Model elevator maintenance contract

Party A:

Party B:

In order to clarify the rights and obligations of both parties, both parties conclude this contract on the principle of fairness, honesty and credibility for mutual compliance.

1. This contract shall come into effect after being signed and sealed by the representatives of both parties.

Second, the scope of services

Party A entrusts Party B to provide maintenance services for elevators installed at the following locations:

1, and the building is called "Subtotal Desk";

2. The building is called a subtotal table;

3. The building is called a subtotal table;

4. The building is called a subtotal table;

Third, the service period.

Starting from _ _ _ _ _ _ _ _

Fourth, service hours.

1. The services specified in this contract are usually performed during Party B's working hours. If there are special needs, Party B can provide services at any time, only at an additional charge.

2. If the equipment mentioned in this contract breaks down and needs emergency treatment, there is no time limit, that is, Party B provides emergency treatment service for the equipment 24 hours a day for 365 days.

Verb (abbreviation of verb) The service content and responsibility of both parties.

1, Party B's responsibility

1. 1 The service mode of this contract is small package maintenance, and the relevant rules and regulations of Party B shall be strictly observed during the service.

1.2 send technicians twice a month to carry out maintenance work such as adjustment, inspection, lubrication and cleaning according to national standards and Party B's processes and specifications (see Annex 1) and requirements, so as to make the equipment run normally.

1.3 provide all-weather emergency treatment service, and arrive at the site within 25 minutes after receiving Party A's notice of repair, and within half an hour under special circumstances.

1.4 is responsible for replacing damaged parts caused by improper maintenance during the service period free of charge.

1.5 If the elevator stops due to improper maintenance and fails to resume operation within seven working days, the maintenance fee of this station will be exempted for one month; If it fails to resume operation within fifteen working days, the maintenance fee of the equipment will be exempted for one year.

1.6 Cooperate with government departments to conduct annual inspection of equipment during the service period, and carry out free rectification of rectification items caused by improper maintenance.

1.7 If a non-maintenance accident is found or occurs, it shall immediately notify Party A in writing for rectification. When the accident seriously affects the safe operation of the equipment, it has the right to notify Party A to stop using the equipment.

2. Party A's responsibilities

2. 1 Be responsible for the daily management of equipment, and check and confirm the service quality and service items of Party B..

2.2 During the maintenance period, Party B shall be given reasonable and sufficient time to stop the ladder and set up on-site safety warning signs.

2.3 Use spare parts provided by Party B or approved by Party B to ensure the normal and safe performance of the whole machine.

2.4 In order to safeguard Party B's technical rights and interests, Party B shall purchase Party B's special parts by exchanging bad parts for new ones.

2.5 Be responsible for paying the expenses of elevator parts and materials that have not been replaced due to Party B's improper maintenance.

2.6 For maintenance and replacement caused by improper management, use or man-made damage, a maintenance contract shall be signed with Party B. ..

2.7 During the service period, if a third party modifies, repairs, decorates or replaces the contract equipment, it shall notify Party B in writing and obtain Party B's consent before implementation, and notify Party B to inspect the equipment at the end of the project. Party A shall be responsible for the equipment performance caused by the implementation of the project and the consequences of the project without Party B's approval.

Labor cost of intransitive verbs

According to the service form and service content, the maintenance fee is:

Number of elevators (Party A) Elevator model (sets) Landing load kg speed m/s Monthly maintenance fee per set (RMB) Annual total amount (RMB)

Total annual elevator maintenance fee (in words):

Seven. Payment terms:

Party A shall pay Party A 50% of the total contract service fee, namely RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ The remaining amount shall be paid in one lump sum before the end of the service period.

Eight, this contract does not undertake the project.

1. Renovation, maintenance, decoration, replacement, cleaning and maintenance of auxiliary facilities such as elevator shaft wall, shaft I-beam, shaft lamp, shaft waterproof, shaft isolation net and power supply in machine room in civil engineering.

2. Maintenance and replacement works caused by improper use and management of Party B or man-made damage or force majeure.

Nine. others

1. When Party A requests Party B to provide services other than those specified in this contract and its annexes, Party B shall submit them to Party A for confirmation in the form of quotation, and Party B shall provide services after both parties sign another agreement.

2. Before maintenance or repair, Party A shall be informed in advance, and the service shall be signed and approved by Party A's representative, and the replaced waste parts shall be handed over to Party A. Without the signature and approval of Party A's representative, Party A has the right to regard this service as invalid.

3. When Party A requests to provide services other than those listed in this contract, the expenses incurred shall be borne by Party A, and Party B shall submit the quotation to Party A for approval before implementation.

4. When it is necessary to increase the functions of the equipment due to the promulgation or revision of relevant national standards, both parties shall sign a maintenance contract separately, and Party B will give preferential prices.

5. After Party B performs the service, if Party A fails to pay the payable expenses in time, Party B has the right to claim liquidated damages from Party A according to the interest of the bank loan.

6. All kinds of wastes generated during maintenance shall be disposed of by Party A according to local environmental management laws and regulations and relevant regulations.

7. If there are any matters not covered in this contract, both parties shall sign an agreement separately, which shall be regarded as Annex II to this contract.

8. Except for this contract, the annexes and agreements confirmed by both parties are regarded as an integral part of this contract and have the same effect.

9. If there is any dispute between the two parties, the two parties shall first settle it through consultation. If negotiation fails, either party may bring a lawsuit to the people's court where the plaintiff is located according to law.

10. Party B's work contents and other agreed matters shall be implemented according to the original contract.

1 1. If either party needs to terminate the contract, it shall notify the other party in writing two months in advance, and terminate it after all expenses are settled.

12. This contract is made in quadruplicate, with each party holding two copies, which shall come into effect after being signed and sealed.

Party A: Name of Company: (Seal)

Party B: Company Name: (Seal) Company Name: (Seal)

Address:

Entrusted agent:

Contact person:

Telephone:

Postal code:

Fax:

Bank of deposit:

Account number:

Signing place: