What does the fire protection project include?
First, the construction of automatic fire alarm system, including fire alarm broadcasting, fire linkage, etc. ;
Two, the construction of automatic fire extinguishing system, including automatic sprinkler system, gas fire extinguishing system, foam fire extinguishing system, nitrogen injection and oil drainage fire extinguishing system. ;
Three, smoke control system, including positive pressure air supply, alarm smoke exhaust;
Four, fire separation, including fire doors, fire shutter, fire water curtain belt;
Five, indoor fire hydrant system;
Six, emergency lighting and evacuation signs;
Seven, stop the fire.
What does the fire protection project include?
The main construction contents of the fire protection project: automatic fire alarm and linkage system, fire water supply and indoor and outdoor hydrant system, automatic sprinkler system, gas fire extinguishing system, ventilation and air conditioning system of smoke exhaust fan, fire shutter, smoke blocking vertical wall and fire door.
The following is the necessary construction process of fire protection installation project.
1, installation preparation and material requirements
(1) Before the construction of the fire fighting project, Party A must be assisted in the design review of the fire fighting facilities, and construction is not allowed without design review or unqualified design review.
(2) Before the construction of the fire control project, relevant information must be declared to the fire control department, and a fire control construction permit must be obtained.
(3) The selected materials must be registered in the fire department and have a quasi-sale certificate issued by the fire department.
2, fire engineering construction stage
Install the nozzle, alarm valve group, fire hydrant box and other components.
3. Debugging and acceptance of fire protection system
What does the fire protection system information include?
Technical data of fire protection engineering
Fire engineering is an important part of building engineering. With the continuous progress of society and the high intelligence of buildings, fire protection
The management of this project is becoming more and more strict.
The quality control of fire protection works shall be checked by the on-site supervision unit, and the specific construction conditions shall be completed by the fire protection technical data. Let me introduce what I know:
First of all, briefly introduce the fire engineering: fire engineering mainly includes automatic alarm system, automatic sprinkler system and fire extinguishing system.
Fire hydrant system, others include emergency broadcast system, smoke control system, etc.
1, the preparation work before the start of the fire protection project is to prepare the fire protection project construction team according to the specific conditions of the project.
Organization Design Scheme, with specific information as follows: ① Report of construction organization design (scheme) ② Construction organization design scheme.
2. When the fire fighting project starts, it is necessary to apply for checking the company's qualification. The specific materials are as follows: ① Start-up report form.
The commencement report includes: the company's fire-fighting professional qualification, the company's business license, tax registration certificate, project construction contract, etc.
3. After the fire fighting project comes into play, the first thing to do is to inspect the engineering materials that come into play. The specific information is as follows: ① Engineering materials.
Application Form for Materials/Spare Parts/Equipment ② Application Form for Entry of Engineering Materials
Attachments include: certificate of conformity, quality certification materials and self-inspection results. (Note: All incoming materials need to be sent for inspection, and the same materials should also be sent for inspection.
Once)
4, fire engineering automatic alarm system, if you need to reserve the pipeline in the early stage, need to do hidden inspection (hidden inspection refers to the construction part.
Where it is not easy to be seen). The specific information is as follows: ① Application form for concealed engineering inspection; (2) take cover engineering inspection record; ③
Quality acceptance record of inspection lot of line pipe. If the pipeline has been reserved in the early stage of civil engineering, only threading is needed, so it is necessary to carry out hidden inspection and stay wire inspection.
Check and approve the quality acceptance records.
5. The automatic sprinkler system and fire hydrant system of fire fighting engineering are basically the same. After the pipeline enters the site, it needs to be inspected at the municipal inspection station.
Check the gate valves (butterfly valves) used in pipelines and projects. Unqualified products cannot be used in projects. Under normal circumstances
The interior of the building needs to be decorated, so the installation of the pipeline can be hidden, and the hidden information is as mentioned above. If you don't need to do concealment, then
Only used for pipeline installation, the details are as follows:
(1) pipeline installation inspection (2) indoor water supply pipeline installation inspection batch quality acceptance record. After the pipeline installation is completed, it is necessary to carry out pressure test. The details are as follows:
① Application for pipeline suppression inspection ② Record of water pressure and air pressure test ③ Record of valve (monomer) test. The materials to be done when installing fire hydrants are as follows: ① Application form for installation and inspection of fire hydrants; (2) fire hydrant installation inspection quality acceptance of the batch record.
6. After the automatic alarm system is threaded, the materials to be done are: ① application form for resistance test and inspection ② grounding resistance test record.
Record Sheet ③ Record Sheet of Resistance Test to Ground.
7, engineering data is usually in quadruplicate, specifically by the supervision, construction unit, fire department, company backup. Manufacturing information
In this process, we must do it in time and send it in time to avoid later troubles. In the process of making information, most of the information is signed by the supervisor, rarely.
Part of it shall be signed by the supervisor and the construction unit.
8. After the completion of the project, organize the data, bind them into volumes and send them to the fire station.
Relevant certificates of fire protection products, test reports, factory certificates, completion drawings of fire protection projects, opening records of engineering construction commissioning, records of concealed works, records of design and construction changes and other relevant materials.
1. The specific data are: ① construction organization design (scheme) report ② construction organization design scheme.
2. The specific information required for the commencement of fire fighting project is as follows: ① Commencement report. The commencement report includes: the company's fire-fighting professional qualification, the company's business license, tax registration certificate, project construction contract, etc.
3. After the fire fighting project comes into play, the first thing to do is to inspect the engineering materials that come into play. The specific information is as follows: ① Engineering materials/
Spare parts/equipment inspection form ② The attachments of the engineering data inspection form include: certificate of conformity, quality certification materials and self-inspection results.
4. Automatic fire alarm system. If the pipeline needs to be reserved in the early stage, it needs to be hidden. The specific data are as follows: ① Concealed works.
Inspection Application Form ② Concealed Engineering Inspection Record Form, ③ Quality Acceptance Record Form of Line Pipe Inspection Lot.
Prepare five copies according to the different requirements of each site, which shall be filed by Party A, the supervisor, the general contractor and the fire control company. Get ready and good luck! ~...& gt& gt
What systems does the building fire protection project mainly include?
Overview of Sichuan elimination system
First, automatic fire alarm.
1 pipeline and line laying
2 fire detectors
2- 1 point fire detector
2-2 linear fire detector
2=3 aspirating smoke detectors
3 Manual fire alarm button
4 fire alarm controller
5 isolator
6 Fire display panel
7 fire control room control device
Second, the fire water supply system
1 fire pool
2 fire water tanks
3 Pressure stabilizing pump, booster pump and pneumatic water tank
3- 1 pneumatic water supply device
-2 pressure stabilizing pumps and booster pumps
4 fire pump
5 water pump adapter
Three, fire hydrant, fire monitor system
1 fire hydrant system
1- 1 indoor fire hydrant
1-2 outdoor fire hydrant
1-3 hydrant button
1-4 hydrant pipe network
2 fixed fire monitors
2-2 Water cannon water supply network
2-3 water cannon system control
2-4 Pump Start Button
Four, automatic sprinkler system
1 alarm valve group
1- 1 wet alarm valve function
1-2 dry alarm valve function
1-3 pre-action alarm valve function
1-4 rain alarm valve function
2 water flow indicator
3 terminal water testing device
5 spray pipe installation
6 pipe network
7 nozzle
Five, fixed foam fire extinguishing system
1 water supply facilities, water pump start button
1- 1 fire pool
1-2 fire water tank
2 Pressure stabilizing pump, booster pump and pneumatic water tank
2- 1 pneumatic water supply device
2-2 Pressure stabilizing pump and booster pump
2-3 foam water pump
2-4 foam pump control cabinet
2-5 gear water pump adapter
2-6 Pump Start Button
3 foam liquid storage tank
4 proportional mixer
5 foam generator
6 Installation of pipes and valves
7 foam fire hydrant
8 foam nozzle
Six, gas fire extinguishing system
1 bottle group and storage tank
2 Filling quantity and pressure of extinguishing agent
3 Installation of storage containers
4 bottles storage room environment
5 Fire extinguishing agent conveying pipe fittings
5- 1 title
5-2 gear selector valve
6 Valve drive device
7 Installation of fire extinguishing agent conveying pipeline
8 nozzle
You wait.
9 gas fire extinguishing controller
Seven, mechanical pressurized gas supply system
1 fan
2 Fan control cabinet
3 air supply outlet
Eight, mechanical smoke exhaust system
1 fan
2 Fan control cabinet
3 Smoke outlet, smoke-proof fire damper and electric smoke-proof window
Nine, hanging smoke wall
X. Fire emergency lighting and evacuation indication system
1 emergency lighting
2 evacuation instructions
Eleven, fire emergency broadcast system
1 Settings for broadcast speakers
2 amplifier
Twelve, fire telephone system
1 Performance of fire telephone switchboard
2 setting and performance of fire telephone extension
3 performance of fire telephone jack
Thirteen, fire separation facilities
1 fire door
1- 1 steel fire door
1-2 wooden fire door
3 fire shutter
Fourteen, fire elevator
Fifteen, leakage fire alarm system
1 electrical fire detector
1- 1 residual current type electrical fire monitoring detector
1-2 temperature measuring electrical fire monitoring detector
Sixteen, the setting of the fire extinguisher
What drawings does the fire fighting construction drawing include?
Structural quilt
What does the fire engineering construction include?
The piping and wiring of automatic fire alarm system shall comply with the provisions of current national standards.
Fire detectors are divided into five basic types: temperature detectors, smoke detectors or light detectors, gas detectors and composite detectors. The horizontal distance between the detector device and the edge of the wall and beam shall be ≥ 0.5m There shall be no obstacles around the detector. The horizontal distance from the detector to the air supply outlet shall be ≥1.5m. The installation spacing of temperature detectors shall not exceed 10m, and the installation spacing of smoke detectors shall not exceed 15m. The detector should be installed horizontally. When installed obliquely, the inclination angle shall be ≤45℃.
The manual fire alarm button is installed on the wall at a height of 0/.5m from the ground (building). Should be installed firmly, shall not be tilted. The outer conductor of the button should have a margin of 10cm or more.
The fire alarm controller is installed on the wall, and the height of its bottom edge from the ground (building) is ≥1.5m. When it is installed on the ground, the bottom edge is 0. 1~0.2m higher than the ground. The main power supply of the controller should be directly connected with the fire power supply, and the grounding of the controller should be firm.
Before installation, the function of fire fighting equipment should be checked, and the end of the outer conductor of fire fighting equipment should be clearly marked.
The working grounding wire of the system shall be copper-core insulated wire or cable metal tube, and the working grounding wire and protective grounding wire shall be separated, and the protective grounding conductor shall not be metal hose.
Before the automatic fire alarm system is debugged, the detector, regional alarm controller, centralized alarm controller, fire alarm device and fire-fighting equipment should be checked one by one, and the system can be debugged only after it is normal. After the automatic fire alarm system is electrified, the control function and linkage function of the alarm controller should be checked according to the requirements of the current national standards. After the automatic fire alarm system runs continuously 120 hours without fault, fill in the debugging report.
What systems does the fire protection project mainly include?
It's tiring to answer this question!
Electricity: fire alarm system, emergency evacuation system. broadcasting system
Water: sprinklers, fire hydrants,
Wind: rehearsal, air supply,
Gas fire extinguishing system, etc.
What are the fire engineering related majors?
Major in fire engineering, emergency rescue command and technology, fire command, fire detection, etc. Property management is a major in business administration. To apply for a firefighter, you should consult the fire brigade.
What does thermal power include?
Thermal power is short for weak electricity.
"Fire protection weak current", as its name implies, refers to weak current systems and weak current equipment used in fire protection systems and fire protection projects.
Fire fighting system (sometimes called fire alarm system, translated from English) generally consists of two parts, namely fire alarm equipment and fire extinguishing equipment.
With the development of fire protection today, fire warning is no longer the level of patrolling gongs, and fire fighting is no longer the level of pouring buckets. It is generally composed of various electronic sensors (commonly known as probes), circuit boards, ic modules and other professional industrial computers. Fire is detected by the information provided by smoke and temperature sensors, and the control electrical signal is output after computer system analysis, so as to drive the electromagnetic valve and other electrical control elements on the release door of professional fire extinguishing agent container to act, so that the fire extinguishing agent can be released to the fire site (referred to as fire site).
- Related articles
- Where is the address where Chengdu Yufeng meets the real estate?
- Is the property responsible for falling tiles and hurting people?
- Which property management belongs to Jinniu Community in Lishan District, Anshan City, Liaoning Province?
- Is the Southeast Pearl of Tanze a school district?
- What is the telephone number of the sales office of Haikou Bay Garden Apartment?
- Does anyone know the swimming price of Nanjing Sun Palace this year? Are there any preferential policies?
- Property cleaning dog
- Why is Yantai Nanshan Jiayuan so expensive?
- How about Fujian Intensive Care Safety Co., Ltd. Putian Branch?
- What is the surrounding environment of China Railway Construction International City? Is life convenient?