Job Recruitment Website - Property management company - Summary of engineering work
Summary of engineering work
engineering department
July work report
Time: July 20 12/day to July 30, 20 1 2.
Dear company leaders and colleagues,
Good morning everyone. Today, the engineering department gave you a work report for July 2065438+2002 according to the company's management regulations.
I. Main tasks completed in July:
1. Repair the time relay for the protection of high-voltage cabinet in the distribution room and the intelligent circuit breaker at the contact of low-voltage cabinet of No.5 transformer, and resume normal use.
2. Repair the leakage of DN 1 10 steel composite pipe on the fifth floor of the hotel, and restore the removed ceiling.
3. The condensed water pipe of the fan coil in the monitoring room is blocked, and it should be repaired from the new cloth pipe and the damaged ceiling.
4. The Y-type filters of the two unfinished air cabinets of the boiler cracked and leaked, and were replaced.
5. The office toilet was damaged by the valve of the backyard water supply pipeline on the fifth floor, and the water supply was restored after replacing the valve.
6. According to the report of the safety management department, the hinge of the stainless steel door leading northwards to the roof of Building A 18 was damaged. In order to prevent accidents, it is fixed with iron wire.
7. The electric telescopic door at the exit of the east lane of Houping steel ladder tripped due to leakage, and it returned to normal after replacing the accompanying cable.
8. Three stainless steel decorative plates at the deformation joints of podium A and C have been loosened and all of them have been fixed to prevent pedestrians and vehicles from falling off.
9. The drainage ductile iron supervisor on the fifth floor is in good condition.
The 30-room restaurant in Block B 10 is open, and the drainage supervisor is blocked many times due to the accumulation of oil pollution. Chemical agents were put into the kitchen and bathroom in Room 2 130 twice to ensure the effective removal of oil stains.
165438+
Building A 12, 1807, the exhaust pipe at the top of the bathroom is leaking. After opening the insulation layer and waterproof layer of the roof, the oil was waterproof again, and the owner confirmed that it was watertight before restoring the insulation layer of the roof.
13, No.29 sewage well of Houping steel ladder has been completely replaced to prevent pedestrians and vehicles from accidents.
All air cabinets in the shopping malls on floors 14 and 1 should be cleaned with filters.
15, all electric meters in the group building were re-counted and sealed, and all sealed and registered. 16,3, the main sewage pipe on the roof sank, and the flower basket screws and iron wires fell off again.
17. Complete the rectification and replacement of the secondary lines of four sewage pump control boxes, and use them in any combination manually and automatically. When the water volume is small, 1 pump can be used for automatic pumping; when the water volume is large, two pumps can automatically drain water at the same time.
18. Replace the valves and check valves of two sewage pumps.
19, the customer service department repeatedly responded that the southbound passage light of Building A was not burned, and organized employees to check and repair it.
20. The ceiling leakage of fortune securities Marketing Department is the leakage around the drainage pipe of the platform on the 6th floor. After inspection, it has been handled.
2 1. fortune securities zhonghu district 2, when it rains heavily, it leaks from the wall. After inspection, it is confirmed that the flange interface of the drainage pipe in the cavity is not tightened, and the thread configuration has been temporarily tightened, which needs further observation.
22.A 1404 reflects water leakage in the window sill. After inspection, it was found that it was caused by water leakage around the shelf supervisor of 1504 air conditioner, which has been temporarily treated and needs to be observed.
23. When the central water pump was inspected, it was found that the seal of 2# pump was leaking, which was not completed due to the damage of valves and check valves.
24. Gong Liu, the electric power bureau, issued a price adjustment notice for residential electricity consumption, informing Xiang Tao, the minister of customer service, that the price increase date would be raised to 0.64 yuan/kWh from the early morning of July 25th.
25. The owner of Room A 1806 reported that the room was leaking. After opening the ceiling at the window, it was found that the corner of the parapet was leaking, and part of the leaking roof had been opened.
26. In the grease trap on the second floor, when it rained heavily, the pump failed to pump water in time, which led to the rise of the basement. A letter has been sent to inform the supermarket to rectify the water pump control box.
27. The number of the leaking room for inspection and treatment is: A 1806, Roof Leak, fortune securities Zhonghu Second District Marketing Department, Window A 1404, Window B17/6, Window B2329, Window B6 19.
28. 1730 Room, the upper part of the kitchen ceiling is seriously leaking oil. After inspection, it was caused by a gap between the top of the kitchen flue and the ground. After degreasing, the gap is temporarily closed with a plugging device, and the effect needs further observation.
29. The zero line of the hotel distribution box on the fifth floor was burnt out. After inspection, it is confirmed that the problem is caused by poor contact of lines in the distribution box. After handling according to the notification method, the problem was solved.
30. Complete the monthly meter reading and send the copy to the Finance and Customer Service Department for review.
3 1. The problem of indoor water meter reflected by the customer service department has been inspected at home, and the residents have been informed that they need to change their meters. The meter can be replaced by the property, and each meter charges 50 yuan fees.
32. Conduct training on the decoration process and operation methods for department employees.
Second, the unfinished work in July
1. Mechanical seal damage and valve replacement of water pump room.
2. Treatment of Water Leakage in Room A1806
3. The customer service department will notify the replacement of the water meter after inspection.
4. The missing evacuation indicator panel of the tower is closed.
5. Maintenance of water leakage in the main water supply pipe on the first floor.
Third, the "unfinished" work causes analysis and solutions
1. Replace the valve and mechanical seal of No.2 water pump whose mechanical seal is leaking in the water pump room, because it is necessary to stop water supply to replace the valve.
Maintenance of the main drainage pipeline at the front roof of the west hall of Block B on the negative first floor should be carried out simultaneously to avoid water stoppage twice.
2. There is water leakage at the top of Room A 1806. Waterproofing should be done after opening the thermal insulation layer and waterproof layer at the top. It is recommended not to cover the insulation board within 8 * 0.5m of the opening, so that the water in the insulation board can naturally flow out and be discharged to the rainwater pipe.
3. Most of the leaking rooms in the tower belong to air-conditioning shelf leakage, and the reason for the leakage is improper connection of condensed water discharge pipes and lax sealing around the main pipe. The treatment method is to urge the residents who have not connected the condensed water pipe to rectify, and the water leakage around the main pipe is blocked by the water leakage king, so that the water around the water pipe will not accumulate. At the same time, residents declare decoration, and issue air-conditioning condensate discharge requirements. The protruding parts of Room 02, 03, 14, 15 of Block B and Room 08 of Block A leak when it rains. Residents are advised to install built-in shutters at the grille position. At the same time of installation, the joint of louver and grille shall be coated with weather-resistant glass glue to prevent water seepage.
4. Urge the residents who need to replace the water meter to do so as soon as possible, and discuss with the customer service department the monthly water receivable for those who drag on or refuse to replace it.
5. The demolished wall in the second area of fortune securities Zhonghu Lake was restored after rain, and no water leakage was observed.
6. It is planned to use DN20 galvanized steel pipe to weld the cover plate of the water retaining ditch in the west lane for local replacement, but it is necessary to buy electric tools for digging, and the price has been implemented as 380 yuan/Taiwan in Wujiaohua Shopping Mall.
7. Supervise Gong Liu of the Power Bureau to correctly adjust the display bar of the negative control terminal in the distribution room on July 30th, so as to avoid the data error caused by incorrect display from affecting the settlement and payment of electricity charges.
