Job Recruitment Website - Property management company - Notice of flood control safety supervision and inspection

Notice of flood control safety supervision and inspection

Demonstration notice of flood control safety supervision and inspection (6 selected articles)

In the era of continuous progress, notice will be used in many places, with many functions and types, and writing methods are also different. Did you know about the notice? The following is a sample of flood control safety supervision and inspection notice (selected 6 pieces) compiled by me, hoping to help everyone.

1 Notice of flood control safety supervision and inspection of property service enterprises:

In order to do a good job in flood control in 20xx, relevant issues are hereby notified as follows:

First, establish flood control organizations.

Each project should establish a set of flood control organizations with clear personnel, detailed division of labor and clear responsibilities, so as to ensure that the flood control work organization is in place.

1. The project leader is the first person responsible for flood control. Fully responsible for the on-site command and coordination of flood control work and emergency response. If the information of the person in charge of the project in the project filing information changes, it shall be changed in time.

2. Identify an information officer. In case of all kinds of dangers and emergencies, the information officer should report to the flood control headquarters, the Housing Construction Committee and the Housing Authority of the project territory within 30 minutes, and report the progress information in time. Announce a 24-hour emergency call.

3. Announce the telephone number on duty for flood control, ensure smooth communication, and arrange personnel to be responsible for it 24 hours a day.

Second, prepare flood control materials and establish a ledger.

1. Improve and supplement flood control materials, personnel and equipment. Improve and supplement the flood control material reserve, maintain and maintain emergency machinery and equipment, establish a material ledger, clarify the type, quantity, storage location and management responsible person of materials, and ensure that flood control materials are complete and effective.

2, the establishment of hidden trouble investigation ledger. Combined with the disaster situation and management practice over the years, the hidden dangers are investigated, so as to achieve comprehensive coverage and leave no dead ends, especially the hidden dangers such as lightning protection failure, roof leakage, blockage of drainage outlets and drainage pipes, failure of flood control measures in garages or underground spaces, and foundation collapse; For all kinds of hidden dangers found out, it is necessary to establish a ledger and register them by classification, so that the situation is clear and the time limit for hidden dangers management is clear. In principle, all treatments should be completed before the flood season.

Third, organize drills.

All property projects should formulate operational and feasible emergency plans according to the project situation, and everyone involved in flood control work should master them skillfully. Before the flood season, an emergency drill should be conducted to further strengthen the operation skills of the emergency team, check whether the emergency plan is operable in advance, check whether the materials are fully equipped and placed in a reasonable position, and improve the contents of the emergency plan according to the drill.

Notifier:

Date:

2 parents flood control safety supervision and inspection notice:

Hello!

The flood season in Beijing is coming. According to the requirements of the municipal flood control headquarters, all primary and secondary schools will focus on flood control publicity and education. In order to improve the safety awareness and self-help ability of primary and secondary school students, I hope you will pay attention to children's safety and protection education in flood season with us.

Implementation in Beijing: The measures stipulate that the flood season in Beijing is from June 1 day to September 15, and the main flood season is from late July to early August. During the flood season, local rainstorms occur from time to time, which can easily lead to floods and affect the normal operation of the city and the normal life of citizens. The hazards of rainstorm and flood mainly include the following categories:

1. Water accumulated under roads and overpasses, affecting traffic;

2. Dangerous old houses collapsed, and low-lying courtyards and basements were flooded;

3. Disasters such as mountain torrents, mudslides, landslides and collapses;

4 rivers and reservoirs and other water conservancy projects dam-breaking, sluice-falling, dike-breaking and other emergencies have caused serious floods;

Heavy rain accompanied by strong winds and lightning caused trees to fall, causing secondary disasters such as failures of public facilities such as transmission lines, water supply pipelines and transportation facilities.

The meteorological department of our city adopts four-level warning for bad weather, which is divided into: blue, yellow, orange and red. When bad weather comes, please ask parents to strengthen education and care for their children.

Recently, our school has concentrated on four-level early warning and flood control safety education for all students. It is suggested that parents can learn emergency avoidance knowledge with their children and cooperate with schools to do safety flood prevention and self-help education.

