I. Regulations on Quality Management of Construction Projects adopted by the 25th executive meeting of the State Council.

Article 49 The construction unit shall, within five days from the date of completion and acceptance of the construction project, submit the completion and acceptance report of the construction project and the approval documents or permission documents of the planning, public security, fire protection and environmental protection departments to the construction administrative department or other relevant departments for the record. If the construction administrative department or other departments find that the construction unit violates the relevant state regulations on the quality of construction projects at the time of completion and acceptance, they shall be ordered to stop using it and reorganize the completion and acceptance.

Fifty-eighth in violation of the provisions of this Ordinance, the construction unit has one of the following acts, shall be ordered to make corrections, and impose a fine of more than 2% and less than 4% of the contract price of the project; If losses are caused, it shall be liable for compensation according to law:

1, without organizing the completion acceptance, delivered for use without authorization;

2, unqualified acceptance, unauthorized delivery;

3, unqualified construction projects in accordance with the acceptance of qualified projects;

Two, the Ministry of construction "urban residential area completion comprehensive acceptance management measures"

Sixth residential areas completed comprehensive acceptance must meet the following requirements:

1, all construction projects are completed according to the approved residential planning and related professional management and design requirements, and meet the use requirements;

2, residential and public facilities, municipal public infrastructure and other single projects are all qualified, and the acceptance information is complete;

3. The plane position, facade modeling and decorative colors of all kinds of buildings meet the approved planning and design requirements;

4. All construction machines and tools, temporary works, residual soil of buildings and remaining components shall be removed and transported away, and the site shall be cleared and leveled;

5. The relocated residents have been reasonably resettled.

Three. Provisions of the Ministry of Housing and Urban-Rural Development on National Residential Quality Acceptance Standards

Article 7: Except for the reserved pipes, there is almost no description of water supply and drainage facilities in the blank house, and no bathroom appliances are installed. The owner pays attention to the following contents:

1. Inspection of existing valves and faucets: whether the position is reasonable, whether the opening and closing are normal, whether the waterway is unblocked, and whether there are any phenomena such as damage, corrosion, sliding button failure and dripping;

2, whether the pipeline is fixed firmly, whether the installation is straight and tidy, whether the pipeline is damaged, whether the joint is in good condition;

3. Whether to reserve water plugs, pipes, etc. Considering the size of the decoration surface, whether the water plug is opened;

4. Water meter inspection: whether the water meter installation conforms to the specifications, whether the water meter joint is tight and intact, and whether there is idling phenomenon;

5. Drainage pipeline inspection: whether the drainage pipeline has right angles and dead angles; Whether the joint is tight and intact, whether there is leakage at the interface, whether the pipeline is unblocked, whether the pipeline is fixed, installed neatly and undamaged; Whether the extension pipeline upstairs is too long or too low affects the decoration;

6. Detection of drainage pipe and floor drain: whether there is floor drain, whether the floor drain position is reasonable, whether the drainage pipe and floor drain are complete and whether the seal is tight;

7. The drain pipe should be blocked to prevent garbage from entering the drain pipe.

The above regulations are for reference only, so it is suggested that you solve such problems through reporting by reporters.