How to sign a contract with an electrician

Electrician construction contract

Employer (hereinafter referred to as Party A): Tel:

Construction Team (hereinafter referred to as Party B): Tel:

In the spirit of friendly cooperation, Party A and Party B sign the following contract on the basis of equality and fairness in accordance with the Contract Law and other relevant laws.

I. Project address:

2. Price: XXX Yuan/m2, water pipe installation fee/wire laying fee/m2.

Installation fee/RMB per square meter/other items per square meter: it depends on the situation of the construction site, such as what to do, what is dark and what is bright ~!

Three. Payment type/method

During the construction process, Party B can negotiate with Party A to pay part of the money in advance, and the remaining money will be paid after the project is completed and the owner accepts and confirms the area. % of the total project price shall be reserved as the project quality deposit until the warranty period expires.

Fourth, materials.

1. Party B shall provide Party A with a list of materials to be purchased three days in advance, and Party A shall timely purchase materials for use by the construction team within four days, and both parties shall bear their respective responsibilities. 2. Party B shall accept the quality of the building materials purchased by Party A, and raise quality problems with Party A in time, and have the right to refuse to use them. If Party A insists on using it, it shall request Party B in writing and bear the losses caused by the quality of the materials.

3. Party B shall assist Party A to receive the goods and check the accuracy of the quantity and accessories.

4. Party B shall properly keep the materials and prohibit other personnel from entering the site.

5. Party B shall protect the finished products after construction. If there is any damage, Party B shall compensate the price.

6. Without Party A's permission, Party B shall not take out any building materials and waste them. If this happens, it will be deducted from the labor cost by doubling the material price.

Verb (short for verb) duration

The construction period is days, from year to year. If the construction period is delayed due to Party A's factors, the construction period will be postponed. If the construction period is delayed due to Party B's factors, Party A may deduct Party B's labor cost RMB/day.

6. Garbage removal:

1, garbage bag, sunny.

2. The garbage shall be transported by Party B to the garbage dump designated by the property.

Seven, labor management

1. Party B shall provide Party A with copies of ID cards of all construction personnel before the commencement of construction.

2. Without Party A's permission, off-site construction personnel shall not spend the night at the site.

3. Party B's temporary residence permit in XXXX is complete, and relevant losses caused by incomplete documents shall be borne by Party B. ..

4. Party B shall designate the person in charge of the construction site.

5. Without the consent of Party A, Party B shall not change the construction personnel at will, and there must be at least two construction personnel on site every day. 9. Without the consent of Party A, Party B shall not stop work or stop work under any circumstances.

. Eight, on-site management

1. Open flames are prohibited on site.

2. Electrical materials must be separated from other materials.

Nine. dispute over a contract

1. In case of any dispute, Party A and Party B shall settle it through negotiation first.

2. If negotiation fails, a lawsuit can be brought to the court where the dispute is located.

X. Decoration requirements

1 Before construction, the things in the original room should be protected.

After the construction is completed, Party A shall conduct acceptance inspection.

3. All electrician construction must be carried out in accordance with Quanzhou Family Decoration Code, and Party B shall not reduce the construction procedures without permission.

Eleven. Acceptance:

1. After the completion of the construction, Party B shall notify Party A, and the acceptance by both Party A and the owner means that the project quality is qualified.

2, the construction unit must ensure the construction quality, construction quality problems, the construction unit should promptly correct. If quality problems are found during the completion inspection and acceptance, the construction unit shall immediately rectify them, and Party A has the right to refuse to pay labor costs before the rectification requirements of the owner are met.

3, the construction personnel to civilized construction, barbaric construction is prohibited. For example, take good care of the original indoor facilities, do not paint or paste wallpaper on the wall, do not place wooden boards against the wall, do not drag heavy objects or wooden boards with nails on the floor, and do not work on furniture surfaces, doors, drawers and basins. Don't let cement, sand, cardboard and other building materials or garbage fill toilets or sewers. All the articles of Party A shall not be disposed of without permission. Party A has the right to request the replacement of the construction personnel with poor performance, and the contractor shall not delay.

4. The construction unit is responsible for cleaning up the construction waste to the designated place in time. After the construction, the construction personnel are responsible for clearing the construction waste at the site, and can leave the site immediately after the completion.

5. The contractor shall strengthen the safety education on fire prevention and theft prevention for the on-site construction personnel, and the construction personnel shall not violate the law and discipline at the construction site. If there are any problems, Party A and Party B shall bear the consequences:

Signature: signature:

Date of signing: Date of signing: