What information does Party A need to provide to Party B when a property management company takes over a project?
1, fire station acceptance report (including automatic sprinkler system inspection report, fire hydrant system inspection report,
System test conformity report,
Portable system inspection report
System inspection report, fire positive pressure air supply and smoke exhaust system inspection report, linkage alarm system inspection report, etc. );
2、
Inspection and acceptance certificate of cabinet (panel)
Certificate of competency,
Testing certificate, instrument testing certificate, etc. ;
3, gas and alarm detection and acceptance certificate;
4, the health and quarantine department of the living pool, equipment and water quality quarantine certificate;
5, buildings and equipment lightning protection device inspection and acceptance certificate;
6, the environmental protection department of drainage, smoke exhaust system, noise and vibration environment inspection and acceptance certificate;
7, elevator inspection certificate;
8. Architecture
Certificate;
9. Acceptance certificates of compulsory testing items specified by other countries, and acceptance of non-national compulsory testing items by Party A and the supervisor.
Second,
Paper:
1, building
Paper;
2. Decoration works
Paper;
3、
As-built drawing;
4, background music, fire protection
As-built drawing;
5、
As-built drawing;
6. Air conditioning
Installation project completion drawings;
7. Here
Installation project completion drawings;
8, fire protection system installation project completion drawings;
9. Outdoor
Installation project completion drawings;
10, gas and gas alarm installation project completion drawings;
1 1、
Project completion drawing;
12, lightning protection
record drawings
Three, all kinds of mechanical and electrical equipment factory certificate, material quality inspection list, mechanical and electrical equipment installation and debugging report,
, operation manual, drawings,
And the warranty certificate of the installation project.
Four. Property ownership information
State diagram, planning
, road planning, vertical planning,
Comprehensive planning diagram,
Planning drawings and planning instructions,
Reports, planning permits, investment permits, land use contracts, construction permits,
Figure.
5. Water supply contract, heating contract, power supply agreement, license and gas supply agreement license,
Certificate of approval, certificate of communication facilities, elevator license.
Design and construction data of intransitive verbs
Geological report,
Record,
Attention,
Report, important buildings
、
、
Records and other original records that may affect future management.
- Related articles
- Four-grade hometown beautiful scenery composition 490 words
- How about Hilton Fuxian Lake, Yunnan Chengjiang Laoyingdi Tourism Resort Co., Ltd.?
- Why is the house in Xiangyi Zijun, Changzhou cheap?
- What are the low-key rich second generation stars in the entertainment circle?
- Laiwu public transportation
- What is the telephone number of Tangshan Longhugong Marketing Center?
- Character experience, Hayashibara Megumi.
- In 2022, which villages will be demolished and revitalized in chiping High-speed Railway New Town?
- When will Jiaxing Shang Jun deliver the house?
- Warm tips of cold weather