8. The late resignation of department employees will affect the implementation of the plan.
Fourth, the work plan for next month
1. Continue to follow up the unfinished plan of last month.
2. Deal with all kinds of problems found by customer service department every day.
Presenter:
July 29, 1965 438+02
Chapter II: Monthly Summary of Engineering Construction
/kloc-work summary in 0/2 and work plan for next month
I. Description of the progress of the standard area project:
1, earthwork backfilling of conveying ditch in limestone yard is completed; Complete the excavation of lattice column and track foundation, complete the construction of lattice column 13 span, and organize the construction of 10 span, complete the construction of track foundation for 80m, and complete the binding of reinforcement for 50m track foundation; The foundation construction of the transportation corridor from the storage yard to the raw material mixing warehouse is 70% completed.
2. The construction of combined storage structure below13m is completed; The 23-meter board of the raw material batching warehouse began to support the formwork, and the railing of the warehouse wall began to be installed.
3. The raw material grinding foundation has been handed over, and the construction of piping and truss foundation has started; The main frame of the feeding building has been handed over and the silo is being installed; The cyclone main frame has been completely handed over, and the construction of the first floor wall has been completed by 60%; The main frame of the electrostatic precipitator at the kiln tail has been handed over, and the construction of the second floor wall has been completed by 80%; The main frame of humidifying tower has been installed; The chimney at the end of the kiln was built to 23 meters.
4. The main frame of kiln tail has been handed over, and the construction of the first floor wall has been completed by 70%; Backfilling treatment of high-temperature fan foundation is completed; Elevator shaft foundation construction is completed; Backwashing treatment of bucket pit is completed.
5. The slipform construction of the raw material warehouse reached the top, and the scaffolding in the warehouse began to be dismantled. 6. The pier foundation in the kiln has been handed over, and the foundation backfill within 3# tons has been completed. 7. The construction of15.5m layer flyash concrete is completed, and the binding of the foundation reinforcement of the coal mill is completed.
8. Construction of 9-meter-layer structure of kiln head electrostatic precipitator: once the foundation pit construction is completed, 70% of the second floor of the foundation pit will be bound with steel bars; The foundation construction of grate cooler is completed by backfilling with mortar rubble; Construction of kiln head chimney foundation is completed.
9. The clinker silo is inverted to the bottom of the ring beam (20.8m) to complete the trench foundation excavation.
10. The main structures of pH boiler and AQC boiler have been submitted. 1 1. Three-layer structure construction of steam turbine room. Second, the standard area drawings in place:
List of drawings submitted this month:
Drawings urgently needed next month: mine crushing and conveying corridor, mine office and machine maintenance workshop, cooling tower drawings.
Three. Basic situation of field personnel and machinery in Bid A:
1, personnel: concrete worker: 16, carpenter: 84, rebar worker: 57, bricklayer: 1 1, steel structure: 24, slipform worker: 9.
2. Machines and tools: 4 tower cranes, 2 excavators, 3 mixing stations, 1 Sky Pump, and 2 tank cars.
Four. Summary of quality and safety accidents in Bid A this month:
1. When pouring concrete, the inclined column of the grid frame of limestone yard is not vibrated properly, resulting in honeycomb pits after formwork removal.
2. Because the elevation control of the builder of the construction unit is not in place, the post reinforcement in the limestone yard is 20cm different from the design elevation of the drawing after the construction.
3. On the day when the slipform of the raw material warehouse began to slide, the construction unit did not arrange electricians and bricklayers to be on duty, which led to a large area of concrete falling off the warehouse wall.
Verb (the abbreviation of verb) summarizes the factors that restrict the progress of each sub-item:
1, material:
(1), the scaffolding and templates of the construction unit were not used in time, resulting in the lack of scaffolding and templates in the preparation of the federal reserve and pulverized coal.
(2) The diameter of the stone supplied by the self-provided sand yard is too large, which leads to the preparation of pulverized coal on site.
When pouring concrete in 10 meter layer, the pipe is blocked and the wall concrete of raw material warehouse falls off in a large area.
