Acceptance data of new elevator in Linyi, Shandong Province
(1) Description
1. Product packing list (four copies)
2. Elevator installation instructions
3. Instructions for use and maintenance
4. Schematic diagram and code description of elevator
(2) drawings
5. Overall layout of elevator civil engineering
6. Electrical wiring diagram
7. Installation drawing of electrical components
(3) certificate of conformity
8. Certificate of approval
9. Six type test reports
10. Inspection report of elevator speed limiter
1 1. Product appearance certificate (copy)
12. product certificate (iv) acceptance data
13. Elevator installation inspection report (self-inspection report on completion of elevator installation, maintenance and transformation)
14. elevator operation record
15. Acceptance data of elevator engineering construction quality (including 16-3 1)
16. Records of the blue prints.the design, design changes and civil arrangement negotiation (in the civil completion drawing)
17. Acceptance Record of Concealed Works
18. Construction records
19. Test records of grounding resistance and insulation resistance.
20. Load test record
2 1. Safety device inspection record
22. The equipment in (disciplines) quality acceptance record
23. Civil handover inspection (breakdown) quality acceptance record
24. The drive host installation (disciplines) quality acceptance record
25. Guide rail installation (disciplines) quality acceptance record
26. Door system installation (disciplines) quality acceptance record
27. Car and counterweight (sub-item) quality acceptance record
28. Safety components (disciplines) quality acceptance record
29. Quality acceptance records of suspension devices, accompanying cables and compensation devices (sub-items)
30. Electrical equipment (disciplines) quality acceptance record
3 1. Quality acceptance record of whole machine installation (sub-item)
(5) Completion handover
32. Installation project completion handover acceptance form
Two. Information of Technical Supervision Bureau
33 elevator registration form (copy)
34. Elevator safety inspection certificate (copy)
35. Safety warning signs
36. Special equipment safety responsibility target book (property right)
Third, the quality supervision station information
37. Elevator Division Supervision (Construction) Evaluation Form (Construction Table 6-6)
38. Quality behavior evaluation during elevator installation (construction table 7-7)
39. The elevator division engineering quality acceptance report (construction table 7-8)
40. Elevator acceptance report
4 1, Instructions for Installation, Modification and Maintenance of Special Equipment
42, elevator division engineering quality acceptance record -T7-00
43. Sub-project Quality Acceptance Record: Gold K-T7-0 1
44, elevator civil engineering project confirmation
45, elevator installation, renovation and repair file review and room shaft measurement self-inspection record (2)
46, elevator guide rail installation self-inspection record (3)
47 elevator landing door installation self-inspection record (4)
48, elevator load test self-inspection record (5)
- Related articles
- What is Wenzhou Jinke Yin Chengwen Huafu Sales Service Hotline?
- Write a report in classical Chinese
- Who is responsible for the leakage of residential downpipe?
- How much is the price of Shangpin Fushun Fengyuan Rose City?
- Do I have to pay the elevator fee on the first floor of the elevator room?
- Is Dalian Yuetai Zhongnan Jinli worth buying?
- Luoxi New City, Panyu, Guangzhou
- Where is the address of Jingming Community in He Chun?
- Which school is Tianruan?
- Is Wuhan King's Landing International Worth Buying?