In particular, it is necessary to lead children to know and understand the safe places around them that can be used for emergency hedging. When going out in flood season, try to choose safe and reliable routes and destinations to protect children from danger.

Thank you for your support and cooperation.

Notifier:

Date:

3. Notice of flood control safety supervision and inspection of the project supervision department (group) of the company:

Recently, Xi 'an experienced continuous heavy rainfall. In order to do a good job in construction site safety, please urge the construction unit to take effective measures to prevent all kinds of quality and safety accidents in strict accordance with the requirements of relevant laws and regulations and mandatory standards and norms for engineering construction. The relevant matters are hereby notified as follows:

1, it is necessary to strengthen the monitoring of deep foundation pit support, set observation points, observe the changes of slope and adjacent buildings and structures at any time, find hidden dangers in time, and take effective measures to nip in the bud.

2, do a good job in the fixed state of tower crane and other large mechanical equipment and the sensitivity of various safety devices, and improve the wind, rain, lightning protection and collapse prevention performance of the equipment. The mechanical equipment with major accident hidden danger should be stopped immediately, rectified within a time limit, and it is strictly forbidden to run in spite of illness. If the rectification fails to meet the standard requirements, it will be resolutely stopped.

3, the construction of temporary electricity must conform to the requirements of the standard specification. Strengthen the safety management of on-site substation (distribution room) to ensure the safety of electricity consumption.

4, scaffolding safety precautions focus on checking the implementation of the vertical pole foundation and drainage measures and Rachel, so that the foundation is smooth and solid, drainage is smooth, Rachel is effective, and the scaffold is solid and reliable.

5, the dormitory, kitchen, office, warehouse and other temporary facilities on the construction site to conduct a comprehensive safety inspection, the existing unsafe hidden dangers, to take immediate measures, the maintenance of the maintenance, the reinforcement of the reinforcement, to ensure personal safety, to resolutely dismantle, to prevent the occurrence of collapse accidents.

6, do a good job in the supervision of production safety management on the construction site. Organize weekly and monthly safety inspections and special meetings; Review the safety technical schemes and measures of various sub-projects in the construction process in strict accordance with the requirements; If potential safety hazards are found, timely urge the rectification, issue a notice of potential safety hazards if the rectification is not in place, and report to the superior when necessary.

I hereby inform you, please follow it carefully!

Notifier:

Date:

Notice of flood control safety supervision and inspection of urban residential quarters, property service enterprises and owners' committees:

According to the requirements of the flood control work of the municipal party committee and the municipal government, all property service enterprises should make preparations for flood control and disaster prevention, regard the flood control work in the property management area as an important task at present, and take various effective measures to maintain the normal living environment of the majority of owners. In order to ensure the safety of urban residential areas in flood season, relevant matters are hereby notified as follows:

First, strengthen duty on duty and stick to post responsibilities.

The realty service enterprises should strictly follow the stipulations of the realty service contract, further strengthen the duty system in flood season, clarify the job responsibilities of each post, assign personnel, set time, set posts and assign responsibilities, stick to their posts, ensure smooth telephone communication on duty, properly handle emergencies and report to relevant departments in time. We must resolutely put an end to the phenomenon of empty posts, sleeping in posts and leaving posts, and constantly improve the sense of responsibility and service of the personnel on duty.

Two, strengthen outdoor inspections and maintenance, and earnestly fulfill their responsibilities.

The realty service enterprises should strictly follow the stipulations of the realty service contract, strengthen the inspection and inspection of the parts and facilities used in residential areas, focus on the inspection of basement passages, equipment rooms, rainwater pipes (wells), drainage wells and other parts, take effective measures in time to solve the problems found, and dredge and clean up the accumulated water in the main roads of residential areas in time. At the same time, it is necessary to make all preparations for flood control and implement "organization, planning, personnel, materials and measures" to ensure the safe and orderly development of flood control in flood season.

Third, strengthen the inspection of safety precautions and weak links to ensure safe operation.