2, the construction unit personnel problems:
(1), there are too few welders for electroslag pressure welding of steel bars on site, which can't guarantee the welding progress of vertical steel bars of frame columns and clinker silo walls on site.
3. Drawings:
(1), the drawings of the superstructure of the kiln head main workshop were not present, which made it impossible to organize the superstructure construction on site.
(2) The scheme of mine conveying corridor has been delayed, so limestone crushing can't be constructed. (3) The basic equipment of each exhaust gas treatment fan is to be determined, which will affect the on-site organization and construction.
Intransitive verbs work plan for next month:
1, schedule management:
(1), start the civil construction of mine crushing conveying corridor.
(2) The lattice column and track foundation of limestone yard are all completed; Power grid installation began; The transportation corridor from the storage yard to the raw material mixing warehouse is 60% supported.
(3), 19.8 meters below the joint storage building structure is completed; Complete the construction of the wall of the raw material mixing warehouse.
(4), ground equipment foundation construction; Brick wall masonry of cyclone drum and electrostatic precipitator is completed; Construction of electric dust removal power room at kiln tail is completed.
(5) The kiln tail power room is completed; High temperature fan foundation construction is completed; Bucket pit construction is completed.
(6), raw material library cone construction is completed; The foundation at the bottom of the reservoir has been completed. (7) Install the third air duct in the kiln.
(8) After the main structure of pulverized coal preparation is completed, the coal grinding foundation shall be delivered on June 65438+1October 65438+May 5. (9) The main structure of kiln head is completed.
(10), the clinker silo is handed over and the grid is installed; Summarize that trench construction is completed by 50%.
(1 1), the main structure of the steam turbine room is completed.
(12), after construction, it will go down to the kiln head and cross the cable trench in the highway section. 2, quality management:
(1), after the grid installation unit comes into the site, it is required to provide the material certificate of the materials in the site, and organize the construction unit and installation unit to accept the thickness of the grid screws.
(2) Strengthen on-site steel structure derusting, painting and welding quality acceptance. 3, safety management:
(1), urge the construction unit to strengthen the civilization education in the security team, and it is strictly forbidden to use open flame to keep warm at the scene.
(2), urge the construction unit to start 4, project cost information, visa information management:
(1), sort out the handling of the construction confirmation form of each subdivisional work, and urge the construction unit to handle it in time.
(2) Design change orders and blue prints.the design. The design and engineering changes of Bid A shall be printed on the drawings, initially forming the as-built drawings, and shall be countersigned by the organization.
(3), urge the construction unit to declare the kiln head inclined zipper, limestone yard gong plate truss hoisting scheme.
5, engineering material management:
(1), urge the construction unit to declare the scheme of PVC doors, windows and tracks in Bid A in time. (2) for the shortage of cement, urge the construction unit to declare the cement dosage plan two days in advance.
(3) Strengthen the management and control of steel bar garbage disposal at the site of the construction unit.
Date:
Person in charge of standard area:
Chapter III: Work Summary of Engineering Department in June
Work Summary of Engineering Department in June and Work in July
According to the company's unified deployment, with the strong cooperation and concern of all departments, the engineering department has continuously completed the office building decoration, loop survey and setting out, geological exploration and loop project establishment. The specific work in June is summarized as follows:
(1) Office Building Decoration Project
The office building renovation project entered the site on June 1 and has been under construction for one month. Now, the staff quarters and office parts have been delivered for use, and the project has entered the final filling stage.
(b) loop project work
Under the full guidance of the administrative committee, development and reform bureau and other government departments, the ring road project cooperated with the engineering department to carefully organize the preparation of relevant materials for the project, and reported them to relevant departments, which are now under examination and approval.
(three) the ring road survey and geological exploration work
According to the overall plan, the survey and setting-out of the loop line is carried out by Sunshine Surveying and Mapping Company, and the drilling survey and setting-out work has been completed, and 52 points need to be measured. With the strong cooperation of relevant government coordination groups, efforts have been made to coordinate the relationship between local residents and water supply and power supply, and the work has been steadily advanced. Now, 20 points have been drilled.
