sundries and objects falling from the sky, and no mud and garbage shall be thrown into buildings and public places. The owner shall be responsible for cleaning up the dirt, garbage and sundries left in public places. In violation of regulations, the management office gave verbal criticism and issued a notice of violation for the first time, and issued a notice of violation for construction for the second time. Deduct the construction deposit for each item, 50 yuan. After the second dissuasion failed, 500 yuan was fined for the third falling object.
Seven, the use of elevators to transport building materials, garbage, the height shall not exceed 2.3 meters, the weight shall not exceed 1500 kg. Garbage disposal should be sealed with packaging bags, and should not be discarded anywhere, and piled up according to the instructions of management personnel. Every time sundries and garbage are removed immediately on the same day, offenders will be fined 50 yuan for construction deposit. When handling materials and cleaning up sundries, elevator equipment and facade materials shall not be damaged, and the wall facade shall not be touched or damaged. Otherwise, the owner will unconditionally carry out maintenance and restore to the original state.
Eight, if there is a violation of working hours, the community management office has the right to take necessary measures to correct it until the construction is prohibited. The owner shall bear all economic and legal responsibilities for the consequences caused by violation of the terms.
Nine, the owner pays the construction deposit after the construction period, the owner uses it for three months and confirms that the construction quality has not affected other owners. With the receipt of the construction deposit, he will go to the management office to retrieve the deposit principal.
X. This letter of guarantee shall be held by the owner and the management office respectively, and shall come into effect after being signed and confirmed.
Owner (signature): xxx
Person in charge of construction (signature): xxx
Management Office (signature and official seal):
Owner's Commitment Letter 7 I (the unit) am the owner (tenant) of the building unit 1, and now I apply for purchasing goods.
I have carefully read the regulations formulated by the management office of Chongqing Property Management Co., Ltd..
Service Agreement on Interior Decoration Management of Residential Quarters, Decoration Guide, etc.
Management system, and make the following commitments:
1. Go through the decoration formalities in strict accordance with the procedures in the decoration guide, and carry out the decoration in strict accordance with the contents of the decoration declaration.
2, according to the requirements of the management office to pay all the expenses, in addition to the fees payable by the operator, but also to replace the decoration construction team to pay all the decoration deposit, as well as decoration management fees, garbage clearance fees, temporary pass fees and other expenses.
3. Strengthen the fire safety measures during the decoration, supervise the civilized construction of the construction team in strict accordance with the decoration management regulations, and be responsible for the management of the construction personnel.
4. If public facilities and equipment (including fire-fighting facilities, public walkways, ceilings, etc.). ) I will be responsible for repairing the damage caused by my decoration in this community to ensure the restoration of its original functions. If I entrust the management office with the maintenance, all the maintenance costs will be borne by me.
5. If the interests of other owners (tenants) are damaged due to my renovation, I shall be responsible for all the compensation expenses and bear all the consequences arising therefrom.
Commitment (unit):
Number of community building units
Date:
Owner's renovation commitment letter 8 Dear customers,
Hello!
I am the chief designer of xx Decoration Company, and I am glad to serve you. Home improvement is a simple and complicated project. Like you, I strive to create a warm, healthy and beautiful home life for you.
Here, I sincerely thank you for your trust in our company and myself. In order to let you enjoy the decoration achievements with low price, excellent construction and thoughtful service and a pleasant decoration journey, I would like to make the following commitments on behalf of the company:
1. If your time permits, I will explain the popularization of home improvement knowledge for you in detail, so that you can fully understand the materials, technology, process, design style and related decoration knowledge of home improvement.
2. In the process of measuring the house on site, I guarantee that the measurement is accurate and complete, and the drawing is fast and high quality. I will record your detailed requirements one by one to ensure accuracy. After the house survey is completed, I promise to do a good job of interpreting the house type and drawings for you within 24 hours.
After you sign the design agreement with us, I promise to make a complete set of design renderings within one week.
