1 project overview
A residential project in Beijing, the above-ground residence is about 200,000 square meters, the highest single building is 28 floors, and the building height is less than 100m ... The underground garage has two floors, about 50,000m2. Usually used as a garage, wartime functions for personnel shelter and civil air defense materials warehouse. Taking this project as an example, the installation positions of the first floor, solar system, E-class warehouse spray, fire booster and voltage stabilizer of residential buildings are analyzed, which provides corresponding help for the installation of water supply and drainage system in Beijing residential quarters.
2 Several problems and solutions of water supply and drainage system in residential projects
2. 1 Water meter setting for water supply system of residential project
In the residential water supply system, according to the requirements of Beijing Water Supply Group for water meters on tap water floors, it is generally appropriate to supply water to 15-20 households with 40 meters per Ф. 2. 1. 1 problem analysis This project has many single floors and many households on each floor. If the number of risers is large according to the above requirements, it will be difficult to arrange the tube wells and increase the area. The problem is particularly prominent in 17# building, with six households on one staircase and 28 floors. If one platform is needed on the third floor, at least nine platforms are needed, that is, nine water supply risers, even if the zoning of water supply pressurization equipment is not considered. In addition, there are five reclaimed water supply pipes, 1 root canal well drainage pipe and two fire hydrant water supply pipes in the unit tube well, and the total number of risers is 17. With the increase of tube well size, a large area of tube well is needed, and it is difficult to find a suitable position for the originally cramped residential core tube. 2. 1.2 After communicating with Party A and the consulting unit, it is decided that the solution measures will be implemented according to the following scheme: (1)/pressurized water supply system of building kloc-0/7 # * * 3 partition+municipal water supply area, including 4 partitions, and the water supply scope of municipal water supply area is F 1-F3, with a supply of 6550. (2) For the pressurized water supply system, the platform is set according to the zoning situation, that is, one platform is set for each of the three pressurized zones. Each unit has four platforms and four water supply risers. Reduce the number of risers in tube wells to 12, and reduce the number of risers and the area of tube wells on the premise of meeting the requirements of water supply group to the greatest extent, so as to meet the use requirements and reduce the pool area.
2.2 Reserve water supply and drainage conditions for functional areas that are not yet clear.
2.2. 1 problem analysis how to reserve some water supply and drainage conditions in areas whose use functions have not been finalized by the owner in the design stage of construction drawings? There are two prominent areas, such as the basement of the house and the supporting shops. 2.2.2 Scheme (1) Residential basement scheme: The rooms in the design stage are named Class E warehouse. In order to meet the needs of water supply and drainage for other functions in the future, the diameter of municipal water supply riser is rechecked according to the users who add a layer to ensure that the diameter of water supply riser has a certain surplus, which will reserve conditions for the basement water supply pipeline in the future. Select a suitable location in the second floor underground to reserve a sewage pit, set up a submersible sewage pump and a ventilation riser, and design a pressurized sewage pipeline to an outdoor drainage inspection well. In addition, in order to prevent the damage of the check valve at the outlet of the lift pump and the mutual influence of the sewage pits, the pressurized drainage pipe of each sewage pit needs to be connected to the well separately, so as to be truly safe and reliable. (2) Solutions for supporting shops: According to the experience of previous projects, except for a few ordinary shops, most supporting shops are easier to sell and rent as restaurants. In order to prevent modification after construction, water supply and drainage conditions are reserved for the restaurant in this project. In addition to the water supply and drainage design of the bathroom, it is also necessary to reserve the drainage cleaning port of the restaurant on the ground of each merchant, and reserve the kitchen drainage riser separately, and the drainage will be discharged after being treated by the outdoor grease trap.
2.3 solar hot water system settings
According to Article 5.3.2 of the Design Standard for Energy Efficiency of Residential Buildings in Beijing (DB11/891-2012 [1]), when industrial waste heat and waste heat are unconditionally used as the heat source of domestic hot water, the house shall be The solar hot water system shall be set according to the following requirements:/kloc-residential buildings with 0/2 floors or below, and residential buildings with Fwx≥Ajz above 12 floors, and all users in the building shall be set with solar hot water system. /kloc-Fwx above 0/2 layer
- Previous article:Where is Yantai Zhongnan Lin Yue?
- Next article:Who is the developer of Dazhou Bangtai Tianzhu (Commercial) Store?
- Related articles
- How to evaluate the intermediate title of registered property manager?
- Where is the school district of Xi 'an Huarun Yuefu?
- Brief introduction of Jiayu building project
- Property causes collective concern.
- How many years is the property right of Tian Fang Rainbow Garden?
- How should owners protect their rights when the community forces residents to use face recognition?
- What is the telephone number of Beijing Zhonghai Lichun Hushu Wenyufu Marketing Center?
- How to do a good job in property management and charging
- What exactly is Huabanli Garden (Longgang)
- Beijing Yuxin Pavilion belongs to that community.