Work plan for July:
(1) The office building renovation project is planned to be completed and put into use before July 6th. Organize acceptance, handle
Reconciliation.
(2) Continue to do a good job in geological exploration of the ring road and complete the remaining 32 drilling points. Before July 10.
Complete all the work of geological exploration and drilling.
(three) to complete the overall planning review, resettlement planning review related work.
(4) Formulate relevant systems for project management.
(five) to complete the relevant work of loop construction and design, and make preparations before loop construction.
(6) Make preparations for the commencement of construction.
(VII) Strive to complete other tasks assigned by the Company.
engineering department
time
Chapter IV: Work Summary of Engineering Department in May
Work Summary of Engineering Department in May
First, the actual completion of the project this month
1.H3 Dormitory: The interior powder, exterior powder, ceramic tile, 80% roof tile, drainage installation, water supply riser, underground fire fighting and fire fighting horizontal pipe on the sixth floor are completed.
2.H4 Dormitory: 50% of floor tiles are pasted, 30% of sanitary porcelain is finished, 50% of external wall tiles are pointing, 40% of roof leveling layer is finished, 80% of drainage is completed, and 70% of water supply is completed.
3.H5 dormitory: 30% interior wall painting, 40% exterior wall brick pasting, 40% drainage, 40% water supply area 1 and 40% water supply area 2 are completed.
4. Teaching building in Area A: secondary main body of floors A 1, A3 and A5 is completed, thermal insulation layer A5 is completed, external wall plastering of floor A5 is completed 60%, secondary structures A2 and A4 are completed 60%, fire pipes A 1, A3 and A5 are installed, threading of floors A3 and A5 is completed, and A 1, A3 is completed.
5. Teaching building in Area B: the secondary structure of the first floor of B 1, B3 and B5 is completed, the roofing leveling layer of B 1, B3 and B5 is completed, the secondary structure of B2 and B4 is completed by 60%, and the threading of the second to fifth floors of B 1, B3 and B5 is completed.
6. Warehouse: the first to fourth floors are finished, the fifth and sixth floors are finished with secondary structures, the roofing leveling layer is 60%, the main body inspection is completed, the main body acceptance is completed, the fire riser is 70%, the ventilation backwater is 65,438+00%, and the electrical piping is 80%.
7. Art Building: The secondary structure of the 2nd, 3rd and 4th floors in the west area is completed, and the sloping roof is completed; Dongpo roof is completed, east masonry is completed by 90%, and west electrical piping is completed.
Into 70%, fire control buried bottom, water supply and drainage buried bottom, water supply and drainage in the east,
After the fire is buried, the electricity is completed 10%.
8. Dining room: plastering of the internal and external walls of the first to third floors is completed, 90% of the first floor is completed, fire fighting, water supply and drainage are buried, 65% of electrical piping is completed, and internal drainage is completed.
50% completed.
9. The main body of the first floor of the logistics service building is completed.
Foundation treatment of teaching building in 10 area. C is completed, and the foundation cushion is completed.
1 1 area teaching building foundation concrete. D done.
12. 80% of the foundation reinforcement binding of the academic exchange center is completed, and 50% of the formwork is completed.
13. The foundation reinforcement of administrative office building is bound by 20%.
14. 50% of the steel bars on the first floor of the basketball hall are bound, and 70% of the formwork is completed. The foundation of swimming pool is completed, and the first floor steel formwork is completed by 20%.
15. 70% of the foundation reinforcement of the financial building was bound.
16. Pile foundation detection of building No.38 with clear water and blue sky was completed, and earthwork excavation between piles of buildings No.36 and No.29 was completed.
17. Clear water and blue sky 1#, foundation pit excavation of building 2 is completed, and foundation pit excavation of building 3 is completed by 50%.
