Emergency Plan for Typhoon Safety in Property Community
In daily study, work and life, some unexpected things will inevitably happen. In order to control the development of the accident, it is necessary to make an emergency plan in advance. What problems should be paid attention to in compiling emergency plan? The following is the emergency plan for typhoon safety in the property community I compiled for you. Welcome to draw lessons from and refer to. I hope it helps you.
Emergency Plan for Typhoon Safety in Property Community 1 1. Purpose:
Establish an emergency plan for flood prevention and typhoon rescue, strengthen the flood prevention and rescue ability of the management service area through the training and actual combat drills of emergency teams, eliminate dangerous situations more effectively and timely, reduce losses to a minimum, and ensure that the flood prevention and typhoon rescue work is foolproof.
Second, responsibilities:
The director of the management office is the commander-in-chief of flood prevention and typhoon rescue;
The person in charge of the management office is the deputy commander, who is responsible for the overall work of the equipment group;
The safety promoter is the deputy commander, responsible for the overall work of the rescue team;
The environmental organizer is the deputy commander-in-chief, responsible for the overall work of the logistics team;
The control center is responsible for the accurate transmission and coordination of information;
All off-duty personnel in the management office are emergency rescue team members for flood prevention and typhoon prevention.
Third, the division of responsibilities of the group:
3. 1 rescue team: it is composed of all the off-duty safety officers in charge of safety.
3. 1. 1 Take all measures to deal with the dangerous situation;
3. 1.2 Responsible for filling, handling and stacking flood control sandbags;
3. 1.3 use various methods to eliminate dangerous situations in time.
3. 1.4 Division of labor
3. 1.4. 1 Two off-duty central posts are responsible for loading sandbags;
3. 1.4. 2 2 No.2, No.3 and No.4 are responsible for transporting sandbags;
3. 1.4.3 Two off-duty No.6 and No.8 are responsible for piling sandbags on site and taking other measures for emergency rescue;
3. 1.4.4 The safety sponsor leads the rescue team to take all other effective methods to do all rescue work well.
3.2 Equipment group: consists of the manager of the management office and two technicians of the management office.
3.2. 1 Responsible for starting various pumps and power supply equipment;
3.2.2 Provide technical guidance to the rescue site;
3.2.3 Conduct emergency maintenance on the field equipment.
3.3 Logistics Group: It consists of environmental sponsors, domestic helpers, lifeguards, front desk attendants, cashiers and club attendants.
3.3. 1 Ensure the normal supply of all kinds of relief materials;
3.3.2 Be responsible for the rescue of the wounded on site;
3.3.3 Actively assist other groups;
3.3.4 Division of labor
3.3.4. 1 Two off-duty No.5 posts are responsible for logistics and material support;
The front desk attendants, cashiers and club attendants in 3.3.4.2 are responsible for evacuating people and rescuing the wounded, transferring the wounded to a safe place and reporting to the municipal emergency center in time;
In 3.3.4.3, lifeguards and domestic helpers are responsible for property rescue.
3.4 personnel on duty
4. 1. 1 When the personnel on duty find the danger, they shall promptly notify the center and the leaders on duty;
4. 1.2 After receiving the information, the attendant in the center shall take emergency gathering and other measures to call off-duty personnel to relieve the danger in time;
4. 1.3 The personnel on duty in the center shall immediately notify the management office manager, management office supervisor and safety director;
4. 1.4 center attendant reports to each duty post;
4. 1.5 Maintain the order of posts on site and guide personnel and vehicles;
4. 1.6 The attendant in the center should pay close attention to the site situation and seek other support when necessary.
4. 1.7 Before the typhoon comes, all posts in the management office should carefully check the potential safety hazards within their posts, eliminate the danger in time, and report the serious cases to their superiors in time.
Note: all members must obey orders, obey orders; All members should pay attention to their own safety during emergency rescue.
Emergency plan for typhoon safety in residential quarters 2 1. After receiving the warning signal of typhoon or rainstorm, the property service company should immediately mobilize, and all departments are in a state of war. At the same time, a command group manager should be set up as the chief commander, and the heads of various departments should be members. Relevant personnel should implement a 24-hour duty system and prepare for flood control and disaster relief.
2. Before the typhoon or rainstorm comes, measures should be taken to prevent wind and prevent water immersion, such as: do emergency work for wind and prevent water immersion, close doors and windows, and check and clean up flood drainage equipment, facilities, advertising signs, flower pots, etc.
(1) Check whether all doors and windows, especially double-door glass doors, are adequately protected and stable.