The realty service enterprise shall conduct a comprehensive inspection on the safety prevention facilities, equipment and measures of residential quarters, including fire fighting equipment, lightning protection facilities, alarm devices, monitoring equipment and electrically controlled security doors. , should be kept in a normal state. Conduct safety inspection on the attachments and appendages of the house (such as outdoor air conditioner, sunshade, clothes hanger, TV satellite antenna, outdoor advertisement), notify the owner in time and make rectification when finding hidden dangers. To strengthen the protection, reinforcement and pruning of tall trees, to prevent heavy rain and dumping accidents in flood season.

Fourth, strengthen education and mobilize widely.

All property service enterprises should educate all employees on flood control, earnestly convey the spirit of flood control work at higher levels, preach the flood control regulations, measures and requirements of property enterprises, and let employees tighten the string of flood control work. At the same time, it is necessary to publicize the importance of flood control to the owners through scrolling screens, wall newspapers, blackboard newspapers, meetings, posting notices, etc., so that everyone knows it.

Notifier:

Date:

5. The highway maintenance team flood control safety supervision and inspection notice:

At present, our county is about to enter the flood season. In order to conscientiously implement the spirit of the notice of appropriate roads and do a good job in highway maintenance and highway flood control in the rainy season of 20xx, the relevant matters are hereby notified as follows:

First, raise awareness, make preparations for highway flood control, and pay close attention to the analysis and forecast of meteorological and hydrological departments in time;

Second, the highway maintenance team should attach great importance to highway maintenance and highway flood control in rainy season, actively take effective measures and pay close attention to implementation. The bureau has set up a leading group for highway maintenance and flood control in rainy season (the list of members is attached), and the office of the leading group for flood control is located in the bureau maintenance company;

Three, to further implement the responsibility system for highway maintenance and highway flood control in rainy season. The responsibility system for highway maintenance and highway flood control and flood fighting in rainy season should be implemented layer by layer to the stock room, highway maintenance team or individual. Gansu-Dalian line, Wanhuang line, Fengdai line, Sitang line and other tourist routes, county exits and other trunk lines and highways with great social impact should be strictly disciplined in flood control and flood fighting. If the responsibility is not in place and the work delay causes serious consequences, the relevant personnel should be held accountable;

Fourth, strengthen the prevention and emergency repair of highway water damage, organize personnel to inspect the road sections prone to water damage and accidents over the years, and deal with hidden dangers in time, especially take effective preventive measures for dangerous bridges and culverts and soft collapsed road sections, strengthen and repair, pay close attention to highway maintenance and material preparation, repair road pits and grooves in time, and remove sundries on bridge and culvert structures. Adhere to patrol roads in rainy days, and immediately organize personnel to carry out emergency repairs in case of water damage to roads, so as to ensure that flooded sections are flooded with water.

Five, strengthen the maintenance management of the construction section, the construction section should be clear about the maintenance responsibility, according to the principle of traffic while construction, the implementation of full-time maintenance personnel and traffic guidance personnel, to ensure the normal traffic of the construction section.

Six, rely on governments at all levels to do a good job of highway flood repair. In case of water damage, report to the local government in time for support and help. At the same time, in flood fighting and emergency rescue, we should obey the unified command and dispatch of the local flood control headquarters, organize manpower and material resources, actively participate in flood fighting and emergency rescue, and ensure that the transportation routes of flood control, disaster relief and epidemic prevention materials and personnel are smooth and give priority to release.

Seven, the establishment of day and night duty and reporting system in flood season. In order to fully grasp and understand the flood situation, emergency repair caused by water damage and meteorological conditions in time, all highway maintenance teams report the road conditions in flood season under their jurisdiction once every ten days (4th, 1 4th and 24th), and report serious water damage, emergency repair and traffic jam in time within1hour, and all highway maintenance teams are on duty day and night during flood season. Comrade Song Lei contacted the sub-bureau to dispatch flood control and emergency rescue work due to water damage. Each road maintenance team shall designate a special person to be on duty for flood control and water damage, and report the duty location, telephone number and contact person to the sub-bureau for timely contact.

Eight, the highway maintenance team after receiving this notice, should set up a team site flood emergency support team, unified deployment, responsibility in place. Do a good job in highway maintenance and flood control in rainy season.

Nine, the branch will organize a special inspection and appraisal of highway maintenance work in the rainy season this year, and incorporate the results into the year-end assessment.

