Is there an electric meter for fire fighting?
Legal analysis: national regulations on the installation location of electric meters;
1, installed on the switch cabinet: the height should be 1.4~ 1.7 meters, and it is not allowed to be less than 0.4 meters.
2. The temperature of the installation site should be between 0℃ and 40℃. The distance from the heating system should not be less than 0.5m, and generally it should not be installed outdoors.
3. The installation shall be vertical, and the inclination shall not be greater than 10.
When several watches are assembled together, the distance between them should not be less than 60mm.
5. If the instrument is installed by current transformer, the secondary circuit should be separated from the relay protection circuit. Secondary current should use insulated copper wire, the cross section is not less than 2.5mm2.
6. Requirements for secondary circuit of measurement: Copper wires must be used for secondary circuits of current and voltage transformers for measurement. The cross section of the voltage secondary circuit conductor should not be less than1.5mm2; The conductor section of the current secondary circuit shall not be less than 2.5mm2 When measuring the voltage transformer, the specified voltage drop of the secondary circuit shall not exceed 0.5% of the secondary rated voltage; For a class of users, the voltage drop is required not to exceed 0.25% of the rated voltage.
7. Electric energy meters are not allowed to be installed in the following occasions: inflammable and explosive dangerous places; Dangerous places with corrosive gas or high temperature; Where there are magnetic fields and dust.
Legal basis: Article 25 of the Measures for the Administration of Rural Power Grid Renovation and Upgrading Project, the investment in the renovation of meter boxes and meters shall be included in the investment plan, and the lines and facilities behind the meter shall adopt qualified products or farmers' investment. Project legal persons and any other units and organizations shall not charge farmers in violation of regulations, and it is strictly forbidden to force farmers to contribute capital.
People's Republic of China (PRC) electricity method
Article 5 The construction, production, supply and use of electric power shall protect the environment according to law, adopt new technologies, reduce the discharge of harmful substances and prevent pollution and other public hazards.
Thirty-first users should install electricity metering devices. The user's electricity consumption shall be subject to the records of the electric energy metering device legally recognized by the metrological verification institution.
The design, construction, installation and operation management of user power receiving devices shall conform to national standards or electric power industry standards.
- Related articles
- Where is the original site of Hechuan Flower Bed Olympic Park?
- Overview, advantages and disadvantages of crystal pedestal in Litong era
- How much is the property fee of Anqiu Shuxiang Jiayuan Community?
- What is the salary of two thousand yuan a month in Qingdao?
- How about Yuexiu Lingnan Juantingyi Mansion? OK or not? Is it worth buying?
- What is the telephone number of the sales office of Foshan Hongyangde Shangxinyue House?
- What about the real estate in Hefei Fantasia Year?
- How about the supporting facilities around the fourth district of Changshu Huyuan New Village?
- How about Fuzhou Anyuanju Property Management Co., Ltd.
- The outdoor rainwater pipe is broken and the indoor property is damaged.