If you are not satisfied with the design scheme, I promise to make the most perfect adjustment until you are satisfied with the design scheme.
Before we sign the home improvement contract, I will explain the decoration construction contract for you in detail until you fully understand it, so as to ensure that our agreement is just, fair and reasonable.
6. After the contract is signed, I will provide you with a complete "home decoration solution", including a full set of floor plans, renderings, construction drawings, decoration instructions, pre-arranged schedule of decoration period, home supporting materials, and a full set of budget. Let you take care of home improvement easily.
7. On the day of commencement, I will go to the site of your new residence to make on-site disclosure with you and the construction personnel. I promise to be there on time and make a detailed and comprehensive disclosure so that our project can start smoothly.
8. In the process of construction, I promise to accompany you throughout the project acceptance and solve design doubts and construction problems.
9. If you need me to accompany you to purchase related main materials, I am willing to fully cooperate and arrange time in advance to be the purchaser of your furniture, household appliances, lighting, window decorations and indoor accessories, so that you can feel more at ease when shopping.
10. If you have any other requirements for me or our company, I will try my best to provide you with thoughtful and satisfactory service.
The service is unlimited, and the content of the above commitment is still limited. To fulfill the above commitments, I need professional knowledge, good attitude and efficient service quality. I will go all out, please believe me! Let's create a relaxing and enjoyable renovation journey together!
In order to ensure the construction quality of this project, the person in charge of this project solemnly promises that he will be responsible for the quality and warranty within the scope of this project according to the construction contract. The basic contents of the commitment are as follows:
1. Obtain the qualification certificate of corresponding level according to law, and undertake the project within the scope permitted by its qualification level.
2. Establish a quality responsibility system and be responsible for the construction quality of the construction project. Require the project leader to record the construction site and record which part of the project is responsible for the construction. Once this part of the project has construction quality problems, the project leader should pay relevant responsibilities for this part of the project, and the project leader has the responsibility to take.
3, according to the engineering design drawings and construction technical standards, do not modify the engineering design without authorization, do not cut corners. In the process of construction, if mistakes are found in design documents and drawings, comments and suggestions shall be put forward in time.
4, according to the engineering design requirements, construction technical standards and contract, all kinds of materials, and components, without inspection or inspection unqualified shall not be used.
5, establish and improve the construction quality inspection system, strict process management, completes the concealed engineering quality inspection and record.
6, establish and improve the education and training system, strengthen the education and training of employees, without education and training or examination unqualified personnel, shall not work at his post.
7, according to the law to fulfill the obligation of building decoration engineering quality warranty.
8. During the warranty period, Party B shall unconditionally perform the maintenance obligations in full and free of charge, and shall not shirk or delay Party A's maintenance projects for any reason.
time
- Previous article:I work as a security guard in Poly Property, and my resignation expires next month. Now my colleagues at work have given me a red envelope for starting work in 500 yuan, but I didn't. Did my superviso
- Next article:Shanghai Zhao Hai Tian Yun Health Management Consulting Co., Ltd. Recruitment information, how about Shanghai Zhao Hai Tian Yun Health Management Consulting Co., Ltd.
- Related articles
- What is the specific information of the Earl's Office in Shanghai?
- Wendi Deng and Murdoch divorced? How much did you get?
- How about China Railway Siyuan Group Real Estate Development Co., Ltd.?
- Which community does Wangjing Hua Ting in Yining City belong to?
- Is Yuncheng Tiantaiyi Beiyuan worth buying?
- How many years is the property right of Nanyang Dengzhou?
- Is it legal for Nanxiong Ding Yu Real Estate Development Co., Ltd. to buy parking spaces without property rights?
- What is the difference between property satisfaction and owner satisfaction?
- Brief introduction of Changjiang Industry (Group) Co., Ltd.
- Analysis on the factors affecting the qualification and growth rate of Zhuxian mobile game pets