(2) Fix all items that are easy to loosen, especially those located on the roof and balcony. Some items that are easily blown down by the wind, such as flower pots, should be moved indoors or tied tightly.
(3) Check all drainage pipes, manholes, rainwater pipes, etc. , and remove the garbage, silt and sundries that may cause siltation.
(4) Ensure that all emergency appliances are available at any time, such as sandbags, raincoats, helmets, water boots, ropes, standby lighting, square timber (for fixing glass doors), etc.
(5) Check whether the drainage pump system is normal and unobstructed.
(6) Check whether the power generation system and its oil supply device are normal, and try to develop the motor set according to regulations.
(7) Turn off the neon power.
(8) Whether the intelligent system equipment runs normally.
(9) After the inspection, solve the problems found in time, and report to the leader immediately if there are any problems that cannot be handled.
3. In case of typhoon and rainstorm, the security officer on duty will strengthen the patrol of key areas and parts such as windproof and waterproof immersion, and check the condition of doors and windows. If there is broken window glass, they will rush to the scene as quickly as possible and temporarily cover it with plates. Maintenance personnel of the engineering department are on standby, and management service personnel at all levels stick to their posts. If there are complaints about equipment failure and potential accidents are found, emergency measures should be taken to solve them in time.
4, personnel at all levels to assist maintenance technicians to do a good job of flood drainage and water drainage.
5, in the typhoon, flood and other natural disasters and accidents, to prevent the occurrence of criminal cases.
The above details the emergency measures for typhoon prevention in the property, so that more people can know what the knowledge of typhoon prevention in the property is and what the warning before the typhoon comes. These are the little knowledge of natural disaster safety.
Emergency Plan for Typhoon Safety in Property Community 3 I. General Rules:
Compilation purpose
In order to do a good job of typhoon prevention, deal with all kinds of disasters caused by typhoon in time, minimize all kinds of losses on my construction site, maintain normal construction and ensure the smooth progress of the project.
2. Scope of application
This plan is applicable to the prevention and emergency treatment of typhoon disasters within the construction scope of this bid section.
3. Working principle
Typhoon disasters are managed according to the construction area, with various functional departments and construction teams as the main disposal, and each functional department is responsible for the construction team. All functional departments actively support, guide and supervise the emergency response work of corresponding construction teams. It is necessary to put the prevention of typhoon disasters in a prominent link and do a good job in various preventive work. Carefully analyze the strong winds and rainfall that may be caused by typhoons. In case of danger, respond quickly, start this emergency plan in time, and organize personnel to do their best to rescue and provide disaster relief.
key emphasis in work
(1) Waterproofing, pit wall collapse prevention and rolling stone prevention shall be carried out at the construction site of each foundation pit excavation;
(2) Prevent landslides, collapses and other disasters that may cause accidents on the construction roads;
(3) the temporary construction site and the construction team site before the disaster personnel and equipment transfer;
(4) Prepare flood control and drainage facilities for material warehouses on the construction site;
(5) Safety protection measures for vertical transportation equipment, scaffolding and construction electricity;
(6) The living guarantee of each construction site and station during the gale and heavy rain;
(7) Forecast, forecast and early warning of typhoons and rainstorms, and timely release typhoon early warning information to the construction team and the construction site.
Second, the leading group for flood control and typhoon prevention:
The project department set up a leading group for flood control and typhoon prevention with unified command, and each department was responsible for each construction team.
Leading group for flood control and typhoon prevention
Leader of leading group: xx
Deputy leader: xx
Members: xx, xx
Three. Prevention and early warning mechanism:
1, typhoon and other disasters monitoring
The safety team of the project department is responsible for the monitoring and information collection of typhoons, rainstorms, storms and mountain disasters, knowing the weather situation in advance, collecting all kinds of information on the base surface and traffic roads of each construction site in time and reporting it to the leading group.
2, the construction site safety inspection
Adhere to the safety inspection of each construction site, take the implementation of wind and flood prevention measures as the focus of inspection work, timely understand relevant information, and arrange personnel to deal with the base surface and roads that may cause harm in advance to avoid accidents when disasters occur.
3, the responsibility of the construction site early warning member to carry out.
Designate a part-time safety officer at each construction site to serve as a disaster early warning officer at the same time, mainly responsible for collecting and reporting all kinds of dynamic information at the construction site and notifying the leading group of instructions. Assist the construction team leader to implement disaster prevention measures and command work when disasters occur.
4. Disaster early warning mechanism
The security team should establish a monitoring system for weather conditions and construction site conditions, implement information collection measures, adhere to the daily inspection system, and conduct encrypted observation and inspection in rainy season. Once dangerous signs are found, immediately call the police, transfer personnel and related equipment, and report to the leading group of the project department.