18. Pile foundations of buildings with clear water and blue sky 13# and 20# are completed.
19. Construction of external network roads began.
Second, the quality and safety situation
This month, the quality will be strictly controlled, and some inspections will be carried out in strict accordance with the regulations to ensure that
All sub-items of the project are qualified, especially the quality of raw materials in the project. All kinds of building materials entering the site shall be accepted by the quality inspection team. Only after passing the inspection can you enter the site, and those who do not meet the requirements will leave immediately. The project quality is guaranteed, and all the projects completed this month are qualified.
For safety problems, strengthen safety management, and immediately request to stop work and rectify the engineering parts with potential safety hazards. Construction shall not be carried out if the rectification is not in place. All kinds of machinery must be inspected by Party A's supervisor after installation, and can only be put into use after passing the inspection. And the intensity of safety punishment has been strengthened for each project department, so that each project can enhance safety awareness and attach great importance to safety. There was no safety accident this month.
Third, others.
In order to ensure the smooth progress of the project, students moved in, and the commercial and residential area started smoothly in August, the engineering department cooperated with the development department and the logistics department of the college to make a number of communication and docking work, such as the elevation change of the commercial and residential area, the determination of the road pipe network scheme, the later management of the college, and the layout change of the teaching building.
Fourth, the focus of work next month
1. Quality of interior and exterior wall decoration works and installation works in the first phase of the College. Strictly control the quality of the first-phase decoration materials and installation materials. Ensure engineering
Progress, to ensure safety. Next month, the first phase of the road and pipe network project must be guaranteed.
Quality assurance quantity completion plan.
2. The second phase of the college project: strengthen management to ensure that it is completed as planned.
Engineering Department of Huaxin College New Campus 2065438+June 2, 2000
Chapter V: Monthly Work Summary of Construction Projects
Summary in April
A hectic month has passed, and I spend every day arguing and bickering, but the problems must be implemented one by one.
1. All seven tower cranes on the construction site have been put into normal operation. After the grounding test of each tower crane, the test data value and self-inspection report have been sent to the project department.
2. Nearly 200 workers have completed the three-level safety education for construction workers in two labor service companies. Workers who subsequently entered the site continued to receive re-education, and two safety meetings were held for two laborers respectively, and video materials were left.
3, special type of work personnel certificate to the project department, to verify whether the certificate is consistent with people.
4. The secondary box and switch box on the construction site should have the name and telephone number of the person in charge, and each mechanical equipment should be grounded.
5. Set up on-site processing shed, and the processing area is equipped with fire-fighting equipment according to the area; Fire extinguisher, fire bucket, fire pool.
6. Now, scaffolding is being built on every floor. Before erection, the scaffolder shall be given technical disclosure on construction safety at the site, and erection shall be carried out according to the construction plan, and the data shall be saved.
7, according to the requirements of civilized construction, according to modern management science, do a good job in the management of the construction site. The green space service is well done.
Houweizhai projects department
Safety Officer: Ma Zhongshan 2065438+April 30, 2004
- Previous article:What kind of animation is this?
- Next article:What is the telephone number of Wuxi Landun Property Management Co., Ltd.?
- Related articles
- How to attract investment for agricultural and sideline products in Wuhu city
- From what aspects does Shenzhen evaluate the advantages and disadvantages of shops in Huanggang border inspection living area and how to buy property rights?
- Business hours of Kuncheng Plaza
- How to clean the floor heating pipeline
- Seven planning schemes of national day theme activities
- How about Zhu Rong (Wuhan) Real Estate Development Co., Ltd.
- How much is the price of Xingtai Midea Times City?
- I don't know much about Tianyuan dike in Hefei. Do you do outsourcing? What are the development prospects and treatment? How about it company in Hefei?
- How about Shenzhen Haotianxia Property Management Co., Ltd.?
- What's the price of Bao Li reading platform in Chongqing?