Notifier:

Date:

6. The construction, supervision and construction units of flood control safety supervision and inspection notice:

According to the spirit of "20xx flood season construction site safety work conference", the weather in Beijing has been abnormal recently, with more precipitation than in previous years. In order to do a good job in flood control at the construction site, the relevant requirements are arranged as follows:

A, flood control work requirements

(1) Strengthen leadership and comprehensively improve emergency support capabilities.

Flood control work implements the 16-character policy of "safety first, constant vigilance, prevention first, and full resistance to risks", and implements the management principle of unified command and graded responsibility. All units should formulate targeted flood prevention plans and do a good job in flood prevention preparations, which must be as follows: the responsibility lies with people and the command is in place; The situation is clear and the plan is feasible; Adequate preparation and effective measures.

(two) the implementation of responsibilities, and comprehensively strengthen the planning system.

The main body responsible for flood control work is the general contractor, and the project manager is the first person responsible for flood control work. All units should comprehensively strengthen the construction of the plan system and formulate their own emergency plans for flood control in light of their own reality. Do clear responsibilities, command in place, early warning and quick response.

(3) Strengthen training and drills to improve actual combat capability.

All units should organize training and drills according to their own reality. First, organize various forms of professional training, focusing on emergency command, plan preparation, information publicity, material management, etc. Second, all units should organize professional rescue teams to conduct rescue drills.

Training exercises should be "3 combinations, 2 in place, 1 realization". That is, the training and drills should be combined with the "five implementations" of flood control (organization, responsibility, measures, funds and flood control materials), with the emergency plan for flood control, and with the disasters that have been prevented (such as the collapse of foundation pits caused by rain); Ensure that all responsible persons for flood control are in place and all measures are in place; Generally speaking, it is still necessary to meet the requirements of actual combat.

(four) seriously carry out flood control inspection, completely eliminate potential safety hazards.

All units should carry out investigation and study according to the progress of the project, carefully organize the investigation of hidden dangers of flood control and the identification of dangerous sources, and establish a ledger to be detailed, complete and verified, with clear ledger; Pay close attention to the problems found in the inspection and take practical measures; For hidden problems that really affect flood control safety and are difficult to solve, experts should be organized to demonstrate and formulate and implement safety emergency measures.

Second, the specific measures for flood control work

1. During the flood season, all units should strictly implement the "production duty system" and strictly observe the duty discipline. Leaders responsible for flood control work shall not leave their posts at will.

2. It is rainy and humid in flood season, which is a high incidence period of electric shock accidents. The construction unit should do a good job in rain protection of construction machines and equipment, especially carefully check temporary electrical equipment, related electrical circuits and protective grounding measures to prevent short circuit, electric shock and lightning accidents.

3. All units should formulate flood control and lightning protection measures for tall scaffolding and large mechanical equipment in windy and thunderstorm weather, and strengthen the inspection of the above equipment foundation after rain. For the construction of large steel structures in rainy season, it is necessary to formulate special lightning protection schemes as soon as possible and organize their implementation before the flood season to ensure the construction safety in rainy season.

4. All units should strengthen the safety education for on-site management personnel and construction personnel in flood season, and constantly improve employees' awareness of production safety, self-protection and construction safety protection in rainy season.

5, the relevant units should strengthen the information submitted, timely report the flood control work dynamics, keep the information flowing, if there are any abnormal situations and emergencies, immediately report to the District Construction Bureau, and start the on-site emergency plan, and report the accident step by step according to the regulations.

Third, the focus of flood control work

All foundation construction and trench construction should focus on preventing collapse and rainwater from flowing backwards. It is necessary to strengthen the monitoring of the project and surrounding buildings, formulate preventive measures and emergency plans according to the characteristics of the project and the surrounding environment, and prepare flood control materials in advance, such as water pumps, sandbags (sand and gravel), grouting equipment and temporary lighting equipment. In case of any abnormal situation or rainstorm during monitoring, measures should be taken in time to prevent accidents.

This year, there are many new projects in our district, and the flood control situation is grim and the task is arduous. All units should attach great importance to it and make careful arrangements to ensure the safety of the project construction in the spirit of being highly responsible for people's lives and property.

Notifier:

Date:

;