Fourth, emergency response:
The leading group of the project department is in full command, with full participation, and coordinates the participation of personnel from relevant departments.
The disaster monitoring department analyzes the development trend of typhoon according to the weather forecast, issues rainfall and wind forecast, puts forward defense targets and reports them to the leading group in time. According to the circular, the leading group made clear the defense objectives and key points, issued personnel transfer orders, declared an emergency flood control and wind prevention period, started this disaster prevention plan, sent special personnel to the affected areas to guide the work, organized and directed the rescue and relief work, reported the relevant situation to the relevant departments at higher levels in a timely manner, and reported it to the higher authorities to coordinate the deployment of medical and living materials assistance when necessary.
Verb (abbreviation for verb) for emergency rescue and disaster relief:
After the typhoon landed or was seriously affected, the disaster prevention leading group held a meeting on emergency rescue and disaster relief in time to deploy emergency rescue and disaster relief work. Organize all staff to rush to the disaster relief site, guide the rescue and devote themselves to the rescue and relief work.
(1) The team leader grasps and summarizes the disaster situation in time, coordinates the related work of emergency rescue and disaster relief, is responsible for the deployment of disaster prevention materials, completes the disaster prevention evaluation work together with relevant personnel, and reports to the construction headquarters and supervision department.
(2) According to their respective responsibilities, each team member shall organize the supply of materials and equipment needed for post-disaster recovery, and give priority to the supply of living materials for construction workers.
(3) Each construction team shall formulate the repair plan of the damaged construction site in time and organize the forces to repair it as soon as possible.
(4) The leading group should contact the local health department, organize forces to actively rescue the wounded and sick, and at the same time cooperate with government agencies to do a good job in quarantine and epidemic prevention in disaster areas to prevent the spread of the epidemic.
(5) Each construction team should organize forces to repair damaged roads and communication facilities, and do a good job in post-disaster production and self-help.
(6) Logistics personnel manage and distribute materials to ensure the supply of daily necessities.
(7) Contact the insurance department to make claims.
(8) After the typhoon, all construction teams and departments shall report the disaster to the leading group in time. After the disaster, the leading group should summarize the experience and lessons of flood fighting, disaster relief and disaster relief, and submit a written report to the engineering headquarters and supervision department.
(9) When the typhoon and disaster situation are effectively controlled, the leading group can announce the end of the emergency according to the information summary.
Six, emergency support:
1, supported by rescue team
All contractors within the scope of our project department are obliged to participate in typhoon prevention and disaster relief. Each construction team takes the team leader and safety officer as the backbone, and organizes all personnel to participate in disaster relief work when disasters occur.
2. Material safety
The Material Logistics Department should reserve necessary emergency materials for typhoon prevention for emergency use in case of major disasters.
3. Financial guarantee
Office to do a good job in the implementation of emergency rescue and disaster relief funds, when disasters occur, according to the instructions of the leading group, do a good job in the allocation and distribution of funds.
4. Communication and information security
Communication methods are mainly mobile phones and hand-held walkie-talkies. When the public telephone network breaks down, the application system of disaster prevention walkie-talkie will be started in time, and the fixed channel of notification will be used to ensure the smooth information channel.
5, medical and health security
The leading group should contact the local health department, be responsible for health and epidemic prevention and medical rescue in epidemic areas, prevent the epidemic of diseases, and do a good job in immunization and disinfection in public places.
6, typhoon relief work evaluation
After each typhoon, the leading group should summarize, analyze, qualitatively and quantitatively evaluate all aspects and links of typhoon prevention and relief work. Summarize experience, find problems, and further do a good job in preventing Taiwan from disasters.
This plan by my project department "leading group for flood control and typhoon prevention" is responsible for the interpretation. This plan will be implemented from now on.
;
- Previous article:What are the conditions for the loan now?
- Next article:What about Shenzhen Huaxin Jia Chuang Development Co., Ltd.?
- Related articles
- How to get to Jiabao Garden from Huangshan North Station?
- How about the decoration of Ganzhou Liantai Tianxi?
- What is the telephone number of Liupanshui Nanfeng Tiancheng Marketing Center?
- Is the mall property operator the second landlord?
- What is the telephone number of Foshan Jiangshan Yipin Sales Center?
- How to judge validity
- Where is Changzhi Rubik's Cube Golden Street?
- How is Suizhong Fenghua Li?
- After paying the property fee, parking space rental fee and parking space management fee, the vehicles in the residential parking space are scratched or smashed. Who should I call?
- Does Shenzhen Baoneng VHOUSE bring decoration?