Job Recruitment Website - Property management company - What is the process of apartment decoration?
What is the process of apartment decoration?
2. Demolition and renovation of the main body: When entering the construction stage, the demolition and renovation of the main body is the first project, which mainly includes wall demolition, wall building, wall erection, heating removal and replacement of plastic-steel windows.
3. Hydropower transformation: Before the transformation of the water circuit, the demolition and transformation of the main structure should be basically completed. Between hydropower transformation and main demolition, the first test of the cabinet should also be carried out.
4. Woodworking: Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: shingle oil. Woodworking includes making vertical pipes, decorating ceilings and plastering lines.
5. Mud brick: mainly used for wall and floor tile paving.
6. Oilman: Mainly finish the basic treatment of the wall, paint the finish, and paint the furniture made by carpenters.
7. Kitchen and bathroom ceiling: As an installation link, the kitchen and bathroom ceiling continues the "packaging" of the home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought. It is best to install the kitchen ceiling lamp and exhaust fan (Yuba) at the same time, or leave thread ends and holes.
8. Cabinet installation: After the ceiling is completed, you can install cabinets at home. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.
9. Wooden door installation: hinges, door locks and floor drains to be installed at the same time as door installation should be prepared in advance. If you want the wooden door manufacturer to install the window cover, you should also measure it when the wooden door manufacturer measures it and put it on the wooden door. Install at the same time on the day of installation, and the installation time of marble windowsill should be staggered backwards, after the window cover is installed.
10. Floor installation: The following issues should be paid attention to in floor installation:
(1) Before the floor is installed, it is best for the manufacturer to go to the door to investigate whether the ground needs leveling or local leveling. Some decoration companies or teams will advise students to level the ground or partially level it, subject to the actual investigation of the floor manufacturer.
(2) Before the floor is installed, the floor paved at home should be cleaned to ensure the floor is dry, so do not use water during the cleaning process.
(3) When installing the floor, if possible, the floor must be cut in the corridor. Cutting the floor indoors has serious pollution to the wall, and cutting the artificial stone countertops of cabinets.
1 1. Installation of switch sockets: The owner should have a detailed understanding or record of the number and location of switch sockets in various natural rooms at home.
12, Home Accessories: Home Accessories, the last step of home improvement, has changed from decoration to decoration.
Matters needing attention in small apartment decoration
1. Try not to find a large decoration company. Because they are expensive, and the engineering quality is similar to that of ordinary small companies. These big companies are also some decoration teams from outside bread. They split it 50-50 with the decoration team, so directly looking for the decoration team can save nearly half the cost.
2. Try to be a cleaner. In other words, all the materials at home are purchased by themselves, and the decoration team is only responsible for decoration (that is, manual). Because if you let the decoration team use their own materials, those who are lucky will use them, and those who are unlucky will use some low-priced or even inferior products. Especially some concealed engineering projects, such as wires, TV lines, water pipes, etc.
Be sure to keep an eye on those decorators during the decoration process, otherwise they will have an opportunity. Lazy in some inconspicuous places. Think about what to do before the decoration (that is, decorate those places), and then design the decoration process, what to do first, and then what to do. Because some projects will affect each other, we should think it over before.
- Related articles
- How to get to Fuzhou Baolong by subway transfer from Changle No.6 Road?
- What's the difference between part-time job and flexible employment?
- What is the telephone number of the marketing center in Zone D of Yinchuan Xingzhou Garden?
- How about Wuxi Guo Xin Kindergarten?
- What is the telephone number of Taizhou Junxi Tianhui Plaza Marketing Center?
- The master put his things in the corridor. After the property was learned, the owner said that the owner agreed to put it on their floor. What should I do with the property?
- How about Qianbaijinwan real estate?
- What is the telephone number of the sales department of Kunming Agile Cloud Center?
- Mobile phone tower for mobile communication, does this distance have an impact on the body?
- How about Tianjin HSBC Labor Service Co., Ltd.